Rebecca Ivans Amato
Architect · Amato Architecture · Oakland
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-25700First issued May 8, 1995, expires Aug 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 47 permits since 2004, 47 in the last 5 years. Latest filed Dec 5, 2025.
- What kind of projects?
- Commercial or tenant improvement 26 · Addition 6 · Home remodel 5
- How long do their permits take?
- Commercial or tenant improvement: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 26 permits in San Francisco
Time to get a permit
Median from filing to permit, from 25 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 9,879 permits.
Where
- Financial District/South Beach7
- Potrero Hill6
- South of Market5
- Marina2
Most recent
- 680 Mission StSuite 101: commercial - remove existing countertop shelves storage alcove and 3 compartment sink in existing retail space to build out new bakery space. new plumbing, electrical, and finished as required planset. no structural work or hvac work required.Dec 5, 2025Complete
- 1843 Union StModify storefront & relocate front entry door from west wall to south wall to create accessible entrance to comply with the accessible business entrance program(abe201812213367). create interior ramp at front entrance from sidewalk level to interior floor level for accessiblity. provide auto doorFeb 9, 2024Issued
- 100 Vallejo StReconfigure basement office layout, new conferance room, modify kitchen areas, storage, and add lactation room. reconfigure 1st floor office layout. provide new accessible stair. provide new accessible entry door on vallejo street. mep deferredDec 7, 2021Issued
- 1355 Market StBuild out 6,269 sf. food court style market space, base infrastructure & public space. individual tenant spaces shall submit separate pemits for tenant space interior build outs. mechanical, ele, plumbing and fire sprinkler modifications under sep permitsSep 16, 2019Issued
- 1010 16th StBuilt out new 823 sf commercial kitchen "whole cakes bakery" in existing retail space with (n) 126 sf mezzanine. add a type 2 hood, new plumbing, electrical and finishes as requiredApr 26, 2019Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Dec 5, 2025 | 680 Mission St Suite 101: commercial - remove existing countertop shelves storage alcove and 3 compartment sink in existing retail space to build out new bakery space. new plumbing, electrical, and finished as required planset. no structural work or hvac work required. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Aug 28, 2025 | 3900 Kirkham St Install exterior pre-manufactured metal spiral staircase for access between yard, 2nd floor, and roof deck.deferred submittal for permit application #202502200678. Complete | Deck, stairs or patio cover | Complete | 3 months | |
| Mar 7, 2025 | 3900 Kirkham St Interior remodel and 2 story addition at the rear of an (e) 2 story 1305 sq ft sfr with a proposed total increase of 690 sq ft. the project includes a 142 sq ft roof deck above the addition with an exterior spiral staircase for access. Complete | Addition | Complete | 4 months | |
| Feb 9, 2024 | 1843 Union St Modify storefront & relocate front entry door from west wall to south wall to create accessible entrance to comply with the accessible business entrance program(abe201812213367). create interior ramp at front entrance from sidewalk level to interior floor level for accessiblity. provide auto door Issued | Commercial or tenant improvement | Issued | 6 months | |
| Aug 30, 2023 | 601 19th St Add 2'h fence extension on top of existing 8'h fence to creat 10'h fence @ south and partial west sides of existing roof deck. Issued | Deck, stairs or patio cover | Issued | Within 1 month | |
| Dec 7, 2021 | 100 Vallejo St Reconfigure basement office layout, new conferance room, modify kitchen areas, storage, and add lactation room. reconfigure 1st floor office layout. provide new accessible stair. provide new accessible entry door on vallejo street. mep deferred Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Dec 2, 2020 | 1625 North Point St Open up interior walls; update kitchen at rear of ground fl unit; update ground fl bathroom; update materials at shared ground fl spaces. no change to upper unit or exterior. Complete | Home remodel | Complete | 2 months | |
| Sep 26, 2020 | 1625 North Point St Remove non-compliant deck & stairs at rear and replace with complaint deck in same location but reduced to be outside the required rear yard. Complete | Deck, stairs or patio cover | Complete | 1 month | |
| Sep 16, 2019 | 1355 Market St Build out 6,269 sf. food court style market space, base infrastructure & public space. individual tenant spaces shall submit separate pemits for tenant space interior build outs. mechanical, ele, plumbing and fire sprinkler modifications under sep permits Issued | Commercial or tenant improvement | Issued | 2 months | |
| Apr 26, 2019 | 1010 16th St Built out new 823 sf commercial kitchen "whole cakes bakery" in existing retail space with (n) 126 sf mezzanine. add a type 2 hood, new plumbing, electrical and finishes as required Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Mar 27, 2019 | 35 Kearny St #0 1st flr, build out kitchen and dining area, build out basement prep kitchen, dishwasher, storage and restroom Complete | Commercial or tenant improvement | Complete | 1 month | |
| May 18, 2018 | 2198 Market St Interior build out of restaurant Complete | Commercial or tenant improvementType unconfirmed | Complete | 2 months | |
| May 9, 2018 | 22 Day St #0 Expand grnd flr garages, close front 2 lightwells, build new walls to divide storage space into different storage rms. add communal lounge at 1st story. remodel 2nd/3rd/4th flr units adding 1/2 bath per unit. add 4 skylights to 4th flr. replace all windows to alum clad. replace garage door in kind Complete | Home remodelType unconfirmed | Complete | Within 1 month | |
| Apr 26, 2018 | 109 Cornwall St Interior stair from ground fl to 2nd f, create office/entry closet/laundry area at previous rec room Complete | Home remodel | Complete | 2 months | |
| Jan 31, 2017 | 554 Commercial St Build out new service/sales counters and new dining area with bench and tables. new finishes and equipment at 1st fl. replace plumbing fixtures at basement and finishes. new wall at basement for trash/utility area. open closed up stairwell. e hood to remain. life safety deferred if required. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Apr 26, 2016 | 329 Kearny St Added lighting/title 24 work to previous permit #201601257897 Issued | Revision or supplement | Issued | Within 1 month | |
| Mar 8, 2016 | 601 19th St Fire dept approval for assembly only - no construction: ref: pa #201407171496. Issued | Commercial or tenant improvementType unconfirmed | Issued | Within 1 month | |
| Oct 29, 2015 | 272 Sutter St Administrative health permit only. other work done under separate permit. new tenant, no work Cancelled | Other | Cancelled | — | |
| Oct 29, 2015 | 1837 Union St Administrative health permit only. no new workk ref 201502128259 Cancelled | OtherType unconfirmed | Cancelled | — | |
| Aug 13, 2015 | 268 17th Av Demolish and reconfigure kitchen and laundry. add one new bathroom. remodel extg bath. add one sink. Complete | Home remodel | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Rebecca Ivans Amato? Request a correction.