Suwanty Mulia
Architect · Nelson Architect
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-33446First issued Jan 24, 2012, expires Jun 30, 2027.
Source: DCA License Search, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 29 permits since 2015, 29 in the last 5 years. Latest filed Oct 21, 2026.
- What kind of projects?
- Commercial or tenant improvement 28 · Deck, stairs or patio cover 1
- How long do their permits take?
- Commercial or tenant improvement: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 28 permits in San Francisco
Time to get a permit
Median from filing to permit, from 28 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 23,779 permits.
Where
- Financial District/South Beach22
- Chinatown3
- Sunset/Parkside1
- West of Twin Peaks1
Most recent
- 1945 Irving StInterior renovation of an existing bank of america. scope of work includes new furniture, millwork, finishes, power, data, equipment, and mep throughout.Oct 21, 2026Issued
- 595 Market StTi suite 1100: demo and replacement of ceiling system. lighting, casework and finishes, demo of some partitons, new full height partitions, modification mep upgradesJul 15, 2026Issued
- 650 California St #027th floor: selective renovation and minor demolition. new construction includes floor, wall and ceiling finishes, power and lighting. fire sprinkler and alarm are deffered submittals.Jun 23, 2026Issued
- 55 Spear St18f t.i: demo done under permit. new partitons & doors, ceilings, lights, el distribution. mep included. including structural work. n unisex accessible toilet. see coversheet for cope. deffered submittal: fire alarm, fire sprinklers, network anchor + health review at pantry.Jun 3, 2026Issued
- 345 California St6/f & 7/f: installation office phone booth anchorage & structural details included.May 27, 2026Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 21, 2026 | 1945 Irving St Interior renovation of an existing bank of america. scope of work includes new furniture, millwork, finishes, power, data, equipment, and mep throughout. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Aug 17, 2026 | 55 Spear St 18th floor: revision to bpa: 202606032408 room 18-009/ pantry and finishes to single sex rr was deferred. adressing architectural set and corresponding meps for this review. Issued | Revision or supplement | Issued | 1 month | |
| Jul 15, 2026 | 595 Market St Ti suite 1100: demo and replacement of ceiling system. lighting, casework and finishes, demo of some partitons, new full height partitions, modification mep upgrades Issued | Commercial or tenant improvement | Issued | 1 month | |
| Jun 23, 2026 | 650 California St #0 27th floor: selective renovation and minor demolition. new construction includes floor, wall and ceiling finishes, power and lighting. fire sprinkler and alarm are deffered submittals. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Jun 3, 2026 | 55 Spear St Spear street tower, 17th flr: t.i. selected demo of remaining soffite and partitions, primary demo under 202603137532. new construction will consist of new partitions and doors, ceilings, light fixtures and electrical distribution. meps. Issued | Revision or supplementType unconfirmed | Issued | Within 1 month | |
| Jun 3, 2026 | 55 Spear St 18f t.i: demo done under permit. new partitons & doors, ceilings, lights, el distribution. mep included. including structural work. n unisex accessible toilet. see coversheet for cope. deffered submittal: fire alarm, fire sprinklers, network anchor + health review at pantry. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| May 27, 2026 | 345 California St 6/f & 7/f: installation office phone booth anchorage & structural details included. Issued | Commercial or tenant improvement | Issued | 3 months | |
| Mar 24, 2026 | 106 West Portal Av Add a new greeter desk focal wall to the existing lobby area. existing beverage bar to be removed and new closet added. scope of work includes typical electrical modifications as needed. ther are no planned alterations to the mechanical,plumbing,fire protection or overall building structure Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Mar 13, 2026 | 1 Market St 17th fl - selective interior demo only (ab-017) ref 26-158 Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Mar 13, 2026 | 1 Market St 18th fl - selective interior demo only (ab-017) ref fire 26-158 Issued | Commercial or tenant improvementType unconfirmed | Issued | Within 1 month | |
| Dec 23, 2025 | 55 Spear St 36th fl - minor ti to accomodate a new focus room and trade desk space. new wall power Issued | Commercial or tenant improvement | Issued | 5 months | |
| Nov 5, 2025 | 445 Powell St #0 Ab-017: decommissioning of bank of america. removal of bank furniture, equipment, vault and other bank elements related to bofa; removal of exterior atm; deposit box. scope of work will not public right of way Complete | Commercial or tenant improvement | Complete | 1 month | |
| Jul 3, 2025 | 345 California St 8/f: demo only permit. demo suite includs interior partition, finishes, millwork, plumbing and electrical fixtures. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Mar 7, 2025 | 50 Fremont St New tenant improvement project including demo of e conference rooms, modifications to existing breakroom layout and adding an additional unisex restroom, new millwork at existing breakroom, installation of new phone booths. mep deferred. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jun 5, 2024 | 345 California St 29th floor: t.i. in existing tenant space. demolition includes some walls, millwork, and finishes. new construction to include walls, doors, millwork, power, finishes, etc. no structural work is required. no change to occupancy type or building egress system. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| May 23, 2024 | 1 Embarcadero Center 34th/f: ref 201907035059. office t.i. to include replacement on lobby door to (n) non load bearing fire rated entry door. no change of occupancy or use Complete | Commercial or tenant improvementType unconfirmed | Complete | 9 months | |
| Oct 24, 2023 | 1 Embarcadero Center 34/f: minor interior only ti, limited to relocating 2-existing doors, lighting controls relocation. no new lighting fixtures or wiring or branch circuits, no changes to bldg life safety system devices. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jun 14, 2023 | 8 Mission St New exterior pergola @ (e) hotel's dining patio Cancelled | Deck, stairs or patio cover | Cancelled | — | |
| Nov 8, 2022 | 345 California St 28th & 29th fl - revision to pa 2022-0621-6751 minor finishes changes and demo scope changes. Complete | Revision or supplement | Complete | Within 1 month | |
| Oct 12, 2022 | 601 Montgomery St Revision to pa 2022-0505-3643 relocateion of it rack. "meeting room" revised to "offices". revise floor power & signal plan. relocationg floor furniture & equipment plan Issued | Revision or supplement | Issued | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Suwanty Mulia? Request a correction.