Sashikala Murthy
Architect · Revel Architecture · Oakland
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-39484First issued Dec 8, 2021, expires May 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 159 permits since 2022, 159 in the last 5 years. Latest filed Oct 29, 2026.
- What kind of projects?
- Commercial or tenant improvement 157 · Other 2
- How long do their permits take?
- Commercial or tenant improvement: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 157 permits in San Francisco
Time to get a permit
Median from filing to permit, from 148 issued permits filed since 1966; 6 still in review. City is the San Francisco median for the same kind of review, from 24,353 permits.
Where
- Financial District/South Beach137
- Chinatown11
- Mission Bay5
- Presidio Heights1
Most recent
- 201 California St2nd fl patio constructioin of trellis system with integrated lighting and heaters. interior construction of cabinetry, sink, wall finish.Oct 29, 2026Filed
- 417 Montgomery St1/fl- interior soft demo followed by (n) interior partitions, doors, finishes, mep and (n) accessible restroom photographs provided - interior was completely remodeled c. 1990-2000, no historic features intact in subject interior areaSep 22, 2026Issued
- 680 Folsom St5th floor: shall consist of demolition of 3 non-structural interior partitions & 1 door & sidelite to combine 2 suites into 1 full floor tenant space. new construction to include floor, wall & ceiling patching required and minor electrical outlet relocation.Sep 17, 2026Filed
- 44 Montgomery St #0Ste 1500, 15th fl: minimal partition demo and associated doors/ frames/ glazing, lighting, and ceiling tile and grid. (n) open ceiling and lighting and finishes. no (n) doors, frames or millwork requires. any changes to mep, sprinklers and/or fls system will be submitted under separate permit.Aug 20, 2026Issued
- 680 Folsom St2/f: interior demolition of non-structural items, including partitions and doors. new construction to include doors, partitions, ceilings, lighting, plumbing fixtures, and finishes. mep and fire life safety to be deferred submittals.Aug 12, 2026Filed
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 29, 2026 | 201 California St 2nd fl patio constructioin of trellis system with integrated lighting and heaters. interior construction of cabinetry, sink, wall finish. Filed | Commercial or tenant improvementType unconfirmed | Filed | — | |
| Sep 22, 2026 | 417 Montgomery St 1/fl- interior soft demo followed by (n) interior partitions, doors, finishes, mep and (n) accessible restroom photographs provided - interior was completely remodeled c. 1990-2000, no historic features intact in subject interior area Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Sep 17, 2026 | 680 Folsom St 5th floor: shall consist of demolition of 3 non-structural interior partitions & 1 door & sidelite to combine 2 suites into 1 full floor tenant space. new construction to include floor, wall & ceiling patching required and minor electrical outlet relocation. Filed | Commercial or tenant improvement | Filed | — | |
| Aug 20, 2026 | 44 Montgomery St #0 Ste 1500, 15th fl: minimal partition demo and associated doors/ frames/ glazing, lighting, and ceiling tile and grid. (n) open ceiling and lighting and finishes. no (n) doors, frames or millwork requires. any changes to mep, sprinklers and/or fls system will be submitted under separate permit. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Aug 12, 2026 | 680 Folsom St 2/f: interior demolition of non-structural items, including partitions and doors. new construction to include doors, partitions, ceilings, lighting, plumbing fixtures, and finishes. mep and fire life safety to be deferred submittals. Filed | Commercial or tenant improvement | Filed | — | |
| Aug 12, 2026 | 45 Fremont St 17/f: installation of life safety and seismic requirements for (2) one-person phone booths. accessibility upgrades in the core restrooms are also included. mep and fire life safety drawings are deferred. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Aug 7, 2026 | 535 Mission St 27th floor: minor non-structural demolition of new power, life safety & seismic requirements for 4 new phone booths. Issued | Commercial or tenant improvement | Issued | 1 month | |
| Jul 21, 2026 | 600 Montgomery St Revision to 202512111506, consist of 3 new interior doors. permit also establishes the employee breakroom use in lieu of a service kitchen. Complete | Revision or supplement | Complete | Within 1 month | |
| Jul 15, 2026 | 550 California St Revision to 202603318646. removeal of 1 partition. make 1 office into a meeting room and revise lighting and power as needed. provide furring near breakroom. Filed | Revision or supplement | Filed | — | |
| Jul 15, 2026 | 44 Montgomery St 19th fl. suite 1900: suite is currently vacant in shell condition. sow consists of minimal demo of corridor, incl, entry doors to be replaced, suite build out consists of (n) offices, mtg rooms, and break area, incl, non strl partitions, ppower clg, lighting finishes and millwork. any changes to mep Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Jul 15, 2026 | 44 Montgomery St 19th fl. floor is currently vacant common area upgrades include: corridors =(n) clgs, lighting, finishes, (n) drinking fountain, restrooms=(n) finishes, fixtures, and accessories, lighting, doors, exiting and occupancy do not change. if there are any changes to mep, sprklr, and/or fls systems those Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Jul 14, 2026 | 201 California St #0 Ste 1100 11/f: includes new construction of conf rooms, huddle, phone & break area. mep will be submitted as a separate permit. scope does not alter fixture quantities, occ load, calcs or path of travel. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Jun 16, 2026 | 222 02nd St 21st fl: removal of elevator lobby doors on floor 21. replace with new doors with card reader. ada restroom upgrade. no new or change plumbing fixtures. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jun 16, 2026 | 222 02nd St 22nd fl: removal of elevator lobby doors on floor 22. replace with new doors with card reader. ada restroom upgrade. no new or change plumbing fixtures. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jun 5, 2026 | 550 California St Ste #220 (level 2) ti: demo and (n) non structural partitions, finishes, millwork, lighting, mep deferred. no structural or exterior work. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Jun 5, 2026 | 101 California St 25th floor- revision to bpa: 202602025031 - new location of demising wall. (ste 2575 $ 2550) Complete | Revision or supplement | Complete | Within 1 month | |
| May 29, 2026 | 505 Montgomery St Ste 620/6th fl: t.i. demo of non structural elements (int. partitions, doors, finishes, ceiling, lighting, mech & elec) construct of new non structural partitions, doors, finishes, lighting, millworks, mech & elec outlets, switches. full restroom accessibility upgrade Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| May 22, 2026 | 160 Spear St 17th and 18th floor. installation of 21 new phone booth (7) on 17th flr and (14) on floor 18. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| May 1, 2026 | 44 Montgomery St Ste 1305 - office ti combine occupied ste 1303 w/adjacent vacant ste 1305. demo portion of demising wall, replace 2 single entry doors w/1 double door; (n) break area casework & appliances; (n) flooring in vacant ste; (n) clg tiles & lighting, (e) improvements & finishes to otherwise remain. any Issued | Commercial or tenant improvement | Issued | 2 months | |
| Apr 30, 2026 | 550 California St 4/f suite 430: tenant improvement. demo and new non-structural partitions, millwork, finishes. no structural or exterior work. mep deferred. Issued | Commercial or tenant improvement | Issued | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Sashikala Murthy? Request a correction.