CheckMyDesigner

Seung Kun Oh

Engineer · J5 Infrasture Partners · Parkland

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeCivil Engineer C-84365First issued May 28, 2015, expires Sep 30, 2027.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the BPELSG enforcement list on Nov 5, 2026.

Worked in San Francisco?
26 permits since 2021, 26 in the last 5 years. Latest filed Sep 26, 2022.
What kind of projects?
Other 26

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Other: 26 permits in San Francisco

From 2021 to 2022, latest filed Sep 26, 2022.

Time to get a permit

Theirs
5 months

Median from filing to permit, from 25 issued permits filed since 1966; 1 still in review.

Where

  • Financial District/South Beach5
  • Tenderloin3
  • South of Market3
  • Nob Hill2
Permits
26 permits that name Seung Kun Oh, newest first. Select a permit to see the full record.
FiledProjectOpen
Sep 26, 20221408 California St

Att modification of unmanned telecom facility consisting of remove/replace 9 antennas, remove 6 rrus, installl 3 new rrus, 3 new diplexers, relocate 1 radome with new sleeper platform. new rf safety sign barricades, stripping on roof. remove/replace 20 acid lead batteries within e cabinets.

Complete
Aug 30, 202222 Battery St

Att modification of unmanned telecom facility. remove/replace 6 antennas, new rf safety signs,secure barricades w/locked gates & striping at rooftop.new 6648 baseband unit in e rack.

Complete
Aug 16, 20222501 03rd St

Att modifcation of unmanned telecom facility, remove (9)panel antennas, (6)new, remove (3)rrus, install (3)6 awg power trunk cables. new rf safety signs, barricade/striping rooftop, install (1)new rectifier in e dc power plant, (1)new 6648 baseband unit in existing purcell cabinet

Complete
Jul 28, 2022400 Post St #0

Att modification of unmanned telecome facility consisting of 3 panel antennas, new rf safety signs, barriers, triping roof. remove 20 batteries install new within existing,new batteries new vertiv battery rack.install new flx21 purcell cabinet w bbu,6 new rectifiers within exostog dcpp cabinet

Complete
May 16, 20222550 Sloat Bl

At&t modification of an (e) telecom facility consisting remove and replace (6) antennas within (e) radomes, remove (6) rru's add install (3) new rru's; install new rp safety ing & stripping on rooftop, install (1) new rectifier in (e) dcpp cabinet

Complete
Apr 26, 2022225 30th St

Att cell site mod: r/r 9 panel antennas.remove 6 rru's and replace with 3 new rrus. install 3 new diplexers near antennas sector.r/r 20 batteirs.install new rf safety signs and striping at rooftop.

Complete
Apr 26, 2022270 Mcallister St

Cell site mod: r/r 2 antennas from sector c.install 1 (n) antennae at sector a/b.remove 2 (e) low loss conbiners, 1 (e) duw from rack.install 1-6648 bbu,3 rectifiers, 8 batteries.replace a/c panel with new 200ac breaker.install rf saftey.

Complete
Apr 4, 2022802 Bryant St

At&t: modification to an (e) unmanned wireless telecom facility consisting of: remove & replace 6 antennas. install 3 (n) pipe to pupe mount extension. remove & replace 20 (n) batteries. install 1 (n) rectifier 1 6648 baseband unit. install (n) rf safety signs, barricades + stripping.

Complete
Mar 25, 2022244 Jackson St

At&t: remove and replace 6 antennas, and 3 rrus. remove all unused coax lines. install 1 retifier, 1 dc12 rm withing (e) cabinet and equipment rack. install 4 new batteries.

Complete
Mar 24, 2022353 Sacramento St

Cell site mod: r/r 6 panel antennas,install 1 new rectifier w/in (e) dc power plant.install (1) 6648 baseband within (e) fif rack.

Issued
Mar 24, 20222300 Chestnut St

At&t: remove and replace 9 antennas. remove 12 rrus and replace with 6 rrus. remove and replace 4 frp radomes at sector a and c. remove and replace 2 cabinets. install new rf and caution signs, batteries and stripping.

Complete
Mar 24, 20222543 Noriega St

At&t: modifications of an unmanned telecom facility. remove 7 antennas, replace 7 new antennas. remove 3 rrus and replace with 3 rrus. remove 20 batteries and replace with 20 new batteries. install new rf safety signs and barriers.

Complete
Mar 14, 2022550 Indiana St

At&t: modification of an unmanned telecom facility. r/r 6 antennas behind frp screen (e). install new rf safety signs, barriers and stripping on rooftop. install 2 rectifiers with (e) dcpp cab. remove (12) 155ah batteries and (8) 180ah batteries from (e) cabs and install 16 new 190ah bat. in (e)cab

Complete
Mar 14, 20222288 Broadway

At&t modification of an unmanned telecom facility consisting of: install (2) new panel antennas, rf safety signs, barriers/stripping. remove diplexers, (2) rrus. install 6648 baseband in (e) rack, (1) rectifier in (e) dcpp, (4) ah batteries in (e) rack. remove (1) ecisting duw in existing rack.

Complete
Mar 14, 2022274 Brannan St

At&t: modification of an unmanned telecom facility. remove + replace 6 panel antennas. install new rf safety signs battiers, stripping on roof. remove + replace 16 batteries & install 2 new rectifiers in (e) dcpp rack,

Complete
Mar 7, 2022539 Bryant St

At&t: modification to an unmanned telecom facitity. r/r 9 antennas, 4 rudomes, 3 rrus and relocate 1 rru at sector c on new mt. install 3 new #6 awg dc power trunks, 3 new 1/4" fiber trunks, new rf safety signs and barriers on rooftop, 3 new dc9 power trunks. r/r 20 batteries. install 12 new

Complete
Mar 3, 2022405 Geary St

At&t: modification of unmanned telecom facility. install 2 new antennas, painted to match (e) bldg on 1 standoff mount. install new rf safety signs, barriers and stripping on rooftop. install 1 new 6648 baseband unit /mux in (e) rack.

Complete
Mar 3, 20224093 24th St

At&t: modification of an unmanned telecom facility. remove and replace 12 antennas within (e) frp vents, 4 rru's. install 2 new dc9 boxes, 3 new power and 2 fiber trunk to new dc9s. new rf safety signs, barriers and stripping. r/r 12 batteries w (e) cabs, 3 new bbu's in (e) cabs, 2 new rectifiers in

Complete
Mar 3, 2022930 Montgomery St

At&t: modification of an unmanned telecom facility. remove & replace 6 antennas. install rf safety signs, secure barricade & stripping on roof. install 1 (n) 6648 bbu/mux in (e) purcell cabinet.

Complete
Feb 10, 2022350 Judah St

At&t: modification of an unnamed telecommunications facility: remove+ replace 6 panel antennas. 1 (n) 12" pipe to pipe extension. 1 (n) dc 9 box, 1 dc power trunk, 1 fiber trunk. remove (e) power plant & install (n) 7100 dc power plant. 12 (n) rectifiers, 1 (n) battery puck. 1 (n) 6648 baseband unit

Complete

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Seung Kun Oh? Request a correction.