CheckMyDesigner

Avetik Eloyan

Architect · Eloyan Architect · Lafayette

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeArchitect C-36084First issued Nov 8, 2016, expires Apr 30, 2027.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the California Architects Board enforcement list on Nov 5, 2026.

Worked in San Francisco?
18 permits since 2012, 18 in the last 5 years. Latest filed Oct 17, 2026.
What kind of projects?
Home remodel 9 · Legalize or fix a violation 3 · ADU 2
How long do their permits take?
Home remodel: within 1 month. City typical for the same review: within 1 month.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Permits
19 permits that name Avetik Eloyan, newest first, including 1 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Oct 17, 20262209 15th St

Basement: convert (e) storage/workshop on basement lievel into a 993sf unit with bedrooms, bathrooms, living room and kitchen. no stutural or exterior work.

Filed
Aug 31, 20261747 32nd Av

New second floor deck and stair addition at the rear yard of the property.

Issued
Oct 15, 2025323 Staples Av

Legalization of adu. 2-story horizontal addition. remodel of both 1st & 2nd floors including removal of unauthorized storage at rear of building.

Issued
Jun 17, 20252859 Octavia St

Unit #4: remove non structural wall. relocate the kitchen. no structural changes. no change to use or parking. bathroom remodel & add new 1/2 bath (n) closets in bedrooms

Issued
Jun 17, 20253864 California St

Unit #5: remove non structural wall. relocate the kitchen. no structural changes. no change to use or parking

Issued
Apr 1, 202571 Manor Dr

Revision to pa# 202410213358. interior remodel of basement and 1/f story. add new bathroom and 1 bedroom at 1/f

Complete
Apr 1, 20242209 15th St

Removal of enclosed walls. in kind restoration and repair of rear deck

Filed
Mar 11, 20242209 15th St

Remodel for unit 2209 & 2211. no added area or structural changes. unit 2209: relocation of washer and dryer into a new laundry closet, new half bathroom & relocation of kitchen. unit 2211: relocation of washer and dryer into a new laundry closet. add new half bathroom

Filed
Nov 15, 20213560 Divisadero St #0

G/f: renovation with new laundry room addition to (e) storage and laundry hookup installation in the storage space. no structural changes.

Complete
Oct 22, 20213242 Taraval St

Kitchen and bathroom renovation. provide electric and plumbing line. no structure work.

Complete
Oct 21, 20213246 Taraval St

Kitchen and bathroom renovation. no architecture work. office is part of the unit.

Complete
Oct 20, 20211649 La Salle Av

To comply with nov 202174149 including fire damage, repair roof, walls, floor, ceilings. replace windows/doors, new kitchen and bathroom appliances. renovation work.

Complete
Oct 20, 20213254 Taraval St

Kitchen and bath renovation. provide electric and plumbing line. no structural work. new furnace and laundry.

Complete
Jul 27, 20211395 Union St

Unit 1: convert part of corridor to closet. changing closet walls and existing doors.

Complete
Jan 27, 2021345 07th St

Tenant improvement with occupancy change from a3 to a2 banquet hall. new wet bar. new flooring. a2 is for banquet hall on ground floor in a3 church. no change of use.

Complete
Jul 11, 2018299 Fremont St

Arch/mech/plumbing ti project with 2 new toilets, 3 showers. reception area and gym. new heating and ventilation systems. no new fsd's n/a for maher

Complete
Apr 14, 20172488 Geary Bl

To comply nov#201755611, legalize existing 908 sq.ft. 3rd unit at basement level of 2 story building.

Filed
Nov 27, 2013306 Madison St

Interior remodel with 132 sq ft addition. 2nd bathroom addition.

Cancelled
Aug 20, 2012412 Marietta Dr

To compy with nov #201249421. extension of an existing bathroom in a ground level of a two story reisdential bldg. all work is within building envelope. high efficacy bathroom lighting.

Complete

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Avetik Eloyan? Request a correction.