Wen Chao Huang
Engineer · Wngs Construction · Daly City
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeCivil Engineer C-78241First issued Jun 10, 2011, expires Sep 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 18 permits since 2017, 18 in the last 5 years. Latest filed Jun 29, 2026.
- What kind of projects?
- Home remodel 6 · Legalize or fix a violation 5 · Commercial or tenant improvement 3
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 6 permits in San Francisco
Time to get a permit
Median from filing to permit, from 6 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 13,564 permits.
Where
- Outer Richmond2
- West of Twin Peaks1
- Outer Mission1
- Castro/Upper Market1
Most recent
- 2800 Balboa St #0Unit b: convert portion of the (e) rear ground floor unit (unit b) into a garage and convert unit b into studioJun 29, 2026Issued
- 206 Juanita WyBasement: add 1 liveing room, 1 full bath, add deck at rear. 1st fl add 2 bedrooms, 2 full baths, family room, laundry and wetbar. 2nd fl relocate kitchen, combine 2 existing bedrooms into master suite, add 1 power roomJun 4, 2026Issued
- 62 Oneida Av1) infill center light well 2nd flr. 2) kitchen & bathroom remodel on the 2nd flr.Jan 22, 2026Complete
- 2275 15th StConvert closet into full bathroom, add sink to powder, and convert (e) dining room into bedroom on 2nd and 3rd flr.Aug 19, 2025Complete
- 3139 Balboa St1/f: convert storage to gym room, office and 3 fixtures bathroom. install 2 tankless water heater and washer/dryer. 2/f and 3/f: remodel kitchen, bathroom and dining room (ref 202503283275 for kitchen and bath remodel in kind). add a 3 fixtures bathroom in the bedroom.Apr 29, 2025Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Aug 17, 2026 | 1210 Stanyan St Revision to pa 202501067763 & 202510308521 1st fl revised kitchen layout & add fire place @ dining; replaced front gate with entry door; relocate water heater & boiler garage; 2nd fl - reconfigure bath layout & add fireplace @ living room; extend front exterior stucco finish to 2nd fl; 3rd fl - Filed | Revision or supplement | Filed | — | |
| Aug 13, 2026 | 158 Miramar Av Rev to pa# 2024-1126-5747: revised stair design Filed | Revision or supplement | Filed | — | |
| Jun 29, 2026 | 2800 Balboa St #0 Unit b: convert portion of the (e) rear ground floor unit (unit b) into a garage and convert unit b into studio Issued | Home remodelType unconfirmed | Issued | 2 months | |
| Jun 8, 2026 | 566 Castro St Revison to bpa 202602045249. replacement of (e) privacy curtains with doors at massage rooms. (all door leading to massage room shall not be equipped with locking devices per sfdph requirements) minor modifications and/or additions to mechanical, electrical and plumbing system. Cancelled | Revision or supplement | Cancelled | Within 1 month | |
| Jun 4, 2026 | 206 Juanita Wy Basement: add 1 liveing room, 1 full bath, add deck at rear. 1st fl add 2 bedrooms, 2 full baths, family room, laundry and wetbar. 2nd fl relocate kitchen, combine 2 existing bedrooms into master suite, add 1 power room Issued | Home remodel | Issued | Within 1 month | |
| Mar 27, 2026 | 1571 Wallace Av To establish cannabis cultivation use from warehouse/storage. per planning approval cua 2024-010499. Filed | Commercial or tenant improvement | Filed | — | |
| Jan 29, 2026 | 1210 Stanyan St Revision to pa 202501067763 & 202510308521 revised structural drawing & details Issued | Revision or supplement | Issued | Within 1 month | |
| Jan 22, 2026 | 62 Oneida Av 1) infill center light well 2nd flr. 2) kitchen & bathroom remodel on the 2nd flr. Complete | Home remodel | Complete | 1 month | |
| Oct 30, 2025 | 1210 Stanyan St Revision to 202501067763. enlarge the garage door, relocate both unit entrances. install rear yard access. install windows in unit 1210 b. reconfigure interior stair. reconfig bedrm bath lyout at front of house. skylight at stairwell,all windows to viny, replace e cement siding w wood stucco through Issued | Revision or supplement | Issued | Within 1 month | |
| Oct 2, 2025 | 631 33rd Av Revision to pa 202503313351 replace furnaces with a mini-split hvac system; relocate water heaters for both units; reconfigure interior stair in unit 633; update window & door styles on the 2nd and 3rd floor where not visible from the street; install 2 new skylights on the 3rd floor and update the Issued | Revision or supplement | Issued | Within 1 month | |
| Sep 16, 2025 | 375 Byxbee St To comply with nov#202432156. legalized one story side deck and stairs by adding fire rated wall. Complete | Legalize or fix a violation | Complete | Within 1 month | |
| Aug 19, 2025 | 2275 15th St Convert closet into full bathroom, add sink to powder, and convert (e) dining room into bedroom on 2nd and 3rd flr. Complete | Home remodel | Complete | Within 1 month | |
| Aug 7, 2025 | 3253 Mission St Revision to pa 202212309503 reconfigure restaurant layout, including the ada restroom and interior stair case Issued | Revision or supplement | Issued | 3 months | |
| Jun 23, 2025 | 84 Longview Ct Add deck at rear of property. Complete | Deck, stairs or patio cover | Complete | Within 1 month | |
| Apr 29, 2025 | 3139 Balboa St 1/f: convert storage to gym room, office and 3 fixtures bathroom. install 2 tankless water heater and washer/dryer. 2/f and 3/f: remodel kitchen, bathroom and dining room (ref 202503283275 for kitchen and bath remodel in kind). add a 3 fixtures bathroom in the bedroom. Complete | Home remodel | Complete | Within 1 month | |
| Feb 18, 2025 | 309 Molimo Dr Remove & replace e) deck due to dry rot. revision to 202410072385. rear deck replace in-kind Complete | Revision or supplement | Complete | Within 1 month | |
| Nov 26, 2024 | 158 Miramar Av Add a deck @ rear of building Issued | Deck, stairs or patio cover | Issued | 10 months | |
| Oct 16, 2024 | 1571 Wallace Av 1571: remove existing office & restroom to accommodate 3 storage rooms; 1577: add 2 storage rooms, mep under seaparate permit. no facade changes under this permit. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Jun 7, 2024 | 736 Delano Av Comply with nov #202423957 repair front facade due to car damage. footing, put back steel column. replace 20 sq ft of stucco. replace garage door in kind. reconnect water pipe Complete | Legalize or fix a violation | Complete | Within 1 month | |
| Dec 11, 2023 | 1355 Fitzgerald Av Comply w/nov #202315191; remove as built grow rooms, remove as built kittchenette reconfigure restroom into ada compliance restroom no facade & structural work Complete | Legalize or fix a violation | Complete | 2 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Wen Chao Huang? Request a correction.