CheckMyDesigner

Mohamed Sayed Genidy

Engineer · Gpm Engineers · Fremont

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeCivil Engineer C-61578First issued Jan 26, 2001, expires Jun 30, 2027.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the BPELSG enforcement list on Nov 5, 2026.

Worked in San Francisco?
8 permits since 2016, 8 in the last 5 years. Latest filed Oct 22, 2026.
What kind of projects?
Home remodel 5 · Seismic retrofit or foundation 2 · Addition 1
How long do their permits take?
Seismic retrofit or foundation: within 1 month. City typical for the same review: within 1 month.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Permits
11 permits that name Mohamed Sayed Genidy, newest first, including 3 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Oct 22, 20262031 09th Av

Interior remodel, 1st, 2nd fl and basement. demolish poweder room to create a mudroom, remove approx 3'0 wide kitchen wall like for like, kitchen remodel, master bath, guest bath 2nd fl. basement full remodel of powder room,remodel washer/dryer area like for like, convert existing door fromo swing

Filed
Jun 25, 20263364 B 21st St #0

3/f renovation within (e) 3-unit residential bldg. scope includes removal of (e) interior walls & associated structural modifications. installation of new structural beam(s), removal of exterior door, window, & potion of rear exterior wall, install of new approx 11'x8' nanawall folding door system,

Filed
Jun 20, 2025281 Chenery St

Seismic upgrade for backyard structure. the criple walls studs ate to tall(78")as max to apply standard s1&s2 residential plan requires a max height of 72". as such, i hired a professional engineer (pe) to draw up recommeded plan of action for contractor to apply & that with the

Issued
Sep 21, 2023351 Winfield St

46sqft addition to square off back notch of house and extend/ remodel bathroom.

Issued
Nov 14, 2022316 A Vicksburg St

Rev to pa# 2021-0914-8409: alteration of roof framing and roof support

Issued
May 26, 2022471 Los Palmos Dr

Revision to 202110069897: install new i-joinst per plan from engineer.

Expired
Oct 6, 2021471 Los Palmos Dr

Remodel kitchen ,remove load bearing wall and relocate window per plan. master bathroom remodel, relocate bathroom window per plan, relocate subpanel.

Expired
Sep 14, 2021316 Vicksburg St

Interior remodel @ 2nd fl: kitchen, dinning, bathroom, living room, and office.

Issued
Jun 2, 20171511 Lyon St

Reinforcement of foundation for lower unit.

Issued
Oct 18, 2016541 19th Av

Kitchen remodel and install a new steel beam to remove a non load bearing wall.

Complete
May 5, 2016457 Diamond St

Rev. to pa#201604154892 kitchen remodel, additional work to this job is relocate kitchen, construct new deck and remove non bearing walls.

Complete

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Mohamed Sayed Genidy? Request a correction.