CheckMyDesigner

Michael John Stanton

Architect · Stanton Architecture · San Francisco

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeArchitect C-11562First issued Dec 3, 1980, expires Jan 31, 2027.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the California Architects Board enforcement list on Nov 5, 2026.

Worked in San Francisco?
207 permits since 2004, 207 in the last 5 years. Latest filed Jan 16, 2026.
What kind of projects?
Commercial or tenant improvement 128 · Other 42 · New building 9
How long do their permits take?
Commercial or tenant improvement: 1 month. City typical for the same review: within 1 month.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Commercial or tenant improvement: 128 permits in San Francisco

From 2004 to 2026, latest filed Jan 16, 2026.
Permits
283 permits that name Michael John Stanton, newest first, including 76 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Aug 11, 2026555 Post St

Revision to 202305057166, 2023-09206pta: add replacement of 2 penthouse windows with new aluminum windows. removal of east coping under 202306099668. coping shall be installed under sep permit.

Complete
Jan 30, 20261050 Van Ness Av

Revision to pa 202302212276 - add a new bridge connecting the motel to the exterior walkway @ the northeast corner of the hotel, and update walkways. also, the guest bathroom @ rm #535 will be converted from an acc r1 shower to an acc tub to satisfy iib-224.2

Filed
Jan 16, 2026401 Taylor St

Ti to an (e) restaurant space. scope includes the select removal of walls, accessible improvements, new flooring, finishes, wall tile & upholstrey, select light fixtures & bar equipment to be replaced. elec & plumbing under trade permit. no exterior scope, change to exits or mechanical scope

Complete
Oct 28, 2025165 Steuart St

Replacement of 16 wood window sashes at the penthouse level. new window shall be all wood casement windows to match (e).

Complete
Oct 28, 2025188 King St #201

Project scope is to erect two non structural partitions and a single door to create a mail storage room. no structural work. fa, fs, mep under separate permit. (work in lobby/common area)

Complete
May 1, 2025747 Front St

Install a partition and glazed al. (pair) doors to create new wellness room. also infill (e) opening on wall. m.i.p. under sep permit.

Filed
Oct 28, 20241652 Stockton St #0

Comply with nov # 202429451 renovation of (e) restaurant with same layout. demo & replacement of walls, floors, ceiling finishes, fixtures, counters and seating. no change to facade, use or fls.

Complete
Sep 18, 2024345 04th St

Revision to pa# 202310037897, change of egress occupant load in large conference room 705, levl 7.

Complete
Mar 15, 2024335 Powell St

Addition of 2 trellisses on level 2 north and south balcones. work on balcones and adj space performed under bpa#202212299387

Complete
Feb 23, 2024400 Alabama St

Level 2 tenant space: addition of a lactatioin room to an (e) tenant space and demolition of (e) call booths. selective demo of walls and doors. no exterior work. mep & fire sprinkler under separate permit.

Complete
Feb 23, 2024400 Alabama St

Level 3 tenant space: addition of conference rooms to an (e) tenant space. selective demolition and installation of walls and doors. no exterior work. mep & fire sprinkler under separate permit.

Complete
Feb 7, 2024716 Sacramento St

Comply with the accessible business entry program. abe#201911258778. scope of work includes leveling entryway at 716 sacramento st to make it compliant with the accessible business entrance regulation. scope includes extension of existing rail and addition of curb and foor operator push button

Filed
Oct 10, 2023335 Powell St

Revision of ceiling and associated lighting configuration to pdr space. this is a permit revision for 202305238377. remove one door from pdr space.

Complete
Oct 3, 2023345 04th St

Build out of interior spaces of the existing structure at 345 4th for administrative use by taipei economic and cultural offices teco in sf. levels 5-6

Complete
Oct 3, 2023345 04th St

Build out of interior spaces of the existing structure at 345 4th for administrative use by taipei economic and cultural offices teco in sf. level 3 and 4

Complete
Oct 3, 2023345 04th St

Build out of interior spaces of the existing structure at 345 4th for administrative use by taipei economic and cultural offices teco in sf. level 7 and roof

Complete
Oct 3, 2023345 04th St

Build out of interior spaces of the existing structure at 345 4th for administrative use by taipei economic and cultural offices teco in sf. including gr fl reception/receiving area and cultural education area for level 1 and 2

Complete
Jul 14, 2023335 Powell St

Renovation of (e) level 1.5 mezzanine kitchen. fire alarm and fire sprinkler under sep permit. no change to (e) mech systems. (e) hvac/hood & duct to remain.

Complete
Jun 15, 2023335 Powell St

Renovation of (e) restaurant seating area. add new lobby bar + finishes. replace interior storefront at private dining room entry. fire sprinkler + alarm under separate permit. **associated with 2023-001338prv project review meeting with rebecca salgado.

Complete
May 23, 2023335 Powell St

Renovation of (e) clock bar space to new pdr lounge located north of historic lobby. f/a & f/s under separate permit. seating area only, no food or drink prep

Complete

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Michael John Stanton? Request a correction.