Michael Glenn Murphy
Engineer · Ware Malcomb · Walnut Creek
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeCivil Engineer C-43696First issued Aug 19, 1988, expires Mar 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 8 permits since 2015, 8 in the last 5 years. Latest filed Jun 9, 2025.
- What kind of projects?
- Other 5 · Commercial or tenant improvement 1 · Deck, stairs or patio cover 1
- How long do their permits take?
- Retaining wall or site work: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Other: 5 permits in San Francisco
Time to get a permit
Median from filing to permit, from 5 issued permits filed since 1966.
Where
- Mission4
- Sunset/Parkside1
Most recent
- 55 Erie StInstall 8 ev charges for 16 vehicles convert from vehicle storage lot to fleet charging use.Oct 19, 2022Issued
- 150 V 14th StLot 5: install (5) ev chargersfor 10 vehicles for spob 71-80, convert from vehicle storage lot to fleet charging use.Oct 19, 2022Issued
- 73 Erie StInstall 13 ev charges for 26 vehicles convert from vehicle storage lot to fleet charging use.Oct 19, 2022Issued
- 150 14th StLot 3: install (6) ev chargers for 12 vehicles, convert from vehicle storage lot to fleet charging use.Oct 19, 2022Issued
- 1900 Noriega StInstallation of 4 new ev charging station. striping and signage for charging stalls. not open to general public only to the patron of the bank/officers. for accessory use for the bank clientsMar 24, 2022Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Jun 9, 2025 | 73 Erie St The scope of work includes a proposed type v, 1 story pre-fabricated trailer by others- plan approval #mac-cm 10067 along with associated flatwork. flatwork improvements including grading of onsite concrete and asphalt areas surrounding the building & the accessible paths of travel from Issued | Retaining wall or site workType unconfirmed | Issued | Within 1 month | |
| May 5, 2025 | 73 Erie St Revision to 202210194663 & 202501299316. updated utility connection, relocation of (e) temporary lights/ install permanent lights, update of electrical equipment locations, add lota devices Issued | Revision or supplement | Issued | 1 month | |
| May 5, 2025 | 140 14th St Revision to permit 202210194657 and 202501299326. temporary light relocation to permanent location. update of electrical equipment locations and electrical yard. re-striping of stalls and drive aisles to provide new u-turn lane, fencing, gate updates. add lota devices. Issued | Revision or supplement | Issued | 1 month | |
| Jan 29, 2025 | 55 Erie St Revision to 202210194666 included: replace 2 abb 184 chargers w/ 2 abba 400 chargers, added utility trench detail. update erosion control notes, added fence & gate detail Issued | Revision or supplement | Issued | 1 month | |
| Jan 29, 2025 | 140 14th St Revision to pa # 2022-1019-4657 replace 4 abb 184 chargers with 4 abb a400 chargers; added utility trench detail; updated erosion control notes; added fence & gate detail. no work in public right of way Issued | Revision or supplement | Issued | 1 month | |
| Jan 29, 2025 | 73 Erie St Revision to permit# 202210194663: added utility trench detail, updated erovsion control notes, added fence and gate detail. Issued | Revision or supplement | Issued | 1 month | |
| Oct 19, 2022 | 55 Erie St Install 8 ev charges for 16 vehicles convert from vehicle storage lot to fleet charging use. Issued | Other | Issued | 13 months | |
| Oct 19, 2022 | 150 V 14th St Lot 5: install (5) ev chargersfor 10 vehicles for spob 71-80, convert from vehicle storage lot to fleet charging use. Issued | Other | Issued | 13 months | |
| Oct 19, 2022 | 73 Erie St Install 13 ev charges for 26 vehicles convert from vehicle storage lot to fleet charging use. Issued | Other | Issued | 13 months | |
| Oct 19, 2022 | 150 14th St Lot 3: install (6) ev chargers for 12 vehicles, convert from vehicle storage lot to fleet charging use. Issued | Other | Issued | 13 months | |
| Mar 24, 2022 | 1900 Noriega St Installation of 4 new ev charging station. striping and signage for charging stalls. not open to general public only to the patron of the bank/officers. for accessory use for the bank clients Complete | Other | Complete | Within 1 month | |
| Mar 23, 2021 | 640 Townsend St Use of power door operators in lieu of level landing at doors. Complete | Commercial or tenant improvement | Complete | 6 months | |
| Oct 23, 2015 | 2598 Taylor St Revision to pa#201509298348 structural revision. n/a ordinance #155-13 Complete | Revision or supplement | Complete | Within 1 month | |
| Sep 29, 2015 | 2598 Taylor St Replace 250 sq ft +/- of exterior concrete steps with a concrete ramp, maher not required Complete | Deck, stairs or patio cover | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Michael Glenn Murphy? Request a correction.