Cassandra Mettling-Davis
Architect · Cassandra Mettling Davis · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-24981First issued Apr 12, 1994, expires Dec 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 140 permits since 2004, 140 in the last 5 years. Latest filed Oct 30, 2026.
- What kind of projects?
- Home remodel 61 · Addition 38 · Deck, stairs or patio cover 17
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 61 permits in San Francisco
Time to get a permit
Median from filing to permit, from 60 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 23,779 permits.
Where
- West of Twin Peaks28
- Sunset/Parkside5
- Mission4
- Inner Sunset3
Most recent
- 2765 Greenwich StRemodel kitchen and 3rd floor bathrooms. add powder room at 1/f. remove wall between kitchen and breakfast room.Oct 2, 2026Issued
- 207 Juanita Wy1st fl: reconfigure layout of ground fl rooms, excavate for 7'6 min clg height, connect portion of utility area, crawl space and garage to conditioned space (134 sf total) 2nd fl: new interior stairsAug 28, 2026Issued
- 75 San Jacinto WyInterior remodel including kitchen remodel, 3 bathroom remodels, 1 new bathroom, interior stair replacement, replace windows through out. windows that can be seen from the street are being replaced in- kind with new wood windows to match existing insulate all exterior wallsMay 27, 2026Issued
- 126 Wawona St1st flr interior - no work. 2nd floor interior - remodel hall bath in-kind; extend pr bath into adjacent closet & remodel. exterior - replace exterior front entry stairs in-kind.May 22, 2026Issued
- 1670 11th AvRemodel ground floor for new media room, office, bathroom, laundry and storage.May 21, 2026Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 30, 2026 | 457 Hill St New rear yard deck at 2nd & 1st floors. new door & window openings at rear facade; new moment frame at 1st floor. Triage | Deck, stairs or patio coverType unconfirmed | Triage | — | |
| Oct 2, 2026 | 2765 Greenwich St Replace windows at front and rear facades. new sliding glass doors at 1st and 2nd floors. new garage door in (e) opening. replace roof shingles with standing seam metal roof. Issued | Other | Issued | Within 1 month | |
| Oct 2, 2026 | 2765 Greenwich St Remodel kitchen and 3rd floor bathrooms. add powder room at 1/f. remove wall between kitchen and breakfast room. Issued | Home remodel | Issued | Within 1 month | |
| Aug 28, 2026 | 207 Juanita Wy 1st fl: reconfigure layout of ground fl rooms, excavate for 7'6 min clg height, connect portion of utility area, crawl space and garage to conditioned space (134 sf total) 2nd fl: new interior stairs Issued | Home remodel | Issued | Within 1 month | |
| Aug 28, 2026 | 207 Juanita Wy New exterior windows - north elev - replace w/n (e) openings w/ fiberglass windows. south elev: relocation of two windows, replace door w/ window & one new window. Issued | Other | Issued | Within 1 month | |
| May 27, 2026 | 75 San Jacinto Wy Interior remodel including kitchen remodel, 3 bathroom remodels, 1 new bathroom, interior stair replacement, replace windows through out. windows that can be seen from the street are being replaced in- kind with new wood windows to match existing insulate all exterior walls Issued | Home remodel | Issued | Within 1 month | |
| May 22, 2026 | 126 Wawona St 1st flr interior - no work. 2nd floor interior - remodel hall bath in-kind; extend pr bath into adjacent closet & remodel. exterior - replace exterior front entry stairs in-kind. Issued | Home remodel | Issued | Within 1 month | |
| May 21, 2026 | 1670 11th Av Remodel ground floor for new media room, office, bathroom, laundry and storage. Issued | Home remodel | Issued | Within 1 month | |
| Jan 29, 2026 | 2467 35th Av Add 2nd fl deck & stair to grade. remove (e) stair & infill corner of bldg on both floors. at 1st floor relocate bathroom & add powder room; add mudroom w/kitchenette; (e) bedroom to be enlarged & family room to remain. ref pa 9405612 for ground floor (e) conditions; at 2nd floor remodel & enlarge Issued | Revision or supplementType unconfirmed | Issued | Within 1 month | |
| Dec 16, 2025 | 581 Belvedere St 1st floor / basement:convert (e)rooms to adu per state adu program (gov't code 66323): adu sq. ft. if 656 total (180 of that is new); new 37 sq. ft. deck at rear yard for ladder pathway.1st flr voluntary lateral strengthening. no work on 2nd & 3rd floors (e)building not sprinklered & does not have a Issued | ADU | Issued | 3 months | |
| Dec 10, 2025 | 163 Marietta Dr Revision to 202507080306: deck stair changes position, 1st/f deck decreased in size, storage fl deck increases in size, firewall switches to opposite side, add powder room, space conditioning & new window to storage/f. no increase in floor area, replace central bearing wall w/ new beam, ssd. Issued | Revision or supplement | Issued | Within 1 month | |
| Oct 30, 2025 | 723 41st Av Revision to 202504033617. at 2nd flr bedroom #1, replace (e) door w/new window. remove (e) stair landing. Complete | Revision or supplement | Complete | Within 1 month | |
| Oct 23, 2025 | 806 Noe St Horizontal infill addition - convert recessed porch into habitable space (n) exterior spiral stair to grade. 1st flr- as required to bring down structural loads. 2nd flr - convert porch to habitable; remove wall btwn kitchen and dining. 3rd flr no work. Complete | Addition | Complete | Within 1 month | |
| Sep 25, 2025 | 581 Belvedere St 1st floor/basemt: convert (e) rooms to adu per state adu; adu sq ft is 656 total (180 of that is new); new 37 sf deck @ rear yard for ladder pathway; voluntary lateral strengthening. (e) building is not sprinklered & does not have a manual fire alarm system. building will remain unsprinklered. Cancelled | ADU | Cancelled | — | |
| Jul 30, 2025 | 990 Rhode Island St Horizontal addition at rear yard within 1 story 12' pop out area Complete | Addition | Complete | 1 month | |
| Jul 16, 2025 | 163 Marietta Dr Expand 1/f into garage leaving compact parking space. add intermediate floor for storage into crawlspace, new first floor deck with stair to grade. new grade level deck. add new skylight and raised parapet. Issued | Addition | Issued | 3 months | |
| Jun 26, 2025 | 72 Burlwood Dr Kitchen remodel, open wall to dining room, relocate powder room to garage Complete | Home remodel | Complete | Within 1 month | |
| May 30, 2025 | 730 42nd Av Revision to pa#202011239558: change to north foundation (e) foundation to remain with new foundation added inside of it. shoring plans added. Issued | Revision or supplement | Issued | Within 1 month | |
| May 1, 2025 | 2630 25th Av 2nd fl: horizontal addition to enlarge (e) bedroom, add (n) bathroom at interior, (n) deck at the rear. 1st fl: no work except 1 hr wall & deck posts Complete | Addition | Complete | Within 1 month | |
| Apr 24, 2025 | 225 Teresita Bl Basement level - primary bath & laundry room addition. 1st fl - no work; 2nd fl - no work Complete | AdditionType unconfirmed | Complete | 3 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Cassandra Mettling-Davis? Request a correction.