Robert Peter Budetti
Architect · Architects Orange · Orange
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-23757First issued Nov 5, 1992, expires Aug 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 18 permits since 2005, 18 in the last 5 years. Latest filed Jul 7, 2026.
- What kind of projects?
- Commercial or tenant improvement 17 · Retaining wall or site work 1
- How long do their permits take?
- Commercial or tenant improvement: 2 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 17 permits in San Francisco
Time to get a permit
Median from filing to permit, from 15 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 18,265 permits.
Where
- Financial District/South Beach8
- South of Market5
- Nob Hill2
- Potrero Hill1
Most recent
- 164 Geary StConstruction of a new demising wall to divide the (e) space into 3 separate vanilla shell tenant spaces. work includes interior finishes, furnishings, and limited mechanical and electrical modifications. no change in use, area or building footprint. no exterior work proposed.Jul 7, 2026Issued
- 170 Geary StConstruction of a new demising wall to divide the (e) space into 2 separate vanilla shell tenant spaces. work includes interior finishes, furnishings, and limited mechanical and electrical modifications. no change in use, area or building footprint. no exterior work proposed.Jul 7, 2026Filed
- 166 Geary StNon-structural demo of interior compoments.interior demo limited to remomoval of existing ceilings,light fixtures,interior partitions,furred walls,built in millwork and fixtures,plumbing fixtures, wall finished and floor finishes. future ti under separate permit.demo work to be completed in 2 phasesJun 8, 2026Issued
- 170 Geary StNon-structural demo of interior compoments.interior demo limited to remomoval of existing ceilings,light fixtures,interior partitions,furred walls,built in millwork and fixtures,plumbing fixtures, wall finished and floor finishes. future ti under separate permit.demo work to be completed in 2 phasesJun 4, 2026Issued
- 170 Geary StNon-structural demolition of interior components, interior demolition limited to removal of existing ceilings, light fixtures, interior partitions, furred walls, built-in millwork and fixtures, plumbing fixtures, wall finishes and floor finishes. future tenant improvements under separate permit.Apr 15, 2026Withdrawn
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Jul 7, 2026 | 164 Geary St Construction of a new demising wall to divide the (e) space into 3 separate vanilla shell tenant spaces. work includes interior finishes, furnishings, and limited mechanical and electrical modifications. no change in use, area or building footprint. no exterior work proposed. Issued | Commercial or tenant improvement | Issued | 3 months | |
| Jul 7, 2026 | 170 Geary St Construction of a new demising wall to divide the (e) space into 2 separate vanilla shell tenant spaces. work includes interior finishes, furnishings, and limited mechanical and electrical modifications. no change in use, area or building footprint. no exterior work proposed. Filed | Commercial or tenant improvement | Filed | — | |
| Jun 8, 2026 | 166 Geary St Non-structural demo of interior compoments.interior demo limited to remomoval of existing ceilings,light fixtures,interior partitions,furred walls,built in millwork and fixtures,plumbing fixtures, wall finished and floor finishes. future ti under separate permit.demo work to be completed in 2 phases Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Jun 4, 2026 | 170 Geary St Non-structural demo of interior compoments.interior demo limited to remomoval of existing ceilings,light fixtures,interior partitions,furred walls,built in millwork and fixtures,plumbing fixtures, wall finished and floor finishes. future ti under separate permit.demo work to be completed in 2 phases Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Apr 15, 2026 | 170 Geary St Non-structural demolition of interior components, interior demolition limited to removal of existing ceilings, light fixtures, interior partitions, furred walls, built-in millwork and fixtures, plumbing fixtures, wall finishes and floor finishes. future tenant improvements under separate permit. Withdrawn | Commercial or tenant improvement | Withdrawn | — | |
| Dec 1, 2025 | 555 09th St Level 1 ti for build out of fitness facility Issued | Commercial or tenant improvementType unconfirmed | Issued | 4 months | |
| Nov 6, 2025 | 555 09th St Level 2 build out of fitness facility Issued | Commercial or tenant improvement | Issued | 5 months | |
| Jul 19, 2024 | 1270 Bush St 1st & 2nd fl: installation of new interior transformer vault room to support the proposed current automobile use. work shall include new partitions enclosing the transformer vault, relocation of (e) stairwell on larking st to accomodate the proposed transformer vault. Complete | Commercial or tenant improvement | Complete | 8 months | |
| Apr 7, 2023 | 1270 Bush St 1st & 2nd fl demo only. non structural interior demo all plumbing, mech/fixtures, all lighting and unnecessary electrical circuits, below slab storage tanks, establishing a vanilla/ whitesheld Complete | Commercial or tenant improvement | Complete | 2 months | |
| Sep 14, 2020 | 435 23rd St Tenant improvement of shell warehouse building: new office & support core, new mechanical equipment, high speed overhead doors, additional site signage, high volume fans & associated electrical work. mhe system shown for reference only and no high-pile storage is proposed in this scope of work. Complete | Commercial or tenant improvement | Complete | 9 months | |
| Jun 4, 2020 | 435 23rd St Demo for new office 2010 sf and support core per ab-017 and site erosion control. Complete | Retaining wall or site workType unconfirmed | Complete | 11 months | |
| Jun 17, 2019 | 865 Market St Installation of a temporary stand alone exhibit including vr experience stage and supporting spaces within the enclosure Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Mar 14, 2017 | 865 Market St Box a - various fl: install infrastructure to accommodate the structural support, power & data for floor mounted digital advertising screens at locations in the common area of the mall n/a maher Complete | Commercial or tenant improvementType unconfirmed | Complete | Within 1 month | |
| Jan 23, 2017 | 18 Yerba Buena Ln 1/f- revision to 2016-0624-0838 changes include new finishes update dimensions, arch details and signage. minor changes to mep Issued | Revision or supplement | Issued | 2 months | |
| Jun 24, 2016 | 18 Yerba Buena Ln Ti to add rstrooms, kitchen & kitchen appliances. appliances include stoves, frigerator, sinks & hoods. life safety & kitchen hood suppression system under separate permit. ** maher: n/a ** Complete | Commercial or tenant improvement | Complete | 6 months | |
| Apr 27, 2016 | 845 Market St Build new offices and upgrade restroom. ti space change of use from retail to office. 4th fl Issued | Commercial or tenant improvement | Issued | 2 months | |
| May 21, 2013 | 3251 20th Av #0 Revise 2012-05-16-0614 exit door location, elevator loc, kids klub toilets. add exist steel column-d/3.5, remove steel beam gl5/a, added footing detail due to (e) conditions at gridline 6.1, elimiate deck & beam near elevator, reframe. ew:20130226541, p:20130226926. terminate dryer vent at south wal Complete | Revision or supplement | Complete | Within 1 month | |
| Apr 19, 2013 | 3251 20th Av #0 For sf health dept pool review only. no change from drawings (duplicate) appl #2012.05.16.0614. Complete | Revision or supplement | Complete | 2 months | |
| May 16, 2012 | 3251 20th Av Proposed 3 level fitness ctr occupying an (e) 54,000 sf (3) level bldg. fitness ctr will consist of arears for weight training cardio & circuit trainging, basketball, racquetball, lap pool & spa. area for new membership sales & child care also provided. fire sprklr, alarm & signage under sep permit Complete | Commercial or tenant improvement | Complete | 4 months | |
| May 12, 2006 | 425 Market St Alter t-1 appl#200603146645 build wall & change elect. Issued | Commercial or tenant improvementType unconfirmed | Issued | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Robert Peter Budetti? Request a correction.