Neil John Ginty
Architect · Dwelling Lab · Walnut Creek
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-37904First issued Jun 3, 2019, expires May 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 27 permits since 2021, 27 in the last 5 years. Latest filed Sep 22, 2026.
- What kind of projects?
- Home remodel 16 · Addition 3 · Commercial or tenant improvement 3
- How long do their permits take?
- Home remodel: 2 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 16 permits in San Francisco
Time to get a permit
Median from filing to permit, from 13 issued permits filed since 1966; 2 still in review. City is the San Francisco median for the same kind of review, from 18,265 permits.
Where
- West of Twin Peaks3
- Bernal Heights2
- Inner Richmond2
- Twin Peaks1
Most recent
- 1581 Treat AvInterior remodel of bathroom and adding a bathroom on second floor.Sep 9, 2026Filed
- 255 Dellbrook AvInterior remodel of ktichen and converting storage garage area to bedroom and laundry closet.Jul 30, 2026Issued
- 1658 Chestnut StInterior remodel of the ground floor basement into bedroom with 2 bathrooms. addition of internal staircase. remodel kitchen and dining area located on 1st floor.May 20, 2026Issued
- 470 Athens StInterior remodel of two bedrooms, family froom w/ wetbar and storageApr 29, 2026Filed
- 1330 Alabama St1st/f rear unit: remodel of bathroom fan and kitchen and non structrual partitions to be removed. sink location for kitchen to be relocated. additional outlets and light fixtures.Dec 11, 2025Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 22, 2026 | 344 Liberty St Addition to (e) unit to include a master bedroom & hime office. with associated architectural, structural & electrical works. Triage | AdditionType unconfirmed | Triage | — | |
| Sep 18, 2026 | 170 26th Av Addition of a bedroom and interior remodel of a bathroom on the 3rd level of sfd. Filed | AdditionType unconfirmed | Filed | — | |
| Sep 9, 2026 | 1581 Treat Av Interior remodel of bathroom and adding a bathroom on second floor. Filed | Home remodel | Filed | — | |
| Aug 21, 2026 | 1808 Newhall St Revision to pa# 202409110548: omit air filtration sytems in main unit and adu. leave door from adu to main stairway. new window at bathroom Complete | Revision or supplement | Complete | Within 1 month | |
| Aug 10, 2026 | 271 Clara St Legalize non-structural partition for a new bedroom and legalize half bathroom. Issued | Legalize or fix a violation | Issued | 1 month | |
| Jul 30, 2026 | 255 Dellbrook Av Interior remodel of ktichen and converting storage garage area to bedroom and laundry closet. Issued | Home remodel | Issued | 1 month | |
| May 20, 2026 | 1658 Chestnut St Interior remodel of the ground floor basement into bedroom with 2 bathrooms. addition of internal staircase. remodel kitchen and dining area located on 1st floor. Issued | Home remodel | Issued | 3 months | |
| May 15, 2026 | 2929 Pine St Non structural -interior remodel to create an accessory dwelling unit converted from existing single family dwelling and associate plumbing and electrical works in a space were an unauthorized dwelling unit was found to be have previously existed. Approved | ADU | Approved | — | |
| Apr 29, 2026 | 470 Athens St Interior remodel of two bedrooms, family froom w/ wetbar and storage Filed | Home remodel | Filed | — | |
| Dec 11, 2025 | 1330 Alabama St 1st/f rear unit: remodel of bathroom fan and kitchen and non structrual partitions to be removed. sink location for kitchen to be relocated. additional outlets and light fixtures. Complete | Home remodel | Complete | 3 months | |
| Jun 20, 2025 | 978 Teresita Bl Remodel (e) kitchen and bathroom on 2/f. relocate (e) half bath to full bath on 1/f. 3 windows replacement; remove (e) fireplace; relocate door in bedrooms and modify closet doors; voluntary add plywood sheathing to north ane east exterior wall from inside Complete | Home remodel | Complete | 3 months | |
| Jun 5, 2025 | 1560 Mckinnon Av 1st fl interior bath remodel Complete | Home remodel | Complete | 2 months | |
| Apr 11, 2025 | 411 Clipper St Interior remodel & horizontal addition: addition of a basement & a story. horizontal addition to front & rear side of project. addition of a 2nd unit. (n) basement including a 2-car garage, bike storage, mechnical space & habitable space for unit 1. Triage | Addition | Triage | — | |
| Mar 28, 2025 | 33 Marne Av Install structural for ceiling mounted hoist at upper level Issued | Home remodel | Issued | 4 months | |
| Mar 27, 2025 | 1634 Hayes St Non structural interior remodel of kitchen, bathroom, laundry room. new exterior windows not street visible Complete | Home remodel | Complete | Within 1 month | |
| Dec 11, 2024 | 4348 17th St Remodel of (e) home includes adding (n) 2 bathrooms located on 2nd floor. to include upgrades for electrical and plumbing. Complete | Home remodel | Complete | 1 month | |
| Nov 7, 2024 | 249 Nevada St Conversion of (e) storage space in attached garage to (n) bedroom, bathroom, & laundry. Complete | Home remodel | Complete | 3 months | |
| Oct 25, 2024 | 1808 Newhall St 1/f: adding kitchen and closing the unit or adding a door to the main stair of the house main entrance to this unit would be from the east. conversion to an accessory dwelling unit. 2/f: in the back of the house adding two rooms on the front adds a room. Complete | ADUType unconfirmed | Complete | 12 months | |
| Apr 18, 2024 | 526 Lake St Remodel of e) unit 526 for 1.5 bathroom & associated plumbing & electric at 1st fl Complete | Home remodel | Complete | 2 months | |
| Jan 18, 2024 | 241 04th Av Remodel of two apartments in an existing 2-family dwelling and conversion of (e) storage space to habitable space including remodel of 2 kitchens, 2 bathrooms and interior addition of 2 bathrooms and associated plumbing & full electrical upgrade. Complete | Home remodel | Complete | 2 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Neil John Ginty? Request a correction.