Tamara A Dinsmore
Architect · Odada
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-33911First issued Oct 4, 2012, expires Dec 31, 2027.
Source: DCA License Search, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 10 permits since 2019, 10 in the last 5 years. Latest filed Mar 2, 2026.
- What kind of projects?
- Home remodel 8 · Other 2
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 8 permits in San Francisco
Time to get a permit
Median from filing to permit, from 8 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 13,057 permits.
Where
- Nob Hill3
- Pacific Heights3
- North Beach1
- Castro/Upper Market1
Most recent
- 1170 Sacramento St #11Unit 11c: provide and install new door frame at new opening. relocate existing door. install new drywall at existing opening.Mar 8, 2024Suspend
- 1170 Sacramento St #11Unit # 11-c: (n) opening between 2 (e) apartment units. (n) 60 min fire rated roll down door at opening. patch and repair gyp bd. ceiling at (n) opening.Feb 7, 2024Suspend
- 1170 Sacramento St #11Unit # 11-d: (n) opening between 2 (e) apartment units. (n) 60 min fire rated roll down door at opening. patch and repair gyp bd. ceiling at (n) opening.Jan 31, 2024Suspend
- 1230 Kearny StBathroom and kitchen remodel. replace plumbing fixtures. new kitchen appliances; new flooring; new led in kind. no structural changes. (3) bathrooms & (1) kitchen.Jan 10, 2022Complete
- 2650 Pierce StRemodel 2 (e) bathrooms. retrofit (e) closet to shower. install new closest in adj bedroom.Sep 22, 2021Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Mar 2, 2026 | 1940 Broadway #8 Level 8/unit 8: interior renovation window and skylight replacement. no structural work. Issued | OtherType unconfirmed | Issued | Within 1 month | |
| Mar 8, 2024 | 1170 Sacramento St #11 Unit 11c: provide and install new door frame at new opening. relocate existing door. install new drywall at existing opening. Suspend | Home remodel | Suspend | Within 1 month | |
| Feb 7, 2024 | 1170 Sacramento St #11 Unit # 11-c: (n) opening between 2 (e) apartment units. (n) 60 min fire rated roll down door at opening. patch and repair gyp bd. ceiling at (n) opening. Suspend | Home remodelType unconfirmed | Suspend | Within 1 month | |
| Jan 31, 2024 | 1170 Sacramento St #11 Unit # 11-d: (n) opening between 2 (e) apartment units. (n) 60 min fire rated roll down door at opening. patch and repair gyp bd. ceiling at (n) opening. Suspend | Home remodelType unconfirmed | Suspend | Within 1 month | |
| Jan 10, 2022 | 1230 Kearny St Bathroom and kitchen remodel. replace plumbing fixtures. new kitchen appliances; new flooring; new led in kind. no structural changes. (3) bathrooms & (1) kitchen. Complete | Home remodel | Complete | Within 1 month | |
| Sep 22, 2021 | 2650 Pierce St Remodel 2 (e) bathrooms. retrofit (e) closet to shower. install new closest in adj bedroom. Complete | Home remodel | Complete | Within 1 month | |
| May 26, 2021 | 2661 Broadway Demo of (e) interior stair l1 & l2. fabrication & construction of (n) stair. Complete | Home remodel | Complete | Within 1 month | |
| Nov 4, 2020 | 2661 Broadway Replace plumbing fixtures in 6 bathrooms, new appliances at offices millwork, refinish (e) wood floors, new lighting at bathroom mirrors. Complete | Home remodel | Complete | Within 1 month | |
| Nov 8, 2019 | 999 Green St #3001 Relocate non-street facing north window wall to enclose balcony per za builletin 4 & za interpretation. 311 upper floor voids 1/07 Expired | OtherType unconfirmed | Expired | 1 month | |
| Sep 30, 2019 | 151 Saturn St Interior remodel including new stair, bathroom and storage rooms, new partitions Complete | Home remodel | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Tamara A Dinsmore? Request a correction.