Seyedehnastaran Mousavi
Architect · Studio Banaa Arch · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-36573First issued Jul 19, 2017, expires Apr 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 13 permits since 2017, 13 in the last 5 years. Latest filed Sep 7, 2023.
- What kind of projects?
- Commercial or tenant improvement 9 · Home remodel 2 · Addition 1
- How long do their permits take?
- Commercial or tenant improvement: 3 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 9 permits in San Francisco
Time to get a permit
Median from filing to permit, from 9 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 4,704 permits.
Where
- Russian Hill2
- Mission2
- Hayes Valley1
- Bernal Heights1
Most recent
- 188 Octavia StProject consists of a ti in an (e) commercial space for adventurous sports. project to include modifications to (e) layout, plumbing, lighting & hvac. new element include: lightning and outlets, millwork, plumbing, hvac and large exercise equipment.Sep 7, 2023Complete
- 317 Cortland AvInterior remodel to an (e) retail space to accomodate retail dispensary. relocate sinle occupancy restroom, cosmetic upgrades (n) hvac system, new staff break room (n) lighting.Dec 23, 2021Complete
- 1801 Polk St #1Interior remodel of an (e) commercial space to coffee shop/bakery, new coffee bar with new equpment for coffe, baking, equptment for roasting coffe & baking goods. new seating area, lighting, elec & plumbing. modify (e)unisex restroom. remodel area approx 1,720 sq. ft.Nov 12, 2021Complete
- 4248 18th StMinor remodel of (e) commercial space.prevoius use was a pizzeria. modify (e) bar to accomoadte an accessible seating area. minor upgrades to the (e) accessible restroom. replace entry door with a new one & add an automatic door opener.Sep 17, 2021Complete
- 1830 Polk StRemodel of an (e) gym facility & its conversion to an animal hospital. m.e.p. included. prop h.Feb 2, 2021Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 7, 2023 | 188 Octavia St Project consists of a ti in an (e) commercial space for adventurous sports. project to include modifications to (e) layout, plumbing, lighting & hvac. new element include: lightning and outlets, millwork, plumbing, hvac and large exercise equipment. Complete | Commercial or tenant improvement | Complete | 3 months | |
| Aug 3, 2023 | 2169 Folsom St North building: revision to permit 202011068431. remove and replace (e) 2/f framing instead of modifying it. 2/f to have solid cork finish. Complete | Revision or supplement | Complete | Within 1 month | |
| Jun 27, 2023 | 1954 15th St Convert powder rm into full primary bath, replacement of 1 extg window in-kind, new millwork to serve primary bed closet, repair and expand extg ceiling cove in primary bedrm, installation of new lighting fixtures and reconfiguration of 2 extg closets. Complete | Home remodel | Complete | 2 months | |
| Aug 4, 2022 | 2845 Geary Bl Revision to 2020 1130 9843/r2. remove rear windows, remove note about sprinkler. replace exit stair w/ spiral stair. residentail unit: add heater comply w/ nov 202182791. Complete | Revision or supplement | Complete | Within 1 month | |
| Dec 23, 2021 | 317 Cortland Av Interior remodel to an (e) retail space to accomodate retail dispensary. relocate sinle occupancy restroom, cosmetic upgrades (n) hvac system, new staff break room (n) lighting. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Nov 12, 2021 | 1801 Polk St #1 Interior remodel of an (e) commercial space to coffee shop/bakery, new coffee bar with new equpment for coffe, baking, equptment for roasting coffe & baking goods. new seating area, lighting, elec & plumbing. modify (e)unisex restroom. remodel area approx 1,720 sq. ft. Complete | Commercial or tenant improvement | Complete | 3 months | |
| Sep 17, 2021 | 4248 18th St Minor remodel of (e) commercial space.prevoius use was a pizzeria. modify (e) bar to accomoadte an accessible seating area. minor upgrades to the (e) accessible restroom. replace entry door with a new one & add an automatic door opener. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Mar 4, 2021 | 517 08th Av Remodel interior & reconfigure (e) stairs at backyard. basement: add powder room. 1st fl: kitchen remodel. 2nd fl: 2 bathrooms remodel, upgrade finish throughout. replace all (e) windows facing street & rear in-kind. at rear add 1 fixed window & replace sliding door. (n) light fixtures. Complete | Home remodel | Complete | 2 months | |
| Mar 1, 2021 | 1490 Ocean Av #304 Reconfiguration of an awning on the roof level. demolition of existing awning on roof level. addition of a new awning with structural columns. new lighting. Cancelled | Deck, stairs or patio cover | Cancelled | — | |
| Feb 2, 2021 | 1830 Polk St Remodel of an (e) gym facility & its conversion to an animal hospital. m.e.p. included. prop h. Complete | Commercial or tenant improvement | Complete | 2 months | |
| Nov 30, 2020 | 2845 Geary Bl Horizontal addition. remodel & addition to convert an existing restaurant to a cannabis retail dispensary on ground floor. residential unit above stays intact, with an addition of deck to it. Complete | Commercial or tenant improvement | Complete | 10 months | |
| Nov 6, 2020 | 2169 Folsom St No.bldg: interior upgrade to a 382sf commercial space; remodel of (e)loft ladder and sheet medeal flooring at loft, structurl upgrade to loft structure, new spiral stairs and guardrail, minor lighting replacement, modification to (e) sink counter.create space of (e) loft into legal story-level. Complete | Commercial or tenant improvementType unconfirmed | Complete | 33 months | |
| Dec 27, 2019 | 723 Larkin St Bringing warm shell space to occupy a restaruant n/a maher Issued | Commercial or tenant improvement | Issued | 43 months | |
| Jun 1, 2018 | 376 Utah St 6000 sq ft interior remodel to e building located at 376 utah in sf scope includes additon of walls to create robotics workshop, open office related to robotic production, conference room, upgrade to rear exit door, mirnor upgrades to staff breakroom kitchenette. restrooms existing and meet accessib Complete | Commercial or tenant improvementType unconfirmed | Complete | Within 1 month | |
| Oct 27, 2017 | 237 14th Av Intr&extr remodel. incl conversion bsmt(g/fl)space into a living space, addition to 1st & 2nd fl.living space on west facing side of(e)bldg towards(e)backyard.add a deck on 1/fl & new balcony on 2/fl.enclosure (e)entry staircase w/ 3 skylights. Complete | Addition | Complete | 20 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Seyedehnastaran Mousavi? Request a correction.