Christopher Alexandre Duncan
Architect · Gelfand Partners · Berkeley
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-23282First issued Apr 29, 1992, expires Oct 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 7 permits since 2015, 7 in the last 5 years. Latest filed Mar 31, 2022.
- What kind of projects?
- Commercial or tenant improvement 3 · Home remodel 2 · Seismic retrofit or foundation 2
- How long do their permits take?
- Commercial or tenant improvement: 5 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 3 permits in San Francisco
Time to get a permit
Median from filing to permit, from 2 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 5,514 permits.
Where
- Chinatown1
- Russian Hill1
- Tenderloin1
Most recent
- 777 Stockton StSuite 201, front building: 777 stockton street: barrier removal incl. removing doors and lowering lavatories. retile for flush thresholds.Mar 31, 2022Complete
- 1535 Jackson St #0Mayor ed# 13-01. construction of 11 affordable sleeping units at 1st floor. general renovation of (e) residential group housing on 2nd & 3rd floor. **maher n/a**Sep 24, 2019Complete
- 701 Post StComply with be ordinance 51-16. barrier removal (step at main entrance) remove exterior vestibule doors, reverse swing interior vestibule doors gelfand partners plans 4/5/19 a1.0, a2.0, a2.2 structur inc s2-1, s2-2, s2-3 (note minor sidewalk wor reqd)May 16, 2019Cancelled
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Dec 22, 2022 | 216 Eddy St As built electrical for administrative permit 202008061226 Complete | Revision or supplement | Complete | Within 1 month | |
| Nov 16, 2022 | 216 Eddy St Revision to permit 202208190923 and 202008061226 for mobility unit and communication matrix to reflect as-built conditions. add room numbers (where missing) on basement and g/f plans per mod request. Complete | Revision or supplement | Complete | 1 month | |
| Aug 19, 2022 | 216 Eddy St Minor revision to permit 202112084018 to reflect changes to bathrooms at mobility unit #205, smoke detectors, sidewalk. Complete | Revision or supplement | Complete | 2 months | |
| Jul 21, 2022 | 777 Stockton St Unit 201: revision to permit pa#202203311341 . changing bathroom sinks. Complete | Revision or supplement | Complete | Within 1 month | |
| Mar 31, 2022 | 777 Stockton St Suite 201, front building: 777 stockton street: barrier removal incl. removing doors and lowering lavatories. retile for flush thresholds. Complete | Commercial or tenant improvement | Complete | 1 month | |
| Feb 3, 2022 | 2200 Van Ness Av Revision to permit #202001303133. provide window in extg window opening. provide handrails at extg entrance. Complete | Revision or supplement | Complete | Within 1 month | |
| Dec 8, 2021 | 216 Eddy St Revisions to pa #202008061226 & 202109077832: changes to the trash/laundry rooms/elevator vestibule layout in basement & service offices on the g/f. wheel chair lift omitted as no longer needed; inclusion of stair shop drawings for stair 00 previously deferred; g/f (e) steel beams along Complete | Revision or supplement | Complete | 4 months | |
| Apr 15, 2021 | 2200 Van Ness Av Revision to pa 202001303133. revise opening to accessible alcove, moving interior walls, changing concrete strength. ground floor office is accessory to ccdc housing. Complete | Revision or supplement | Complete | Within 1 month | |
| Oct 13, 2020 | 75 Dore St Priority processing. general alterations including accessible apartment upgrades, cabinetry, some fixtures & fittings, new heating at common area, some altered power & lighting. code / life safety upgrades and maintenance replacements. Filed | Home remodel | Filed | — | |
| Aug 6, 2020 | 216 Eddy St General renovation of existing residential group housing and voluntary seismic upgrade. Complete | Seismic retrofit or foundationType unconfirmed | Complete | 13 months | |
| Oct 17, 2019 | 701 Post St 2/f:rev. pa#201805179396; enlarge access door/opening to ada restrooms. removing 1 wall at stair. providing 3 hour rated fire/smoke curtain with egress opening, providing new flooring in the storage room and finishes in lobby. Issued | Revision or supplement | Issued | 2 months | |
| Sep 24, 2019 | 1535 Jackson St #0 Mayor ed# 13-01. construction of 11 affordable sleeping units at 1st floor. general renovation of (e) residential group housing on 2nd & 3rd floor. **maher n/a** Complete | Commercial or tenant improvement | Complete | 9 months | |
| May 16, 2019 | 701 Post St Comply with be ordinance 51-16. barrier removal (step at main entrance) remove exterior vestibule doors, reverse swing interior vestibule doors gelfand partners plans 4/5/19 a1.0, a2.0, a2.2 structur inc s2-1, s2-2, s2-3 (note minor sidewalk wor reqd) Cancelled | Commercial or tenant improvement | Cancelled | — | |
| Mar 15, 2019 | 320 Clementina St #0 Rev to pa# 201510301361; delete the previously approved trash compactor enclosure and continue to use the existing trash rooms. install two new trash compactors in the existing trash rooms. Complete | Revision or supplement | Complete | Within 1 month | |
| May 3, 2017 | 320 Clementina St #0 Revision to 201510301361 to revise typical unit balcony door threshold detail Issued | Revision or supplement | Issued | Within 1 month | |
| Dec 19, 2016 | 701 Post St Restore basement retaining wall & stair structure drawing s2.1, s2.2 seismic upgrade work repairs - basement levels, not visible Issued | Seismic retrofit or foundationType unconfirmed | Issued | 3 months | |
| Oct 30, 2015 | 320 Clementina St #0 Moh rad priority project. clementina tower are identical concrete buildings with 13 floors of seior and disable housing, scope of work includes structural, life safety and accessibility upgrades and general renovations. Complete | Home remodelType unconfirmed | Complete | 9 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Christopher Alexandre Duncan? Request a correction.