Ryan Francis Knock
Architect · Knock Arch & Design · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-31156First issued May 25, 2007, expires Dec 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 235 permits since 2007, 235 in the last 5 years. Latest filed Oct 29, 2026.
- What kind of projects?
- Home remodel 78 · Addition 59 · Deck, stairs or patio cover 27
- How long do their permits take?
- Home remodel: 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 78 permits in San Francisco
Time to get a permit
Median from filing to permit, from 68 issued permits filed since 1966; 6 still in review. City is the San Francisco median for the same kind of review, from 20,342 permits.
Where
- Castro/Upper Market10
- Bernal Heights9
- Presidio Heights6
- Inner Richmond6
Most recent
- 142 Arguello BlRemodel: reconfigure kitchen, baths, living and dining areas. remove interior access stair between levels 1 and 2.Oct 29, 2026Filed
- 655 Noe StRear building: full remodel - new siding, windows, doors, roofing, skylight. remodel and reconfigure interior including kitchen, bathroom, living space, bedroom. lower floor for increased ceiling height.Sep 25, 2026Filed
- 142 Arguello BlInterior work only: basement: new mudroom & stair connection to 1/f. 1/f: open kitchen,dining, living room, relocate bath & laundry to 2/f. 2/f: relocate bathroom, reconfigure bedrooms, remove interior access stair. exterior work under sep permit project is subject to ab112 all-electric ordinance.Aug 25, 2026Triage
- 363 Texas StNew interior rmeodel to both units. full remodel, relocated kitchens, bathrooms, unit entries and access. adu and ext'r work under sep permit.Jun 30, 2026Filed
- 360 Day StInterior remodel: reconfigure all spaces including kitchen, bathroom, new connecting stairs to levels above and below. adu & exterior work under separate permits.Jun 30, 2026Triage
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 29, 2026 | 142 Arguello Bl Remodel: reconfigure kitchen, baths, living and dining areas. remove interior access stair between levels 1 and 2. Filed | Home remodel | Filed | — | |
| Oct 29, 2026 | 142 Arguello Bl Replacement of (16) windows. replace rear yard facing shake siding with stucco siding, create new sliding doors on gf. remove portion of non- compliant rear portion of building and replace with deck less than 30" above grade. new mech equipment on roof and new access to equipment. Filed | Other | Filed | — | |
| Oct 8, 2026 | 224 29th St Excavate west side of property breezeway and access to rear yard and ground floor spaces. revision to 202503071835. Filed | Revision or supplementType unconfirmed | Filed | — | |
| Oct 7, 2026 | 1057 Pacific Av Revision to pa #202504114202. change all approved w60 lot line glazed wall assemblies to 45 min. fire rated wall assemblies in accordance with ab-009 Filed | Revision or supplement | Filed | — | |
| Sep 25, 2026 | 655 Noe St Front building:horizontal and vertical expansion and local adu studio. new windows, doors, siding, decks at front and rear of bldg. expand garage and building below grade, new garage door and gate. interior full remodel and reconfiguration, main residence to be 4 bed, 5 baths. Filed | ADU | Filed | — | |
| Sep 25, 2026 | 655 Noe St Rear building: full remodel - new siding, windows, doors, roofing, skylight. remodel and reconfigure interior including kitchen, bathroom, living space, bedroom. lower floor for increased ceiling height. Filed | Home remodel | Filed | — | |
| Sep 24, 2026 | 845 Vermont St #1 Revision to pa# 2022-0308-9445: work at facade only. infill below over hang at facade, create new sliding glass door, and french balcony. change siding and windows at facade (not in kind). Filed | Revision or supplement | Filed | — | |
| Sep 11, 2026 | 880 Innes Av Comply with complaint and nov #202048705 to restore warehouse to previous conditions. work includes: 1) replace roof framing, skylights and roof membrane. 2) replace rear wall at mezzanine level. Issued | Legalize or fix a violation | Issued | 1 month | |
| Sep 10, 2026 | 360 Day St Exterior renovations: new skylights, windows, siding, not in-kind or (e) opening. new vertical and horizontal addition of 1785sf. new adu and interior rmeodel under seperate permit. Filed | Addition | Filed | — | |
| Sep 8, 2026 | 1066 Filbert St Revision to pa 202511149623 propose 7'6 height of mech room and hallway stepped down to 8'-8" living space. reconfigure front matslab. update/extend capped uphill west retaining wall. replace downhill east foundation due to brick Issued | Revision or supplement | Issued | Within 1 month | |
| Aug 28, 2026 | 1066 Filbert St Revision to pa 202511149623 revise roof deck extend deck to west and next to adjacent lightwell Issued | Revision or supplement | Issued | Within 1 month | |
| Aug 25, 2026 | 142 Arguello Bl Exterior work only: remove previous extensions into rear yard. create new rear yard facing sliders on 1/f. infill portions of side facing lightwells on 1/f & basement, each no more than 1 story above grade. new accessory entrance. new hatch to unoccupied roof/condensers. no work visible from public. Filed | AdditionType unconfirmed | Filed | — | |
| Aug 25, 2026 | 845 Vermont St #1 Revision to pa# 202203089445. remove fire escape both units. comply w/ (e) access requirment found in eg-03. infill below overhang @ facade. create (n) sliding glass door & french balcony. layout change to primary closet/bath kids bedroom & bath, & (n) built-ins @ entry. Withdrawn | Revision or supplement | Withdrawn | — | |
| Aug 25, 2026 | 142 Arguello Bl Interior work only: basement: new mudroom & stair connection to 1/f. 1/f: open kitchen,dining, living room, relocate bath & laundry to 2/f. 2/f: relocate bathroom, reconfigure bedrooms, remove interior access stair. exterior work under sep permit project is subject to ab112 all-electric ordinance. Triage | Home remodel | Triage | — | |
| Aug 6, 2026 | 4068 Cesar Chavez St #0 Revision to pa # 202602115761 - expand rear facing decks on second and third floors. construct 140sf horizontal addition at rear of the third floor. expand existing fire protection system under separate permit. remove roof deck on top of 3rd floor roof. Issued | Revision or supplement | Issued | 1 month | |
| Jul 6, 2026 | 474 Valley St Revision to bpa: 202411215504 - remove the package door on the 1st floor, reconfigure the kitchen layout on the 3rd floor. add electric fireplace and steam shower room at 3rd floor. reduce size on 2 skylights on the 3rd floor. ref bpa: 202001313281 Issued | Revision or supplement | Issued | Within 1 month | |
| Jun 30, 2026 | 363 Texas St New verticle and horizontal expansion. new siding & windows. new roof deck. adu and interior work to (e) units under sepaate permit. Filed | Addition | Filed | — | |
| Jun 30, 2026 | 363 Texas St New state adu: provide new studio adu with one bathroom, ktichen, living area on (e) 2/f. ext'r work / expansion and interior work to (e) units under sep permit. Filed | ADU | Filed | — | |
| Jun 30, 2026 | 363 Texas St New interior rmeodel to both units. full remodel, relocated kitchens, bathrooms, unit entries and access. adu and ext'r work under sep permit. Filed | Home remodelType unconfirmed | Filed | — | |
| Jun 30, 2026 | 360 Day St Interior remodel: reconfigure all spaces including kitchen, bathroom, new connecting stairs to levels above and below. adu & exterior work under separate permits. Triage | Home remodel | Triage | — |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Ryan Francis Knock? Request a correction.