Chung Chi Ly
Engineer · Sn Building Design Group · San Leandro
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeCivil Engineer C-79958First issued Jun 29, 2012, expires Sep 30, 2028.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 10 permits since 2017, 10 in the last 5 years. Latest filed Mar 3, 2026.
- What kind of projects?
- Legalize or fix a violation 3 · Home remodel 2 · Addition 2
- How long do their permits take?
- Legalize or fix a violation: 12 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Legalize or fix a violation: 3 permits in San Francisco
Time to get a permit
Median from filing to permit, from 2 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 4,704 permits.
Where
- Sunset/Parkside1
- Castro/Upper Market1
- Presidio Heights1
Most recent
- 2551 30th AvLegalize unpermitted adu 450 sq ft on 1/f. legalize (e) kitchen on 1/f. build partition wall in garage for adu access.Aug 11, 2025Filed
- 92 Henry StRepair fire damage roof and walls to comply with nov# 202289682 (only for residential area) with windows replacement in-kind. all repairs in-kind.Apr 4, 2023Issued
- 1907 Lyon StNew roof deck, new spiral stair, to comply w/ nov #201777311May 24, 2017Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Mar 3, 2026 | 142 Anderson St 1/f re-setback of front face, with new entry door and re-building of stairs. 1/f replacement of concrete slab, with addition of french drains. 1/f new bathroom and hobby room habitable spaces. 2/fl side in-filling at rear with renovation of bathroom and kitchen. rebuilding rear stairs Filed | Addition | Filed | — | |
| Aug 11, 2025 | 2551 30th Av Legalize unpermitted adu 450 sq ft on 1/f. legalize (e) kitchen on 1/f. build partition wall in garage for adu access. Filed | Legalize or fix a violationType unconfirmed | Filed | — | |
| Jul 16, 2024 | 28 02nd St Deferred mep for pa# 202312082195. no exterior work Complete | Revision or supplement | Complete | 5 months | |
| Mar 7, 2024 | 92 Henry St Installation of new heat pumps for units 92, 96 & 98. rewire of whole unit & ckits for unit 96 & 98. meter reset for unit 92. Issued | Other | Issued | Within 1 month | |
| Feb 21, 2024 | 21 Collins St Convert existing storage space 303 sq ft in garage to office space. add a full bath. add new windows, sliding doors and landing in the rear Complete | Home remodelType unconfirmed | Complete | 2 months | |
| Jun 16, 2023 | 36 Huntington Dr Kitchen remodel. removal of existing partition walls. replace existing countertop and cabinets. replace existing sink and hood. installation of a new island gfci outlets. install of new lights Cancelled | Home remodel | Cancelled | — | |
| Apr 4, 2023 | 92 Henry St Repair fire damage roof and walls to comply with nov# 202289682 (only for residential area) with windows replacement in-kind. all repairs in-kind. Issued | Legalize or fix a violation | Issued | 4 months | |
| Apr 29, 2019 | 321 Marietta Dr New side deck. 2nd story deck, 13 ft from grade, glass railing, post metal, wood post, wood framing. Cancelled | Deck, stairs or patio cover | Cancelled | — | |
| Jul 17, 2017 | 54 Sunview Dr Horizontal addition. rear yard 2 level addition 1699 sq.ft. roof deck on 1st level, 414 sq.ft. new windows new garage doors. 2 new bedrooms & 2 new baths. new layout has 5 bedrooms & 4 baths. Withdrawn | Addition | Withdrawn | — | |
| May 24, 2017 | 1907 Lyon St New roof deck, new spiral stair, to comply w/ nov #201777311 Complete | Legalize or fix a violation | Complete | 20 months | |
| Feb 21, 2017 | 1500 Ocean Av Change of use from (e) dry cleaner to retail. add ada button to front facade and power operated door Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Mar 18, 2005 | 289 Lexington St #0 Rev. to pa# 2004/10/13/6672, remove utility basement space from proposed work. remodel level 2 unit to match level 1 & level 3 unit. space heating provided with tankless wh @ ea.unit. Complete | Revision or supplement | Complete | 19 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Chung Chi Ly? Request a correction.