Christopher Lane Wilhite
Engineer · Engineered Soil Repairs · Vacaville
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeCivil Engineer C-63465First issued Jun 14, 2002, expires Sep 30, 2028.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 10 permits since 2005, 10 in the last 5 years. Latest filed May 12, 2025.
- What kind of projects?
- Retaining wall or site work 7 · Home remodel 2 · Seismic retrofit or foundation 1
- How long do their permits take?
- Retaining wall or site work: 3 months. City typical for the same review: 5 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Retaining wall or site work: 7 permits in San Francisco
Time to get a permit
Median from filing to permit, from 7 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 6,156 permits.
Where
- Glen Park3
- Russian Hill2
- Lone Mountain/USF1
- Marina1
Most recent
- 2430 Leavenworth StRetaining wall stabilization on property line with 2420 leavenworth street includes tiebacks & deadman piers.May 12, 2025Complete
- 2420 Leavenworth StRetaining wall stablization and drainage improvements. repair foundation cracksMay 12, 2025Complete
- 85 Ora WyReplace (e) wood retaining wall in common area with stoacked block wall with subdrain. height and length to match (e) wall near building 85 and units 101, 103, 105.Mar 18, 2022Complete
- 43 Ora WyRemove (e) railroad tie retaining wall and replace with a new solider pile and wood lagging retaining wall with a subdrain. approx 48lf at 2' and 5' ht range.same alignment as existing. work is in hoa common area adj to 80 ora way.Nov 16, 2020Complete
- 95 Ora WyInstall subdrain along the east perimeter wall of the north stairwell. install a new sump pump with electrical with automatic pump. collected water will be pumped to landscaped area near garage. remove and replace section of keystone and slab around garage vent as necessary to install subdrainJun 28, 2018Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 9, 2026 | 232 Fillmore St Revision to 202607104844: underpin south permeter building foundation and partial garage slab replacement. Issued | Revision or supplement | Issued | Within 1 month | |
| May 12, 2025 | 2430 Leavenworth St Retaining wall stabilization on property line with 2420 leavenworth street includes tiebacks & deadman piers. Complete | Retaining wall or site work | Complete | 3 months | |
| May 12, 2025 | 2420 Leavenworth St Retaining wall stablization and drainage improvements. repair foundation cracks Complete | Retaining wall or site work | Complete | 3 months | |
| Jul 12, 2024 | 2375 15th Av Replace one existing cracked subfloor wood girdes post Complete | Home remodel | Complete | Within 1 month | |
| Mar 18, 2022 | 85 Ora Wy Replace (e) wood retaining wall in common area with stoacked block wall with subdrain. height and length to match (e) wall near building 85 and units 101, 103, 105. Complete | Retaining wall or site work | Complete | 5 months | |
| Oct 27, 2021 | 1948 Washington St Revision to pa 202008121661. underpin helical revision. underpin northeast corner of foundation (uphill side) to prepare for retaining wall replacement. voluntary work Complete | Revision or supplement | Complete | 2 months | |
| Oct 27, 2021 | 1948 Washington St Revision to pa 202008121682. retaining wall pier revision and height. Complete | Revision or supplement | Complete | 2 months | |
| Oct 27, 2021 | 1946 Washington St Revision to pa 202008121660. retaining wall pier revision and height. Complete | Revision or supplement | Complete | 2 months | |
| Jul 20, 2021 | 10 Imperial Al Cosmetic releveling of portion of residence w/ non skrink groot requires removal of lower protion of siding in the area and replace after relevel (visible from street). Complete | Home remodelType unconfirmed | Complete | Within 1 month | |
| Nov 16, 2020 | 43 Ora Wy Remove (e) railroad tie retaining wall and replace with a new solider pile and wood lagging retaining wall with a subdrain. approx 48lf at 2' and 5' ht range.same alignment as existing. work is in hoa common area adj to 80 ora way. Complete | Retaining wall or site work | Complete | 7 months | |
| Jun 28, 2018 | 95 Ora Wy Install subdrain along the east perimeter wall of the north stairwell. install a new sump pump with electrical with automatic pump. collected water will be pumped to landscaped area near garage. remove and replace section of keystone and slab around garage vent as necessary to install subdrain Complete | Retaining wall or site work | Complete | 3 months | |
| Nov 3, 2009 | 32 Cole St Remove & replace a failing concrete retaining wall. Complete | Retaining wall or site work | Complete | Within 1 month | |
| Feb 28, 2008 | 1600 08th Av Install new plywood panel, holddowns and simpson h1 over (e) cripple wall in basement/garage area Complete | Seismic retrofit or foundation | Complete | Within 1 month | |
| Aug 4, 2005 | 2638 Baker St Install reinforced concrete wall a long (e) concrete/block wall. install geo composite. drainage Complete | Retaining wall or site work | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Christopher Lane Wilhite? Request a correction.