Michael Raymond Hilliard
Architect · Hilliard Architects · Fresno
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-11807First issued May 11, 1981, expires Nov 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 19 permits since 2004, 19 in the last 5 years. Latest filed Aug 20, 2024.
- What kind of projects?
- Commercial or tenant improvement 16 · Home remodel 2 · Other 1
- How long do their permits take?
- Commercial or tenant improvement: 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 16 permits in San Francisco
Time to get a permit
Median from filing to permit, from 11 issued permits filed since 1966; 3 still in review. City is the San Francisco median for the same kind of review, from 4,704 permits.
Where
- Pacific Heights3
- Portola2
- Sunset/Parkside2
- Presidio Heights2
Most recent
- 645 Chestnut StTo comply with abe ord 51-16 abe 201912109598 replace threshold w/new max 1/2" high; new sidewalk less than 1/2" lower than floor, provide door lever: provide power door operator to keep existing pair of 30" doors (11b-404.3.1: doorways shall provideAug 20, 2024Filed
- 2448 San Bruno AvAbe# 201812283582- response to entrance and accessibility parking upgrades (new accessible van parking) new retaining wall 42"high above accessible van parking space, etc. new pour in place bollards (n) power door operator to serve main entry door to (e) laundromat. actuator paddles inside & outsideApr 26, 2024Filed
- 4083 24th StAbe 201908125993. make modifications to provide an accessible business entrance per ordinance 51-16. provide new curb and concrete sidewalk that aligens with building entry.Aug 22, 2023Withdrawn
- 1201 Ortega StScope includes removal of moisture damaged (e) floor slab on grade to edge of walls in 2 rooms (class #117 & multi purpose room #129) on the 1st fl; installation of (n) concrete slab over 15-mil x-treeme wood below slab vapor barrier membrane. provide polished concrete finish in both roomsJul 18, 2023Complete
- 2444 San Bruno AvProject is solely for accessibility upgrades per ord 51-16. within an (e) exterior door frame a new accessible door & entrance will be built, with some minor changes to interior walls & moving 4 dryers. a new accessible van parking space will be built within the (e) parking lot. abe #201812283582.Dec 14, 2022Filed
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Aug 20, 2024 | 645 Chestnut St To comply with abe ord 51-16 abe 201912109598 replace threshold w/new max 1/2" high; new sidewalk less than 1/2" lower than floor, provide door lever: provide power door operator to keep existing pair of 30" doors (11b-404.3.1: doorways shall provide Filed | Commercial or tenant improvement | Filed | — | |
| Apr 26, 2024 | 2448 San Bruno Av Abe# 201812283582- response to entrance and accessibility parking upgrades (new accessible van parking) new retaining wall 42"high above accessible van parking space, etc. new pour in place bollards (n) power door operator to serve main entry door to (e) laundromat. actuator paddles inside & outside Filed | Commercial or tenant improvement | Filed | — | |
| Aug 22, 2023 | 4083 24th St Abe 201908125993. make modifications to provide an accessible business entrance per ordinance 51-16. provide new curb and concrete sidewalk that aligens with building entry. Withdrawn | Commercial or tenant improvement | Withdrawn | — | |
| Jul 18, 2023 | 1201 Ortega St Scope includes removal of moisture damaged (e) floor slab on grade to edge of walls in 2 rooms (class #117 & multi purpose room #129) on the 1st fl; installation of (n) concrete slab over 15-mil x-treeme wood below slab vapor barrier membrane. provide polished concrete finish in both rooms Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Dec 14, 2022 | 2444 San Bruno Av Project is solely for accessibility upgrades per ord 51-16. within an (e) exterior door frame a new accessible door & entrance will be built, with some minor changes to interior walls & moving 4 dryers. a new accessible van parking space will be built within the (e) parking lot. abe #201812283582. Filed | Commercial or tenant improvement | Filed | — | |
| Jul 15, 2022 | 274 Brannan St Basement and gr floors, structural reinforcement for 2 openings at basement level, gr level. structural reiforcemnt at existing slab for future conduit runs Cancelled | Home remodel | Cancelled | Within 1 month | |
| Feb 11, 2020 | 1930 Fillmore St To comply with abe ord 51-16 install power door opener Complete | Commercial or tenant improvement | Complete | 4 months | |
| Oct 16, 2019 | 2115 Irving St To comply with accessible business entrance program per ordinance 51-16.business entrances Complete | Commercial or tenant improvement | Complete | 5 months | |
| Sep 13, 2019 | 3250 Geary Bl Provide accessible toilet room Complete | Commercial or tenant improvement | Complete | 5 months | |
| Aug 30, 2019 | 799 Valencia St Barier removal only in compliance with ordinance #51-16 at commercial tenant space. 791 and 799 valencia st Cancelled | Commercial or tenant improvement | Cancelled | — | |
| Aug 30, 2019 | 3250 Geary Bl Accessibility upgrades only. including compliance with abe ord. 51-61 and Complete | Commercial or tenant improvement | Complete | 5 months | |
| Apr 9, 2019 | 1331 Harrison St Change of use from garment shop to "e" occupancy day care under 30 children. Complete | Commercial or tenant improvement | Complete | 4 months | |
| May 3, 2017 | 1 Embarcadero Center Tenant improvement retail space lobby lvel 2310 sf no facade work, no ext modifications includes new kitchenette, new toilet rm maher not req Complete | Commercial or tenant improvement | Complete | 1 month | |
| Jun 12, 2009 | 437 Sutter St A minor remodel of existing store room. located on the 2nd. floor. (e) restroom will remain. the remaining space will be divided w/ (n) wall configuration to divide a (n) stock area from the main space. (if needed electrical or hvac will be on a separate permit). Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jun 8, 2006 | 1400 Geary Bl #0 Level b, demo all drop ceiling (a-o2) new ceiling throughout new computer room ceiling suspended form steel joists(structural calcs) Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| May 5, 2006 | 953 De Haro St Replace 35 street facing windows sashes with replica. 30 non-street facing exterior and interior window sashes replaced with fiberglass sash & frame. replace 1 steel door & 1 wood french door. replace hardware for 6 doors.paint/patch windows & doors. non street facing replacement windows. Complete | Other | Complete | 5 months | |
| Mar 21, 2005 | 1400 Geary Bl #0 Furr out walls, new soffits w/cove hights, gilded barrel vault ceiling in elevator lobby. Expired | Home remodelType unconfirmed | Expired | Within 1 month | |
| Dec 6, 2004 | 1700 California St Oti-2, 2nd floor, el, me. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Dec 6, 2004 | 1700 California St Oti-1, 2nd floor, el, me, sp. Complete | Commercial or tenant improvement | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Michael Raymond Hilliard? Request a correction.