Thomas Henry Lutge
Engineer · Thomas H. Lutge, Se · San Rafael
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeStructural Engineer S-3160First issued Nov 18, 1988, expires Dec 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- 1 public board actionApr 13, 2012Final decision
Final Decision in Case No. 859-A Effective April 13, 2012
Source: BPELSG decision PDF, retrieved Nov 5, 2026
- Worked in San Francisco?
- 25 permits since 2004, 25 in the last 5 years. Latest filed Jun 17, 2026.
- What kind of projects?
- Seismic retrofit or foundation 10 · Home remodel 5 · Retaining wall or site work 4
- How long do their permits take?
- Seismic retrofit or foundation: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Seismic retrofit or foundation: 10 permits in San Francisco
Time to get a permit
Median from filing to permit, from 8 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 4,701 permits.
Where
- Marina3
- Pacific Heights2
- Inner Sunset2
- Bernal Heights1
Most recent
- 3160 Mission StSeismic retrofit to lower scenario expected loss below 20% to satisfy us bank loan. this will completed by installing through bolts around the building.Mar 27, 2026Filed
- 2938 Clay StFront foundation repair approximately 6'-0" due to removal of concrete planter and treeJul 1, 2024Complete
- 2800 Green StPhase 1 voluntary lateral force resisting system alterations to the east half of home's red vrick unreinforced masonry bearing wall foundation for the safety of the homeowner's here as allowed by all code. retrofit per engineer plans in accordance w/changer a3 of the cebcSep 28, 2023Withdrawn
- 2927 Sacramento St #0Existing concrete foundation underpinned with red brick unreinforced masonry so building to have voluntary seismic safety improvement using 2019 cebc gs 503.13 upgrade voluntary lateral force system alterationsJul 12, 2021Complete
- 828 Balboa St2016 iebc section 403.9 voluntary structural (seismic) improvements for the safety of these homeowners here with front u.r.m. stair upgrading and rear tall post upgrades using steel and concrete.Oct 31, 2017Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Jun 17, 2026 | 1953 Eddy St Red brick unreinforced masonry chimneys have cracked/shifted & must be removed for safety. Complete | OtherType unconfirmed | Complete | Within 1 month | |
| Mar 27, 2026 | 3160 Mission St Seismic retrofit to lower scenario expected loss below 20% to satisfy us bank loan. this will completed by installing through bolts around the building. Filed | Seismic retrofit or foundation | Filed | — | |
| Jan 5, 2026 | 109 Liberty St Existing dbi permits that have been applied for pa #201910184989 & planning apps 2025-009415prl & 2019-017325prj/coa/pic fail to show the existing dangerous leaning chimney nor the leaning building that is in instant need for temporary safety here. Filed | Revision or supplementType unconfirmed | Filed | — | |
| Jul 1, 2024 | 2938 Clay St Front foundation repair approximately 6'-0" due to removal of concrete planter and tree Complete | Seismic retrofit or foundation | Complete | Within 1 month | |
| Apr 4, 2024 | 605 Chenery St Wall removal. demo only. Complete | Commercial or tenant improvementType unconfirmed | Complete | Within 1 month | |
| Mar 29, 2024 | 154 25th Av Voluntary lateral force - resisting system due to concrete deteriortation. Filed | Home remodel | Filed | — | |
| Sep 28, 2023 | 2800 Green St Phase 1 voluntary lateral force resisting system alterations to the east half of home's red vrick unreinforced masonry bearing wall foundation for the safety of the homeowner's here as allowed by all code. retrofit per engineer plans in accordance w/changer a3 of the cebc Withdrawn | Seismic retrofit or foundation | Withdrawn | — | |
| Dec 28, 2022 | 1924 Pine St Rev to pa202010106289: shoring design of cantilever piers in the non-constrained use has large potential risk as house in fact is constrained & thus we desire a safer design that is conservative. Issued | Revision or supplement | Issued | 14 months | |
| Jul 19, 2022 | 4052 18th St #0 Provide concovtric mid-support post/beam to stop joist breaks. provide west side neighbor undermining settlment safety matt slab. provide a front steel monment frame for lateral safety Issued | Home remodelType unconfirmed | Issued | 3 months | |
| Jun 21, 2022 | 1900 Washington St Add non structural 4" concrete wall protection to existing concrete perimeter wall at south west corner of ground floor where exterior soil backfill placement allows inside air condensation of warm air on cooler concrete. Complete | OtherType unconfirmed | Complete | Within 1 month | |
| Jul 12, 2021 | 2927 Sacramento St #0 Existing concrete foundation underpinned with red brick unreinforced masonry so building to have voluntary seismic safety improvement using 2019 cebc gs 503.13 upgrade voluntary lateral force system alterations Complete | Seismic retrofit or foundation | Complete | 1 month | |
| Feb 14, 2020 | 1273 A Rhode Island St Revise pa #202002043522 with new cbc (bd) 503.b voluntary reinforcement of existing concrete retaining walls of the rear building, add drainage; install plywood sheathing in existing perimeter walls on the lower level. Issued | Revision or supplement | Issued | Within 1 month | |
| Jul 5, 2019 | 1924 Pine St Rev to pa201907014856. voluntary seismi improvement per 2016cebc[bs]403.9. for the removal of the older year 1900 red brick foundation with a new redundatutly conservative dutile reinforced concrete foundation as shows on plans. Issued | Revision or supplement | Issued | Within 1 month | |
| Dec 20, 2017 | 472 03rd St In order to provide for a safe structural sidewalk here we must place a safety barricade and figure out what this existing sidewalk is made of Cancelled | Retaining wall or site workType unconfirmed | Cancelled | — | |
| Oct 31, 2017 | 828 Balboa St 2016 iebc section 403.9 voluntary structural (seismic) improvements for the safety of these homeowners here with front u.r.m. stair upgrading and rear tall post upgrades using steel and concrete. Complete | Seismic retrofit or foundation | Complete | Within 1 month | |
| Jun 7, 2017 | 1690 Greenwich St #0 Voluntary seismic upgrage to (e) spread footing foundation with grade beam ties for earthquake continuity here Complete | Seismic retrofit or foundation | Complete | Within 1 month | |
| Jan 15, 2016 | 104 Guerrero St #0 Provide temporary crib shoring for safety to allow for the soft story safety work at 120 guerrero next door. Cancelled | Retaining wall or site workType unconfirmed | Cancelled | Within 1 month | |
| Dec 1, 2015 | 523 Roosevelt Wy City of s.f. section 604 deck handrail replacement for existing decks with new h.d.g. code correct steel handrails and minor rot repair to exposed wood eaves, all as shown on drawing. repair in kind. Complete | Deck, stairs or patio cover | Complete | Within 1 month | |
| Dec 2, 2014 | 3016 Scott St Cbc chapter 34 existing structure section 3404.5 "voluntary seismic improvements". the vrm is to be upgraded and reinforced along with complete foundation anchor bolting here. compliance with maher ordinance no 155-13 not required. Complete | Seismic retrofit or foundation | Complete | Within 1 month | |
| Jun 16, 2014 | 1132 Green St Revision to shoring plan approved under permit 201309278015. correction notice issued and this permit provides here in corrected safety required. Complete | Revision or supplement | Complete | 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Thomas Henry Lutge? Request a correction.