Stephen B Andrews
Architect · Eag Studio · Petaluma
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-28757First issued Nov 19, 2001, expires Nov 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 9 permits since 2018, 9 in the last 5 years. Latest filed Apr 23, 2025.
- What kind of projects?
- Deck, stairs or patio cover 4 · Home remodel 2 · Other 2
- How long do their permits take?
- Deck, stairs or patio cover: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Deck, stairs or patio cover: 4 permits in San Francisco
Time to get a permit
Median from filing to permit, from 3 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 5,514 permits.
Where
- Marina2
- West of Twin Peaks1
- Western Addition1
Most recent
- 2569 Greenwich StDemolition of (e) deck at level 2. reconstruct (n) deck at level 2. install (n) handrail at deck level 2. install new simpson ties at level 2 deck to (e) house.May 6, 2022Filed
- 289 San Marcos AvReplace (e) wood decking w/ (n) trex decking. replace (e) wood deck rail w/ (n) steel cable rail. add light strip to top rail. less than 50%.Apr 5, 2022Complete
- 2320 Union StNew roof deck on level 3 and level 4. infill at lower level south lightwell. interior reconfiguration of unit1&2 on all levels new bathroom, bedroom & media room on level 1, move garage door to be recessed from front 1'-6"Oct 23, 2018Issued
- 1849 Golden Gate Av #2Unit 2: replace (e) post to beam connectors made of plywood & nails with new simpson pre engineered connectors, for positive connection @ ext. deck. maher naFeb 22, 2018Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 25, 2026 | 1501 Grove St Revision to 202307121975: issued to rebuild an e) play structure, remove slide from original scope of work, add guardrail where slide was, slide was never installed Issued | Revision or supplement | Issued | Within 1 month | |
| Apr 23, 2025 | 2609 California St #0 Bathroom remodel. enclosed laundry and utility room in garage. new sauna at ground fl Issued | Home remodel | Issued | Within 1 month | |
| Jul 23, 2024 | 706 Mission St #18 Revision to pa# 2023-0823-5060 provide drawings that show new partition walls Complete | Revision or supplement | Complete | 3 months | |
| May 6, 2022 | 2569 Greenwich St Demolition of (e) deck at level 2. reconstruct (n) deck at level 2. install (n) handrail at deck level 2. install new simpson ties at level 2 deck to (e) house. Filed | Deck, stairs or patio cover | Filed | — | |
| Apr 5, 2022 | 289 San Marcos Av Replace (e) wood decking w/ (n) trex decking. replace (e) wood deck rail w/ (n) steel cable rail. add light strip to top rail. less than 50%. Complete | Deck, stairs or patio cover | Complete | Within 1 month | |
| May 24, 2021 | 2740 Divisadero St 3rd fl - (n) bathroom in master bedroom, remove and replace 2 windows in kind (not visible from st), remove wood burning fire place; in media room remove 1 window, relocate (e) gas fireplace, repair (e) flfoor, add sink. add 2 skylights to (n) bathroom Complete | Home remodel | Complete | Within 1 month | |
| Jul 24, 2019 | 4 Windsor Pl Facade remodel. replace (e) curtain panel system at front w/ operable sliding doors, guardrails, apply (n) stucco surface and architectural decorative features. replace (e) rain screen at side w/ (n) louvered rainscreen Issued | Other | Issued | 1 month | |
| May 8, 2019 | 64 Beaver St Level 1- convert garage storage areas into conditioned space for lower unit. infill west lightwell at level 1 only. level 2- reconfigure sq footage and windows in lightwells and at rear. level 3- reconfigure interior layout to upper unit. (n) roof deck to upper unit. facade- replace windows in-kind Complete | AdditionType unconfirmed | Complete | 3 months | |
| Oct 23, 2018 | 2320 Union St New roof deck on level 3 and level 4. infill at lower level south lightwell. interior reconfiguration of unit1&2 on all levels new bathroom, bedroom & media room on level 1, move garage door to be recessed from front 1'-6" Issued | Deck, stairs or patio coverType unconfirmed | Issued | 3 months | |
| Sep 26, 2018 | 435 Marina Bl Add neighboring setback to scope of work to correct app#201511061988. pull back window wall and front decks to neighboring average setback Complete | Revision or supplementType unconfirmed | Complete | Within 1 month | |
| Feb 22, 2018 | 1849 Golden Gate Av #2 Unit 2: replace (e) post to beam connectors made of plywood & nails with new simpson pre engineered connectors, for positive connection @ ext. deck. maher na Issued | Deck, stairs or patio cover | Issued | Within 1 month | |
| Feb 16, 2018 | 1849 Golden Gate Av #2 Enclose existing patio storefront glass. patio is located under existing overhang. maher n/a Issued | OtherType unconfirmed | Issued | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Stephen B Andrews? Request a correction.