CheckMyDesigner

Andrew Joseph Carpentier

Architect · Yhla Architects · Oakland

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeArchitect C-17255First issued Jun 19, 1986, expires Apr 30, 2027.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the California Architects Board enforcement list on Nov 5, 2026.

Worked in San Francisco?
13 permits since 2007, 13 in the last 5 years. Latest filed Jun 18, 2024.
What kind of projects?
Commercial or tenant improvement 13
How long do their permits take?
Commercial or tenant improvement: within 1 month. City typical for the same review: within 1 month.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Commercial or tenant improvement: 13 permits in San Francisco

From 2007 to 2024, latest filed Jun 18, 2024.

Time to get a permit

Theirs
Within 1 month
City
Within 1 month

Median from filing to permit, from 13 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 10,640 permits.

Where

  • Financial District/South Beach9
  • Tenderloin2
  • Marina1
  • Castro/Upper Market1
Permits
15 permits that name Andrew Joseph Carpentier, newest first, including 2 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Dec 1, 20253318 Steiner St

Revision to permit 202310047992. relocation of main meter to same wall but closer to main door. relocate sub-panels to wall on kitchen area.

Issued
Jun 18, 20243318 Steiner St

Cold shell building for future restaurant build-out: facade renovation including moment frame, new restroom, new roof and skylight, seismic upgrade, new floor slab, new electrical service, new plumbing service. deferred electrical & mep permits.

Issued
Jan 17, 2023111 Powell St

Temporary retail pop up store inside existing vacant retail store. temporary wall panels supported by structural engineer design. temporary flooring at entry area, (e) flooring to remain. temp power for monitors and displays. pop up to open 1/25/2023 and run through 2/28/2023 then close and strike.

Complete
Sep 21, 2022111 Powell St

Temporary retail pop up store inside (e) vacant retail store. temporary wall panels supported by structural engineer design. temporary flooring @ entry area, (e) flooring to remain. temporary power for monitors and displays. pop up to open 10/7/22 to 10/28/22 then

Complete
Jun 27, 201775 01st St

G/f -addition of a new single user restroom. deffered meps, f/a & f/s. ref demo pa#201706018160 & pa#201706028221

Complete
Jun 1, 201775 01st St

Project consists of interior demo

Complete
Oct 13, 201650 Fremont St

22nd flr: non structural ti demo suites 2200/2225 to create suite 2200 & 2260 (~3000 sq ft) including full height & ceiling height partitions, ceiling systems, lighting, millwork and finishes. mep and fire under separate permit maher na

Complete
Jun 12, 20141 Post St #0

32/f- change a storage room into 2 private office. 33/f- divide a large office into 2 private offices.

Cancelled
Apr 1, 20141 Post St #0

#2200- minor tenant improvements & finishes, new rated compartment wall. mechanical and electrical under separate permit.

Complete
Mar 3, 20141 Post St

Ground floor:replace extg lobby turnstiles(security) at ground floor and lower level with new security turnstiles.

Complete
Sep 30, 20131 Post St #0

4th floor suite 475 - non structural tenant improvement including partition framing, drywall, electrical outlets, painting & door relocations.

Issued
Aug 12, 20131 Post St #0

22nd floor minor non-structural t.i. including new-tenant entry doors, rated full height partitions, new finishes (paint only) elevator vestibule door & two conference room doors & side lites.

Complete
May 30, 20131 Post St #0

10th floor-minor non structural t.i including rated floor compartment walls, ceiling height partitons, new t bar ceiling, light fixtures, sinks, millwork, electrical & data wiring & new finishes to create 4 spec office suites

Complete
Dec 2, 2008100 Church St

Work @ # 100 church street only. modify an (e) ground floor retail space to incorporate (n) pharmacy & healthcare clinic, (n) unisex restrm, (n) ceiling system & lighting, (n) ramp, (n) ceiling height partitions, electrical & mechanical modifications & finishes.

Complete
Mar 29, 20071 Post St #0

Oti-1, crocker plaza co, 3rd floor, el, me, ls, sp.

Complete

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Andrew Joseph Carpentier? Request a correction.