Salvatore Paul Italiano
Engineer · Spi Consulting Engineers · Lafayette
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeCivil Engineer C-34845First issued Aug 18, 1982, expires Sep 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 73 permits since 2003, 73 in the last 5 years. Latest filed Apr 26, 2023.
- What kind of projects?
- Retaining wall or site work 59 · Seismic retrofit or foundation 12 · New building 1
- How long do their permits take?
- Seismic retrofit or foundation: 2 months. City typical for the same review: 9 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Retaining wall or site work: 59 permits in San Francisco
Time to get a permit
Median from filing to permit, from 56 issued permits filed since 1966; 1 still in review.
Where
- Bayview Hunters Point11
- Mission8
- Haight Ashbury7
- Pacific Heights6
Most recent
- 1800 Bryant StRevise to 2019 0603 2347. construct soldier piles w/ tiebacks and wood logging to temporarily retain excavations up to 33.5 ft in depth. note the revised plans actually show a shoring system that consists of a tied-back, steel soldier pile encased in concrete w/ soil-mix lagging, dmj 09/07/2022;Aug 15, 2022Filed
- 966 Oakdale AvBuilding n1: the work on these drawings involves construction of temporary cantilevered beams & tiedback soldier beams with wood lagging @ buildg p. shoring work for future construction under bpa#2014-1216-3796-sJul 15, 2021Issued
- 968 Oakdale AvBuilding l: the work shown on these drawings involves the construction of permanent cantilevered beams & tieback soldier beams with shotcrete lagging will be constructed at building l. shoring work for future construction uncer bpa #2016-0229-0747-sJul 15, 2021Issued
- 978 Oakdale AvBuilding i: the work on these drawings involves the construction of permanent cantilevered beams & tieback soldier beams with shotcrete lagging will be constructed @ building i. shoring work for future construction under bpa #2016-02229-0745-sJul 15, 2021Issued
- 988 Oakdale AvBuilding e: the work on these drawings involves the construction of temoraray cantilevered beams & tiedback soldier beams with wood lagging. shoring work for future construction under bpa#2016-0229-0780-sJul 15, 2021Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Apr 26, 2023 | 444 Presidio Av Underpinning of existing structure in connection with work on the adjacent property at 3150 california street pa# 202205265118. Complete | Seismic retrofit or foundation | Complete | 3 months | |
| Nov 17, 2022 | 1800 Bryant St Commencement of work not started under previously approved bpa#201906032347 (underpinning - tiebacks) Cancelled | Revision or supplement | Cancelled | — | |
| Aug 15, 2022 | 1800 Bryant St Revise to 2019 0603 2347. construct soldier piles w/ tiebacks and wood logging to temporarily retain excavations up to 33.5 ft in depth. note the revised plans actually show a shoring system that consists of a tied-back, steel soldier pile encased in concrete w/ soil-mix lagging, dmj 09/07/2022; Filed | Retaining wall or site workType unconfirmed | Filed | — | |
| Aug 15, 2022 | 1850 Bryant St Revise to 2019 0603 2349. construct soldier piles w/ tiebacks and soil-mixed lagging to temporarily retain excavations up to 33.5ft in depth, which is 6ft deeper than original plan and includes an allowance for underpinning. Filed | Revision or supplementType unconfirmed | Filed | — | |
| Jul 15, 2021 | 966 Oakdale Av Building n1: the work on these drawings involves construction of temporary cantilevered beams & tiedback soldier beams with wood lagging @ buildg p. shoring work for future construction under bpa#2014-1216-3796-s Issued | Retaining wall or site work | Issued | 6 months | |
| Jul 15, 2021 | 968 Oakdale Av Building l: the work shown on these drawings involves the construction of permanent cantilevered beams & tieback soldier beams with shotcrete lagging will be constructed at building l. shoring work for future construction uncer bpa #2016-0229-0747-s Issued | Retaining wall or site work | Issued | 6 months | |
