Adam Zdzislaw Murphy
Architect · Huntsman Ag · Walnut Creek
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-29238First issued Jan 9, 2003, expires Jan 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 127 permits since 2016, 127 in the last 5 years. Latest filed Oct 5, 2026.
- What kind of projects?
- Commercial or tenant improvement 112 · Other 6 · Deck, stairs or patio cover 3
- How long do their permits take?
- Commercial or tenant improvement: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 112 permits in San Francisco
Time to get a permit
Median from filing to permit, from 102 issued permits filed since 1966; 2 still in review. City is the San Francisco median for the same kind of review, from 24,896 permits.
Where
- Financial District/South Beach71
- Chinatown26
- Mission Bay10
- Bayview Hunters Point2
Most recent
- 4 Embarcadero Center19th fl - ti of (e) office (485 sq ft). demolition of 2 enclosed offices and construction of four small enclosed offices. includes partitions, lighting and finishesOct 5, 2026Filed
- 600 Montgomery St33rd floor: demolition of non-structural interior partition, ceilings and finishes of existing office. existing life safety including sprinkler piping and heads to remain intact & operational throught demolition. no change in occupancy, use, or area.Sep 29, 2026Issued
- 555 California St17th fl new non structural partitoins, glazing millwork, ceilings, lighting, electrical and finishesSep 9, 2026Issued
- 100 Montgomery St11th fl - ti of a full floor suite.Sep 4, 2026Filed
- 611 Front StT.i improvement 2nd floor.Aug 21, 2026Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 23, 2026 | 1725 03rd St 3/f: revision to permit 202608056076. construction of demising screen on outdoor terrace. Filed | Revision or supplement | Filed | — | |
| Oct 5, 2026 | 4 Embarcadero Center 19th fl - ti of (e) office (485 sq ft). demolition of 2 enclosed offices and construction of four small enclosed offices. includes partitions, lighting and finishes Filed | Commercial or tenant improvement | Filed | — | |
| Sep 29, 2026 | 600 Montgomery St 33rd floor: demolition of non-structural interior partition, ceilings and finishes of existing office. existing life safety including sprinkler piping and heads to remain intact & operational throught demolition. no change in occupancy, use, or area. Issued | Commercial or tenant improvement | Issued | 1 month | |
| Sep 9, 2026 | 555 California St 17th fl new non structural partitoins, glazing millwork, ceilings, lighting, electrical and finishes Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Sep 4, 2026 | 100 Montgomery St 11th fl - ti of a full floor suite. Filed | Commercial or tenant improvement | Filed | — | |
| Aug 21, 2026 | 611 Front St T.i improvement 2nd floor. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Aug 21, 2026 | 555 California St #0 45/f: demolition of non structural partitions, glazing, millwork, ceilings lighting, electrical, and finishes. ste to be demolished to "warm shell" condition for fture tenant buildout. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Aug 12, 2026 | 555 California St 17th fl tenant improvment for new demising wall to create 2 suites. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Aug 11, 2026 | 555 California St #0 Revision to pa # 202510157422 (23rd floor) - rating of (e) riser closet (addition of fire rated wall), mechanical scope change (change in duct routing) Issued | Revision or supplement | Issued | Within 1 month | |
| Aug 5, 2026 | 1725 03rd St Partial floor tenant improvement of the 3rd floor. Issued | Commercial or tenant improvement | Issued | 1 month | |
| Jul 15, 2026 | 300 Howard St Barrier removal. path of travel and exit access improvements in basement parking garage levels b1,b2, and b3. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jul 1, 2026 | 555 California St Revision to 202605221774 to include the removal of existing communicating stair between the 19th and 20th fl and infilling the restaurant 2fl opening Complete | Revision or supplement | Complete | Within 1 month | |
| Jun 29, 2026 | 505 Brannan St Selective tenant improvement demolition of non structural partitons and doors. new lighting and finishes for open office on the 4th and 5th fl m/e deferred. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| May 28, 2026 | 50 California St Unit# 3151: full floor tenant expansion into adjacent vacant space demo of non-load bearing partitions, finishes, ceiling, and lights, constrution of non-load bearing partitions, millwork, finishes, ceilings and lights. Issued | Commercial or tenant improvement | Issued | 2 months | |
| May 22, 2026 | 555 California St #0 19th & 20th foors: demolition of non-structrual partitions glazing, millwork, ceilings, lighting, electrical, and finishes. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| May 4, 2026 | 555 California St #0 38/fl- partial interior demo includes non structural , partitions, ceilings, lighting, finishes, doors, frames, hardware and milwork. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Apr 30, 2026 | 199 Fremont St #0 Level 1 and 2. revision to 202311291553. add draft curtains in alignment w/deferred sprinkler scope (detail #7). Complete | Revision or supplement | Complete | Within 1 month | |
| Apr 29, 2026 | 50 California St Construction of new roof terrace over (e) roof above 2/f. Issued | Deck, stairs or patio cover | Issued | 6 months | |
| Apr 29, 2026 | 50 California St 2/fl- ti to include non structrual demo and construction of (n) conference center,gym, and lounge. Issued | Commercial or tenant improvementType unconfirmed | Issued | 5 months | |
| Apr 8, 2026 | 555 California St #0 11th fl - demo of non-structural partitions, glazin, millwork, ceilings, lighting, electrical and finishes. abatement throughout and installation of general lighting throughout Issued | Commercial or tenant improvement | Issued | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Adam Zdzislaw Murphy? Request a correction.