CheckMyDesigner

Savina Kyurkchieva

Architect · Citydot Studio, Llc · San Francisco

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeArchitect C-39850First issued Jun 28, 2022, expires Nov 30, 2027.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the California Architects Board enforcement list on Nov 5, 2026.

Worked in San Francisco?
7 permits since 2017, 7 in the last 5 years. Latest filed Jul 31, 2026.
What kind of projects?
Home remodel 2 · Commercial or tenant improvement 2 · Addition 1
How long do their permits take?
Home remodel: within 1 month. City typical for the same review: within 1 month.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Permits
8 permits that name Savina Kyurkchieva, newest first, including 1 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Jul 31, 20263133 Scott St

Unit 3133, level 3: replace all windows in kind. new skylights and roof framing for additional support. interior non load bearing walls. remodel existing kitchen, remove e windows, install 1 new window side north elevation. new laundry area with stacked. remodel e split bath to full.

Issued
Apr 7, 2025120 Duncan St

Level 2 (120 ducan st): relocated kitchen. reconfigure interior walls, new bathroom. replace rear yard facing window (same size), new laundry closet. level 3 (122 ducan st): new bathroom. relocate laundry closet.

Complete
Feb 4, 2025501 Crescent Av

Revision to approved pa # 2021-0317-6756 add 3 (n) bathrooms, relocate the kitchen & reconfigure interior walls. rear yard design. change window frame material from aluminum to fibrex. change wall finish stucco to hardie architectural panel. no change to the exterior envelope, total sq ft or

Issued
Dec 12, 202480 Lomita Av

Street facing facade work: remove (e) wood siding & trims. install (n) stucco finish to the facade surfaces visible from lomita ave.

Issued
Jul 8, 202480 Lomita Av

New horizontal addition of 251 sf w/new family rm, powder rm, new elevator. reconfigure e) stairway at entry lvl hall. e) kitchen remodel & expansion. replace e) select windows in kind. interior walls reconfigure. new skylight, new rear deck. extend e) gas service to exterior bbq & fire pit.

Issued
Jun 5, 2023156 12th Av

To comply wihh nov# 202306387 dbi internal audit. legalize current roof parapet. project is 42" roof perimeter solid wall.

Complete
Feb 9, 202199 Bosworth St

Add unit per density. bring ceiling height (level 1) and 2 stairways to compliance. remodel kitchen (level 1) and all bathrooms. reconfigure interior walls. roof deck (level 3). replace all windows, add new windows, and a skylight. add 3 new dormers. remove existing chimney. mep and structural work

Complete
May 30, 20171550 Bryant St

Demo of non structural partitions. new non structural partitions. demo of demising wall between suite 555 & 545, create 3 conference rooms, carpet removal, new carpet & installation. mep/fire/life safety, under sep permit maher na

Complete

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Savina Kyurkchieva? Request a correction.