William Harrison Ogle
Architect · Ogle Design · Oakland
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-38778First issued Sep 8, 2020, expires Oct 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 19 permits since 2018, 19 in the last 5 years. Latest filed Oct 27, 2026.
- What kind of projects?
- Home remodel 7 · Addition 4 · Commercial or tenant improvement 3
- How long do their permits take?
- Home remodel: 4 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 7 permits in San Francisco
Time to get a permit
Median from filing to permit, from 5 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 4,701 permits.
Where
- Inner Richmond1
- Haight Ashbury1
- Presidio Heights1
- Outer Richmond1
Most recent
- 360 Lake St #2Unit #2: renovate condo: open up the kitchen by relocating it to the front and creating an open plan w/ the living room. addition renovation of the bathroom & office and the relocation of the master bedroom. no exterior work performedDec 3, 2024Complete
- 70 Piedmont StInterior remodel of living room, bedrooms, family area and garage area.Oct 2, 2024Filed
- 1407 Lyon St2/f: interior remodel of the primary unit in a 3 story building. additional work to include replacement of rear door, windows, and railing. replace front door in existing opening.Aug 5, 2024Complete
- 474 17th AvRemodel (e) bathroom & (e) garage renovation to include update finishes & millwork.Aug 17, 2022Cancelled
- 44 Dellbrook AvInterior remodel of lower level and partial upper level. select window upgrades. all new finishes.Mar 4, 2021Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 27, 2026 | 2675 Lombard St Interior remodel of primary unit (2nd story unit) to create a new primary bedroom, closet and bathroom and design. new living room, kitchen dinning room area. expand the upper story unit into rear yard, and re-build upper deck and stair into the back yard. Filed | Addition | Filed | — | |
| Aug 12, 2026 | 303 02nd St Ste - n115: ti project, renovation of (e) b occupancy space. no change in occupancy ref bpa: 201603182443 stamp new recive pages ibm Issued | Commercial or tenant improvementType unconfirmed | Issued | Within 1 month | |
| Jul 2, 2026 | 883 Mission St Tenant improvement converting (e) pizza shop to sandwich shop. ref bpa: 200810204619 Issued | Commercial or tenant improvementType unconfirmed | Issued | Within 1 month | |
| Dec 10, 2025 | 915 Bryant St New 8-story mixed use residential building wtih 14 units shared amenity and ground floor commercial space. approx 17,858 sqft. basement-level 3 type 1a and level 4-level 8 type 3a. Triage | New building | Triage | — | |
| Jun 20, 2025 | 1407 Lyon St #0 Exterior front stair and deck (remodel/replace in kind) within property line of residence. rail material change. stair and deck serve/impact only 1 unit. Issued | Deck, stairs or patio cover | Issued | 3 months | |
| Mar 17, 2025 | 1407 Lyon St 2/f: structural changes based on field conditions. minor revision to permit 202408057940. Complete | Revision or supplement | Complete | Within 1 month | |
| Dec 3, 2024 | 360 Lake St #2 Unit #2: renovate condo: open up the kitchen by relocating it to the front and creating an open plan w/ the living room. addition renovation of the bathroom & office and the relocation of the master bedroom. no exterior work performed Complete | Home remodel | Complete | 4 months | |
| Nov 6, 2024 | 1325 Filbert St Voluntary in-kind replacement of an (e) elevator & motor in a duplex bldg. elevator is interior and starts at ground flr level and serves only to upper duplex unit. Complete | Other | Complete | Within 1 month | |
| Oct 2, 2024 | 70 Piedmont St Interior remodel of living room, bedrooms, family area and garage area. Filed | Home remodel | Filed | — | |
| Aug 5, 2024 | 1407 Lyon St 2/f: interior remodel of the primary unit in a 3 story building. additional work to include replacement of rear door, windows, and railing. replace front door in existing opening. Complete | Home remodel | Complete | 2 months | |
| Jul 26, 2023 | 474 17th Av Add sauna to rear yard. add outdoor shower. add privacy screen Filed | Deck, stairs or patio cover | Filed | — | |
| Jul 26, 2023 | 310 Santa Ana Av Change rear door @ rearyard and adding window facing backyard. Filed | Other | Filed | — | |
| Aug 17, 2022 | 474 17th Av Remodel (e) bathroom & (e) garage renovation to include update finishes & millwork. Cancelled | Home remodel | Cancelled | — | |
| Feb 25, 2022 | 44 Dellbrook Av Revision to 202103045892: 2nd fl ceiling and layout changes to create a cathedral ceiling by extending the (e) pitched roof. Complete | Revision or supplement | Complete | 3 months | |
| Dec 17, 2021 | 455 Valencia St Tenant improvement for life style gym, personal service and arts, activities space. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Mar 4, 2021 | 44 Dellbrook Av Interior remodel of lower level and partial upper level. select window upgrades. all new finishes. Complete | Home remodel | Complete | 8 months | |
| Jan 29, 2021 | 38 Hearst Av Remodel lower level washer/dryer room and bedroom. add bathroom at lower level. remodel (e) upstair kitchen and bath. Complete | Home remodel | Complete | 8 months | |
| Dec 30, 2019 | 321 Dellbrook Av Rear single story horizontal addition to an existing 2 story single family residence. remodel lower level & provide deck on top of addition in location of (e) deck. Complete | Addition | Complete | 13 months | |
| Sep 6, 2018 | 1856 Mcallister St Renovate existing single dwelling residence layout to accommodate additional bathrooms while maintaining bedroom count. no change on exterior. swaping kitchen and living room location. Complete | Home remodel | Complete | Within 1 month | |
| Aug 20, 2018 | 244 Douglass St Work @ upper unit only. repair / replace / raise roof with 8 x 12 pitch & crate new floor layout on upper unit# 244. addition include 3 bathrooms & 1 bedroom, 1 office, 1 bar/entertainment, 1 living room. Issued | Addition | Issued | 45 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you William Harrison Ogle? Request a correction.