| Jul 15, 2021 | 978 Oakdale Av Building i: the work on these drawings involves the construction of permanent cantilevered beams & tieback soldier beams with shotcrete lagging will be constructed @ building i. shoring work for future construction under bpa #2016-02229-0745-s Issued | Retaining wall or site work | Issued | 6 months | |
| Jul 15, 2021 | 988 Oakdale Av Building e: the work on these drawings involves the construction of temoraray cantilevered beams & tiedback soldier beams with wood lagging. shoring work for future construction under bpa#2016-0229-0780-s Issued | Retaining wall or site work | Issued | 6 months | |
| Jul 15, 2021 | 878 La Salle Av Building n1: the work on thee drawings involves temporary soil nailing will be constructed at building n1. shoring work for future construction bpa #2014-1216-3800-s Issued | Retaining wall or site work | Issued | 6 months | |
| Jul 15, 2021 | 762 La Salle Av Building o: the work on thee drawings involves temporary soil nailing will be constructed at building o. shoring work for future construction bpa #2014-1216-3806-s Issued | Retaining wall or site work | Issued | 6 months | |
| Sep 12, 2020 | 869 La Salle Av Bldg m-temporary shoring - the work shown on these drawings involves the construction of temporary cantilevered beams, and tiebacks soldier beams with wood lagging at building m.shoring work for future construction under pa# 201602179819.**comply w/ maher ord, route to dph** Issued | Retaining wall or site work | Issued | 11 months | |
| Sep 12, 2020 | 898 La Salle Av Bldg a-temporary shoring - shoring work for future construction under pa# 201603141951the work shown on these drawings involves the construction of temporary cantilevered beams with wood lagging at building a.**comply w/ maher ord, route to dph** Issued | Retaining wall or site workType unconfirmed | Issued | 12 months | |
| Sep 12, 2020 | 879 La Salle Av Bldg j-temporary shoring - the work shown on these drawings involves the construction of temporary cantilevered beams, and tiebacks soldier beams with wood lagging at building j. shoring work for future construction under pa#201602179818.**comply w/ maher ord, route to dph** Issued | Retaining wall or site workType unconfirmed | Issued | 11 months | |
| Sep 12, 2020 | 889 La Salle Av Bldg f-shoring work for future construction under pa#201602179815the work shown on these drawings involves the construction of temporary cantilevered beams, and tiebacks soldier beams with wood lagging at building f. **comply w/ maher ord, route to dph** Issued | Retaining wall or site work | Issued | 11 months | |
| Sep 8, 2020 | 888 La Salle Av Bldg g-temporary shoring - the work shown on these drawings involves the construction of temporary cantilevered beams with wood lagging at building g. shoring work for future construction under pa# 201603141960.**comply w/ maher ord, route to dph** Issued | Retaining wall or site workType unconfirmed | Issued | 12 months | |
| Jun 3, 2019 | 1850 Bryant St Shoring and excavation Issued | Retaining wall or site workType unconfirmed | Issued | 3 months | |
| Jun 3, 2019 | 1800 Bryant St Underpinning - tiebacks Issued | Seismic retrofit or foundation | Issued | 3 months | |
| Jan 28, 2019 | 400 Winston Dr Install 101 micropiles to prepare site for construction under previously listed permit. deferred submittal for 201711284984 Complete | Revision or supplement | Complete | 1 month | |
| Apr 5, 2018 | 200 Van Ness Av Excavation. temporary excavation shoring with cub up to 35' will be shored using a soil mixed cutoff walls with tiebacks along street sides of the excavation & underpinning slant piles, jet grout & tiebacks under the 150 hayes street building. ** maher: exempted - approval from dph on the plan ** Complete | Retaining wall or site work | Complete | 5 months | |
| Apr 5, 2018 | 200 Van Ness Av Temporary excavation shoring with cut up to 35' will be shored using a soil mixed cutoff walls with tiebacks along street sides of the excavation & underpinning slant piles, jet grout & tiebacks under the 150 hayes st bldg. ref pa# 201705055847-s ** maher: exempted - approval from dph on the plan ** Complete | Retaining wall or site work | Complete | 5 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.