Michael Hoppe
Engineer · Method Structures, Inc · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeCivil Engineer C-75460First issued Nov 18, 2009, expires Mar 31, 2028.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 20 permits since 2015, 20 in the last 5 years. Latest filed Sep 30, 2022.
- What kind of projects?
- Home remodel 9 · Addition 3 · Seismic retrofit or foundation 3
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 9 permits in San Francisco
Time to get a permit
Median from filing to permit, from 9 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 5,514 permits.
Where
- West of Twin Peaks4
- Lone Mountain/USF1
- Noe Valley1
- Outer Richmond1
Most recent
- 1065 Baker StVoluntary structural improvements to ground floor, second level and extg crawl space.Sep 30, 2022Issued
- 198 Chattanooga StVoluntary structural improvements. new shearwall & grade beam & footing for existing steel beam in existing elevated crawl space.Dec 18, 2020Complete
- 126 Monterey BlInterior residential remodel with partial bearing wall removal at 2nd level per planJan 10, 2020Complete
- 332 Magellan AvBathroom remodel @ 2nd floor with elevated roof section and new skylight openings. work not visible from streetJul 1, 2019Complete
- 48 Coventry CtInterior remodel; kitchen, stairway, 2 bath rooms, bedroom remodel, laundry closet, new fav & tankless water heaterMar 7, 2019Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Dec 22, 2022 | 4160 23rd St Revision to no-plan permit 202209222970. kitchen remodel, move laundry to 3/f, window replacement at rear, rear door replacement. enlarge pass thorugh kitchen opening. Complete | Revision or supplement | Complete | Within 1 month | |
| Oct 19, 2022 | 1065 Baker St Revision to bpa#202209303544, shear wall revisions due to field conditions Issued | Revision or supplement | Issued | Within 1 month | |
| Sep 30, 2022 | 1065 Baker St Voluntary structural improvements to ground floor, second level and extg crawl space. Issued | Home remodel | Issued | Within 1 month | |
| Jul 25, 2022 | 579 19th Av Revision to bpa# 201904228558. show footing and detail for permitted stairs. rear stairs requires footing not shown in originally permitted plans. Issued | Revision or supplement | Issued | Within 1 month | |
| Nov 12, 2021 | 278 Randall St Revision to approved permit# 201912200214. ground flr changes per plans. removal of new bath and associated excavation, ceiling height and foundation changes at approved horizontal addition. Complete | Revision or supplement | Complete | Within 1 month | |
| Sep 10, 2021 | 70 Montezuma St Voluntary structural improvement to (e) front balcony, new steel beams. Filed | Deck, stairs or patio coverType unconfirmed | Filed | — | |
| Dec 18, 2020 | 198 Chattanooga St Voluntary structural improvements. new shearwall & grade beam & footing for existing steel beam in existing elevated crawl space. Complete | Home remodel | Complete | Within 1 month | |
| Jan 10, 2020 | 126 Monterey Bl Interior residential remodel with partial bearing wall removal at 2nd level per plan Complete | Home remodel | Complete | 1 month | |
| Dec 20, 2019 | 278 Randall St 1016 sf addition: 3 story vertical and horizontal addition @ property line. addition to include 2 new bathrooms, 1 new bedroom, and 1 new family room. Complete | Addition | Complete | 19 months | |
| Jul 1, 2019 | 332 Magellan Av Bathroom remodel @ 2nd floor with elevated roof section and new skylight openings. work not visible from street Complete | Home remodel | Complete | Within 1 month | |
| Mar 7, 2019 | 48 Coventry Ct Interior remodel; kitchen, stairway, 2 bath rooms, bedroom remodel, laundry closet, new fav & tankless water heater Complete | Home remodel | Complete | Within 1 month | |
| Feb 13, 2019 | 654 15th Av Remodel kitchen and bath at 2nd fl add powder rm. 2nd fl add 2nd full bath, remodel master bath. voluntary seismic upgrade. Complete | Home remodel | Complete | 1 month | |
| Aug 23, 2018 | 453 Douglass St Kitchen remodel and bearing wall removed at 2nd floor. Issued | Home remodel | Issued | Within 1 month | |
| Dec 1, 2017 | 1750 29th Av Replace existing site retaining walls w/new concrete retaining walls at rear yard. Complete | Retaining wall or site work | Complete | 7 months | |
| Dec 1, 2017 | 166 Bridgeview Dr Voluntary strengthening on top floor trace holddowns to foundation. Complete | Seismic retrofit or foundation | Complete | Within 1 month | |
| Oct 10, 2017 | 350 Teresita Bl Changing storage into acclimated space including bedroom, full bath & 1/2 bath, study room and mudroom at 1st story; reconfigure interior stairs, relocated kitchen & bath & add (n) bath; new wood deck off rear yard, new windows & skylights Complete | Home remodel | Complete | Within 1 month | |
| Sep 15, 2017 | 2313 Webster St Soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. n/a for maher Complete | Seismic retrofit or foundation | Complete | 2 months | |
| Jan 31, 2017 | 278 Randall St 2nd floor - interior remodel of (e) kitchen, bearing wall removal and bath addition on 2/f. lighting to comply with cec 150(k). Complete | Home remodelType unconfirmed | Complete | Within 1 month | |
| Dec 13, 2016 | 459 Teresita Bl Convert (e) ground floor storage platform into 3 bedrooms, 3 baths, a dressing area and a closet. add a hall to the existing garage for egress from the ground floor to the exterior. habitable space addition of 298 sq. ft. Complete | AdditionType unconfirmed | Complete | 3 months | |
| May 6, 2016 | 2562 21st Av New sunken patio & retaining wall in rear yard Complete | Retaining wall or site work | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Michael Hoppe? Request a correction.