Adriana Daringa
Architect · Adbc Architecture · Oakland
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-33174First issued Jul 18, 2011, expires May 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 12 permits since 2016, 12 in the last 5 years. Latest filed Nov 6, 2024.
- What kind of projects?
- Home remodel 3 · Commercial or tenant improvement 3 · Legalize or fix a violation 2
- How long do their permits take?
- Home remodel: 6 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 3 permits in San Francisco
Time to get a permit
Median from filing to permit, from 3 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 4,701 permits.
Where
- Potrero Hill1
- Glen Park1
- West of Twin Peaks1
Most recent
- 929 Rhode Island St2nd fl remodel: (n) windows & exterior doors, (n) wood siding. kitchen remodel scope limited to the rear side of the home. kitchen remodel.Nov 6, 2024Issued
- 324 Laidley StRemodel kitchen and master bathroom at 2nd fl. remove fireplace and chimney, replace interior stairs from 1st fl to 2nd fl. and to garage, new aluminm sliding glass at back patio on 1st fl. new moment frame at garageMar 9, 2020Complete
- 190 Juanita WyKitchen renovationMay 20, 2019Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Nov 6, 2024 | 929 Rhode Island St 2nd fl remodel: (n) windows & exterior doors, (n) wood siding. kitchen remodel scope limited to the rear side of the home. kitchen remodel. Issued | Home remodelType unconfirmed | Issued | 6 months | |
| Feb 5, 2021 | 335 A Hill St Erect new 1 story type-v, 1-unit residence (sfd) at rear of lot. Complete | New building | Complete | 23 months | |
| Feb 5, 2021 | 335 A Hill St Demo 1-story type v single family rear building. comply w/ bid #201997281 Complete | Other | Complete | 23 months | |
| Nov 21, 2020 | 335 Hill St Legalize demolition and reconstruction of previously existing structure in kind in the rear yard Withdrawn | Legalize or fix a violation | Withdrawn | — | |
| Oct 19, 2020 | 324 Laidley St Revision to pa #2020-0309-6503: replace existing windows at front elevation in kind, replace existing verrical panel siding with horizontal wood board siding. replace existing furnace. Complete | Revision or supplement | Complete | 1 month | |
| Mar 9, 2020 | 324 Laidley St Remodel kitchen and master bathroom at 2nd fl. remove fireplace and chimney, replace interior stairs from 1st fl to 2nd fl. and to garage, new aluminm sliding glass at back patio on 1st fl. new moment frame at garage Complete | Home remodelType unconfirmed | Complete | 7 months | |
| Feb 11, 2020 | 324 Laidley St Replace (e) single car garage door with two car garage door. Complete | Other | Complete | 8 months | |
| May 20, 2019 | 190 Juanita Wy Kitchen renovation Complete | Home remodel | Complete | 1 month | |
| Mar 12, 2018 | 10 United Nations Pz 1/f: demolish interior walls, ceiling grid & finished ceiling, (e) structure to remain. per ab-017. maher na Complete | Commercial or tenant improvement | Complete | 2 months | |
| Jan 24, 2018 | 50 Green St Mechanical platform repair above roof: replace wood platform for hvac equipment on roof to match extg. m.e.p. under separate permit. n/a for maher Complete | Deck, stairs or patio coverType unconfirmed | Complete | Within 1 month | |
| Aug 21, 2017 | 335 A Hill St Unit legalization per ordinance 43-14 Cancelled | Legalize or fix a violation | Cancelled | 10 months | |
| Jun 27, 2017 | 580 California St 11th floor - enclose open office area to make new conference room. demolish existing walls to create two new offices. mep, life safety under separate permit. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jul 15, 2016 | 425 California St #0 21st floor - remove (e) partition, new folding partition (e) conference room. convert (e) conference into two offices. open (e) conference room to main office. mechanical, plumbing, life safety and sprinkler under separate permit. Complete | Commercial or tenant improvement | Complete | 2 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Adriana Daringa? Request a correction.