Christopher James Sullivan
Architect · Chris Sullivan · Berkeley
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-30234First issued Jul 1, 2005, expires Jul 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 166 permits since 2007, 166 in the last 5 years. Latest filed Oct 19, 2026.
- What kind of projects?
- Home remodel 79 · Commercial or tenant improvement 52 · Legalize or fix a violation 12
- How long do their permits take?
- Home remodel: 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 79 permits in San Francisco
Time to get a permit
Median from filing to permit, from 77 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 14,583 permits.
Where
- Nob Hill30
- Hayes Valley15
- Tenderloin10
- Noe Valley5
Most recent
- 1240 V Diamond StRemodeling of (e) primary bathroom.Nov 18, 2025Complete
- 1466 44th AvRenovation of ground level/garge to include (n) bedrm, bath, laundry and storage areas; structural work include new partial floor slab and new posts; new lighting mechanical work under separate permitApr 30, 2025Complete
- 2341 Vallejo St #0Residential renovation renovate (e) top fl bathroom, add new top fl. bathroom renovate (e) closet, new lighting, new structural work at closet, no exterior changesOct 16, 2024Complete
- 1710 Castro StRenovate kitchen-new cabinets, new lighting, remove post & wall in kitchen, replace with beams, bathroom-new tile, remove bath door.Jul 10, 2023Complete
- 2217 Fillmore StApt 2: apt renovation - renovate kitchen, 2 bathrooms, structural work, replace 1 (e) lightwell window, new lighting, no exterior changes. no changes to mech. window not visible from streetMar 23, 2023Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 19, 2026 | 3844 19th St Construction of new rear 2nd fl deck, including new lighting, revised 1st fl deck, planning approval 2024-003904prj Filed | Deck, stairs or patio cover | Filed | — | |
| Aug 31, 2026 | 3620 Balboa St To comply with nov# 202547558. commercial: fire damage repair in kind, new electrical service. residential: new egress stairs, new kitchenette, new bathroom, new lighting. Filed | Legalize or fix a violation | Filed | — | |
| Mar 24, 2026 | 888 Fell St Install (n) deck at rear at 2nd level condo, replace (e) window with door. approved under variance# 2022-002640var. Filed | Deck, stairs or patio cover | Filed | — | |
| Nov 18, 2025 | 1240 V Diamond St Remodeling of (e) primary bathroom. Complete | Home remodel | Complete | Within 1 month | |
| Oct 22, 2025 | 217 Montgomery St Ebiko sushi- 217 montgomery st, small take out food establishment, tenant improvement, new fixtures, finshes, equipment, lighting, plimbing and electrical work. no exterior changes. Complete | Commercial or tenant improvementType unconfirmed | Complete | 4 months | |
| Sep 8, 2025 | 3632 26th St #0 Legalize (e) 2 story single unit adu in the rear of property. Cancelled | Legalize or fix a violationType unconfirmed | Cancelled | — | |
| Apr 30, 2025 | 1466 44th Av Renovation of ground level/garge to include (n) bedrm, bath, laundry and storage areas; structural work include new partial floor slab and new posts; new lighting mechanical work under separate permit Complete | Home remodelType unconfirmed | Complete | 1 month | |
| Nov 5, 2024 | 2937 24th St Renovation of (e) bakery/limited restaurant and new equipment, lighting, hvac plumving, electrical finishes, accessible lift and accessible restroom. no exterior changes. not a change of use. Complete | Commercial or tenant improvement | Complete | 7 months | |
| Oct 16, 2024 | 2341 Vallejo St #0 Residential renovation renovate (e) top fl bathroom, add new top fl. bathroom renovate (e) closet, new lighting, new structural work at closet, no exterior changes Complete | Home remodel | Complete | 1 month | |
| Oct 16, 2024 | 1775 A Silver Av Revision to permit#: 202010227165 - revise bathroom new water heater, revise heating unit. no exterior changes. Complete | Revision or supplement | Complete | Within 1 month | |
| Jun 10, 2024 | 1775 A Silver Av Ref to pa: 202010227165: add 2 footings to ground floor. Complete | Revision or supplement | Complete | Within 1 month | |
| Mar 26, 2024 | 14 Parsons St Replace (e) garage door with new wider garage door, including structural work. Complete | OtherType unconfirmed | Complete | 5 months | |
| Mar 20, 2024 | 100 01st St Restaurant tenant improvement. take out restaurant includes new prep & dishwashing, new electrical and plumbing, mechanical systems, finishes & equipment. no exterior changes Complete | Commercial or tenant improvement | Complete | 3 months | |
| Dec 5, 2023 | 2217 Fillmore St Apt 2 on 3/f: revision to pa# 202303234309. renovate kitchen, relocate bathroom and laundry, relocate bedroom. new finishes and fixtures. no exterior changes, hvac work deferred submittal. non structural work. Complete | Revision or supplement | Complete | 3 months | |
| Sep 26, 2023 | 374 Golden Gate Av Ground fl retail. new exterior storefront and accessible entrance per abe# 2023092228707. no work for tenant interior Complete | Commercial or tenant improvementType unconfirmed | Complete | Within 1 month | |
| Jul 10, 2023 | 1710 Castro St Renovate kitchen-new cabinets, new lighting, remove post & wall in kitchen, replace with beams, bathroom-new tile, remove bath door. Complete | Home remodel | Complete | Within 1 month | |
| Apr 5, 2023 | 1906 Market St E restaurant on gr fl change out equipment. revise front service counter Complete | Commercial or tenant improvement | Complete | 2 months | |
| Mar 31, 2023 | 65 Heather Av #0 To comply with nov 202301641 legalize home office on ground floor. verify existing partitions, new lighting, removal of 1 sink; closure of existing drain and addition of wall heater in (n) home office. 3-5-24- replace window in kind in office room Complete | Legalize or fix a violation | Complete | 14 months | |
| Mar 23, 2023 | 2217 Fillmore St Apt 2: apt renovation - renovate kitchen, 2 bathrooms, structural work, replace 1 (e) lightwell window, new lighting, no exterior changes. no changes to mech. window not visible from street Complete | Home remodel | Complete | 9 months | |
| Mar 14, 2023 | 839 Geary St #0 G/f: retail storefront replacement including new accessible entrance to match (e) opposite entrance. to comply with accessible business entrance program ord 51-16. ref abe 202303096262 Complete | OtherType unconfirmed | Complete | 4 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Christopher James Sullivan? Request a correction.