Avetik Eloyan
Architect · Eloyan Architect · Lafayette
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-36084First issued Nov 8, 2016, expires Apr 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 18 permits since 2012, 18 in the last 5 years. Latest filed Oct 17, 2026.
- What kind of projects?
- Home remodel 9 · Legalize or fix a violation 3 · ADU 2
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 9 permits in San Francisco
Time to get a permit
Median from filing to permit, from 7 issued permits filed since 1966; 2 still in review. City is the San Francisco median for the same kind of review, from 5,178 permits.
Where
- Sunset/Parkside3
- Marina2
- Castro/Upper Market2
- Presidio Heights1
Most recent
- 2859 Octavia StUnit #4: remove non structural wall. relocate the kitchen. no structural changes. no change to use or parking. bathroom remodel & add new 1/2 bath (n) closets in bedroomsJun 17, 2025Issued
- 3864 California StUnit #5: remove non structural wall. relocate the kitchen. no structural changes. no change to use or parkingJun 17, 2025Issued
- 2209 15th StRemoval of enclosed walls. in kind restoration and repair of rear deckApr 1, 2024Filed
- 2209 15th StRemodel for unit 2209 & 2211. no added area or structural changes. unit 2209: relocation of washer and dryer into a new laundry closet, new half bathroom & relocation of kitchen. unit 2211: relocation of washer and dryer into a new laundry closet. add new half bathroomMar 11, 2024Filed
- 3560 Divisadero St #0G/f: renovation with new laundry room addition to (e) storage and laundry hookup installation in the storage space. no structural changes.Nov 15, 2021Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 17, 2026 | 2209 15th St Basement: convert (e) storage/workshop on basement lievel into a 993sf unit with bedrooms, bathrooms, living room and kitchen. no stutural or exterior work. Filed | ADU | Filed | — | |
| Aug 31, 2026 | 1747 32nd Av New second floor deck and stair addition at the rear yard of the property. Issued | Deck, stairs or patio cover | Issued | 1 month | |
| Oct 15, 2025 | 323 Staples Av Legalization of adu. 2-story horizontal addition. remodel of both 1st & 2nd floors including removal of unauthorized storage at rear of building. Issued | ADU | Issued | 7 months | |
| Jun 17, 2025 | 2859 Octavia St Unit #4: remove non structural wall. relocate the kitchen. no structural changes. no change to use or parking. bathroom remodel & add new 1/2 bath (n) closets in bedrooms Issued | Home remodel | Issued | Within 1 month | |
| Jun 17, 2025 | 3864 California St Unit #5: remove non structural wall. relocate the kitchen. no structural changes. no change to use or parking Issued | Home remodel | Issued | Within 1 month | |
| Apr 1, 2025 | 71 Manor Dr Revision to pa# 202410213358. interior remodel of basement and 1/f story. add new bathroom and 1 bedroom at 1/f Complete | Revision or supplement | Complete | Within 1 month | |
| Apr 1, 2024 | 2209 15th St Removal of enclosed walls. in kind restoration and repair of rear deck Filed | Home remodelType unconfirmed | Filed | — | |
| Mar 11, 2024 | 2209 15th St Remodel for unit 2209 & 2211. no added area or structural changes. unit 2209: relocation of washer and dryer into a new laundry closet, new half bathroom & relocation of kitchen. unit 2211: relocation of washer and dryer into a new laundry closet. add new half bathroom Filed | Home remodel | Filed | — | |
| Nov 15, 2021 | 3560 Divisadero St #0 G/f: renovation with new laundry room addition to (e) storage and laundry hookup installation in the storage space. no structural changes. Complete | Home remodel | Complete | Within 1 month | |
| Oct 22, 2021 | 3242 Taraval St Kitchen and bathroom renovation. provide electric and plumbing line. no structure work. Complete | Home remodel | Complete | Within 1 month | |
| Oct 21, 2021 | 3246 Taraval St Kitchen and bathroom renovation. no architecture work. office is part of the unit. Complete | Home remodel | Complete | Within 1 month | |
| Oct 20, 2021 | 1649 La Salle Av To comply with nov 202174149 including fire damage, repair roof, walls, floor, ceilings. replace windows/doors, new kitchen and bathroom appliances. renovation work. Complete | Legalize or fix a violation | Complete | 3 months | |
| Oct 20, 2021 | 3254 Taraval St Kitchen and bath renovation. provide electric and plumbing line. no structural work. new furnace and laundry. Complete | Home remodel | Complete | Within 1 month | |
| Jul 27, 2021 | 1395 Union St Unit 1: convert part of corridor to closet. changing closet walls and existing doors. Complete | Home remodel | Complete | 2 months | |
| Jan 27, 2021 | 345 07th St Tenant improvement with occupancy change from a3 to a2 banquet hall. new wet bar. new flooring. a2 is for banquet hall on ground floor in a3 church. no change of use. Complete | Commercial or tenant improvementType unconfirmed | Complete | 9 months | |
| Jul 11, 2018 | 299 Fremont St Arch/mech/plumbing ti project with 2 new toilets, 3 showers. reception area and gym. new heating and ventilation systems. no new fsd's n/a for maher Complete | Commercial or tenant improvementType unconfirmed | Complete | 4 months | |
| Apr 14, 2017 | 2488 Geary Bl To comply nov#201755611, legalize existing 908 sq.ft. 3rd unit at basement level of 2 story building. Filed | Legalize or fix a violation | Filed | — | |
| Nov 27, 2013 | 306 Madison St Interior remodel with 132 sq ft addition. 2nd bathroom addition. Cancelled | Addition | Cancelled | — | |
| Aug 20, 2012 | 412 Marietta Dr To compy with nov #201249421. extension of an existing bathroom in a ground level of a two story reisdential bldg. all work is within building envelope. high efficacy bathroom lighting. Complete | Legalize or fix a violation | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Avetik Eloyan? Request a correction.