Simin Naaseh
Engineer · Forell/Elesser Engineering · Oakland
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeStructural Engineer S-3009First issued Aug 21, 1987, expires Sep 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 6 permits since 2011, 6 in the last 5 years. Latest filed Jul 28, 2026.
- What kind of projects?
- Commercial or tenant improvement 4 · Home remodel 1 · Seismic retrofit or foundation 1
- How long do their permits take?
- Commercial or tenant improvement: 2 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 4 permits in San Francisco
Time to get a permit
Median from filing to permit, from 4 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 8,860 permits.
Where
- Financial District/South Beach2
- Russian Hill1
- Mission Bay1
Most recent
- 201 Post StFloors 5-7: install (2) new stairwells for floor to floor circulation.Jul 28, 2026Issued
- 655 Beach St2/f suite 210: interior tenant improvement to (e) office space including non-structural partitions, doors, structural operable partition, suspended ceilings, casework, finishes and furniture. no change in occupancy or tenant.Dec 15, 2025Complete
- 139 Townsend StSuite 150 mezz. interior ti. improvement, new partion, finishes, lighting & equipment n/a maherDec 23, 2019Issued
- 201 Post StInterior ti of (e) basement & ground floor retail store, scope to include (n) stair, elevator, restrooms, partitions, millwork, mep, no exterior work under this permit. fire protection under separate permitNov 15, 2016Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Jul 28, 2026 | 201 Post St Floors 5-7: install (2) new stairwells for floor to floor circulation. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Dec 15, 2025 | 655 Beach St 2/f suite 210: interior tenant improvement to (e) office space including non-structural partitions, doors, structural operable partition, suspended ceilings, casework, finishes and furniture. no change in occupancy or tenant. Complete | Commercial or tenant improvement | Complete | 3 months | |
| Jun 23, 2022 | 1155 Battery St Work consist of removing test sample from steel column space weld metal for testing by others. sample areas required reinforcing prior to removing samples as indicated on plan. remove & replace (e) finishes & spray applied fire proofing as required. fls: 2, 4, 6. Issued | Home remodelType unconfirmed | Issued | Within 1 month | |
| Dec 23, 2019 | 139 Townsend St Suite 150 mezz. interior ti. improvement, new partion, finishes, lighting & equipment n/a maher Issued | Commercial or tenant improvement | Issued | 2 months | |
| Nov 15, 2016 | 201 Post St Interior ti of (e) basement & ground floor retail store, scope to include (n) stair, elevator, restrooms, partitions, millwork, mep, no exterior work under this permit. fire protection under separate permit Complete | Commercial or tenant improvement | Complete | 3 months | |
| May 16, 2011 | 2455 Golden Gate Av Tower crane foundation permit in accordance w/ ab-023 Issued | Seismic retrofit or foundation | Issued | 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Simin Naaseh? Request a correction.