Steven Eric O'connor
Engineer · Engineer Soil Repairs, Inc. · Concord
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeCivil Engineer C-39813First issued Aug 23, 1985, expires Dec 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 16 permits since 2007, 16 in the last 5 years. Latest filed Sep 8, 2025.
- What kind of projects?
- Retaining wall or site work 11 · Other 4 · Deck, stairs or patio cover 1
- How long do their permits take?
- Retaining wall or site work: within 1 month. City typical for the same review: 12 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Retaining wall or site work: 11 permits in San Francisco
Time to get a permit
Median from filing to permit, from 10 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 872 permits.
Where
- Mission Bay5
- Pacific Heights2
- Sunset/Parkside1
- Bernal Heights1
Most recent
- 325 China Basin St #104Miscellaneous building repair. existing below grade sewer line and storm line repairs and access tunnels with associated existing grade slab, landscaping, and hardscape restoration to match existing.Nov 7, 2023Filed
- 2783 34th AvRemove rear fence & failed retaining wall (wood). install modular block retaininig in same location to match area. replace wood fence.Nov 10, 2022Complete
- 335 Berry St #100Saw cut concrete podium slab and excavate trenches to expose underground sewer system. shore tunnel in exposed sections. plumbing repairs by others. replace concrete podium slab upon completion of plumbing workSep 29, 2021Complete
- 330 Berry St #100Saw cut concrete podium slab and excavate trenches to expose underground sewer system. shore tunnel in exposed sections. plumbing repairs by others. replace concrete podium slab upon completion of plumbing workSep 29, 2021Complete
- 316 Rutledge StStairway and basement area subdrain work, basement foundation wall damp proofing.Jun 28, 2016Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 8, 2025 | 588 Mission Bay Blvd North Bl Excavate and shore tunnels underneath the pile supported podium slab so that the plumbing maintrunk lines can be replaced and the branch linerepaired or replaced as required. access to the underside of the pile supported podium slab will be made through openings in the podium slab floor & exterior Issued | OtherType unconfirmed | Issued | 2 months | |
| Nov 7, 2023 | 325 China Basin St #104 Miscellaneous building repair. existing below grade sewer line and storm line repairs and access tunnels with associated existing grade slab, landscaping, and hardscape restoration to match existing. Filed | Retaining wall or site work | Filed | — | |
| Nov 10, 2022 | 2783 34th Av Remove rear fence & failed retaining wall (wood). install modular block retaininig in same location to match area. replace wood fence. Complete | Retaining wall or site work | Complete | 9 months | |
| Sep 29, 2021 | 335 Berry St #100 Saw cut concrete podium slab and excavate trenches to expose underground sewer system. shore tunnel in exposed sections. plumbing repairs by others. replace concrete podium slab upon completion of plumbing work Complete | Retaining wall or site work | Complete | Within 1 month | |
| Sep 29, 2021 | 330 Berry St #100 Saw cut concrete podium slab and excavate trenches to expose underground sewer system. shore tunnel in exposed sections. plumbing repairs by others. replace concrete podium slab upon completion of plumbing work Complete | Retaining wall or site work | Complete | Within 1 month | |
| Feb 27, 2021 | 420 Mission Bay Blvd North Bl #101 Roof repairs, fire wall and penetration repairs, garage surface coating repairs, below-grade sewer access tunnel/ repairs, misc electrical repairs. working on common area. Complete | Other | Complete | 18 months | |
| Mar 13, 2018 | 235 Berry St #107 Remove concrete setions in those areas and dig test pits to acces plumbing for 3rd party plumbing inspection common area, replace rebar and concrete after test Complete | OtherType unconfirmed | Complete | Within 1 month | |
| Jul 20, 2016 | 325 China Basin St #105 Unit #105: excavate tunnel under concrete floor slab to repair damaged sewer pipe pluming work done by others. maximum quantity of soil to be excavated and removed off site shall not exceed 25 cubic yard. Complete | OtherType unconfirmed | Complete | Within 1 month | |
| Jun 28, 2016 | 316 Rutledge St Stairway and basement area subdrain work, basement foundation wall damp proofing. Complete | Retaining wall or site workType unconfirmed | Complete | Within 1 month | |
| Oct 16, 2015 | 325 Berry St #101 Trench excavation under pile supported podium slab and installation of permanent shoring so plumbing repair work (separate permit & plans) can be done. common area. ** maher: compliance with ordinance no# 155-13 required; route to dph ** Complete | Retaining wall or site work | Complete | 14 months | |
| Jun 3, 2015 | 255 Berry St #101 Dig trenches & shoring beneath existing podium slab so that the sewer & storm drain lines can be replaced. this application is for trenching only. all plumbing work will be done by others under a separate permit. "work in common" area. n/a maher ordinance Complete | Retaining wall or site work | Complete | 2 months | |
| Apr 25, 2013 | 150 Lombard St Waterproofing of courtyard deck & planting areas. new landscape & irrigation accessibility upgrades. Complete | Deck, stairs or patio cover | Complete | 2 months | |
| Feb 16, 2012 | 77 Grand View Av #104 Subgrade drainage repairs - saw cut conc slab adjacent to the wall planel, remove conc to install new drain pipe (25 lf). drill weep holes along the base of the wall. install new drainage panel up against the concrete foundation wall, install wire mesh, new 3-inch shotcrete surface. prime and Complete | Retaining wall or site work | Complete | Within 1 month | |
| Dec 10, 2010 | 1534 Taylor St Extg retaining wall repairs: core-drill 4 - 8" dia holes (tieback holes). install dcp anchors with centralizers. fill tieback holes with high strength grout. construct reinforced concrete whaler 1' thick and 2' deep. Complete | Retaining wall or site work | Complete | 2 months | |
| Feb 12, 2007 | 2555 Green St Front retaining wall, drainage, waterproofing, stairway/landing, sub grade drainage and flashing repair. Complete | Retaining wall or site work | Complete | Within 1 month | |
| Feb 12, 2007 | 2545 Green St Behind front retaining wall, drainage, waterproofing stairway/landing sub grade drainage & flashing repair work. Complete | Retaining wall or site work | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Steven Eric O'connor? Request a correction.