CheckMyDesigner

Mike Abell

Engineer · City Structural Inc · San Francisco

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeCivil Engineer C-81125First issued May 29, 2013, expires Sep 30, 2027.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the BPELSG enforcement list on Nov 5, 2026.

Worked in San Francisco?
50 permits since 2015, 50 in the last 5 years. Latest filed Jun 29, 2026.
What kind of projects?
Seismic retrofit or foundation 29 · Home remodel 13 · Legalize or fix a violation 3
How long do their permits take?
Seismic retrofit or foundation: 4 months. City typical for the same review: within 1 month.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Permits
58 permits that name Mike Abell, newest first, including 8 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Jun 29, 202625 Parnassus Av

Seismic strengthening. interior and exterior remodel to include replace rear door in kind and mep work.

Filed
May 29, 2026373 Capp St

Voluntary strengthening at ground floor.

Complete
May 23, 20252230 Mission St

Foundation repair, replace due to field condition. reference building permit# 2018-0914-0336. upgrade existing restroom to fully accessible.

Issued
Feb 4, 2025501 Crescent Av

Revision to approved pa # 2021-0317-6756 add 3 (n) bathrooms, relocate the kitchen & reconfigure interior walls. rear yard design. change window frame material from aluminum to fibrex. change wall finish stucco to hardie architectural panel. no change to the exterior envelope, total sq ft or

Issued
Aug 6, 2024167 Fair Oaks St

Voluntary strengthening at foundation - new concrete foundation footings cast against existing brick foundation at corners of outer building perimeter and inner building courtyard. new collector elements at g/f framing.

Complete
Jul 18, 20243562 18th St

Structural- garage renovation. removal of existing wood post and beam system. new steel post and beam system with new isolated foundation footings at each new steel post adjustment to layout of hallway typical stud wall. (shared garage)

Filed
Jul 1, 20243854 26th #0

Voluntary strenghtening at ground floor per 2022 cebc ch. a-4.

Complete
Jun 24, 20241490 California St #0

Commecial - soft story retrofit per sfebc chapter 45 engineering criteria 2022 cebs appendix a-4. to comply with nov 202301466. excavate less than 5 cubic yards.

Complete
Jun 24, 20241476 California St

Residential - soft story retrofit per sfebc chapter 45 engineering criteria 2022 cebs appendix a-4. to comply with nov 202301466. excavate less than 5 cubic yards.

Complete
Apr 8, 20241027 Fell St

Voluntary strengthening at ground fl

Complete
Nov 15, 20232230 Leavenworth St

Response to nov# 202313401. new structural calculations for planters on roof. plan shows planters. change guardrail from glass to decorative iron. structural response to connection comment. ref pa# 201909252739.

Issued
Jul 19, 20231 Santa Ysabel Av

Revision to pa# 202306230703. front stair replacement. dry rot repair > 50%, replace in kind

Issued
Jun 9, 202366 Cumberland St

Revision to pa 201712085880 & 202203220559 (recommencement permit to 201712085880)

Complete
Oct 26, 20222751 Clay St

Madatory soft stoy retrofit per sfebc ch 4d

Complete
Mar 28, 20221027 Lake St

Voluntary strengthening at ground floor.

Cancelled
Oct 1, 2021617 Castro St #0

Voluntary foundation strengthening.

Complete
Jul 9, 202160 Collins St

(n) bedroom & study @ ground floor. residiential renovation w/new interior stair, (n) interior wall framing (n) bedroom + study at ground floor.

Complete
Jul 8, 20213007 California St

Voluntary strengthening @ ground floor

Cancelled
Jun 11, 20211974 34th Av

Convert (e) garage area to new master bed, 1 bed, den, laundry closet and batrhoom.new interior stairway.reconfig interior walls.new wdws and ext sliding doors.new ext stairs and deck at 2/f, rear side.replace all (e) windows in-kind.(e) attic space to be removed and new ceiling raised to (e) roof

Complete
Apr 14, 20211170 South Van Ness Av #3

Kitchen & bathroom remodel. new interior door opening.

Issued

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Mike Abell? Request a correction.