Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeArchitect C-18505First issued Jul 22, 1987, expires Sep 30, 2027.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the California Architects Board enforcement list on Nov 5, 2026.

Worked in San Francisco?
40 permits since 2010, 40 in the last 5 years. Latest filed Jul 8, 2026.
What kind of projects?
Commercial or tenant improvement 24 · Other 7 · ADU 4
How long do their permits take?
Commercial or tenant improvement: 2 months. City typical for the same review: within 1 month.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Permits
45 permits that name Cory Steven Creath, newest first, including 5 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Jul 8, 20262 Turk St #0

Change from r-1 to r-2, modifying fire escape bottom on street level.modify basement walls and doors to provide class 1 bicycle parking spaces, provide class ii bicycle parking spaces on sidewalk. installation of mechanical units on mezz. roof and level 9 roof to meet article 38 requirements.

Filed
Dec 20, 20242 Turk St

Basement floor- removal and in kind replacement of (e) basement partition

Plancheck
May 3, 2023851 California St

Like for like remodel of (e) 15 guest bathrooms and upgrade one of them to bathroom rooom "351"is being modified to comply with ada requirements including roll-in shower. and "egvilanet facilitioan to elevator

Issued
Mar 30, 2023523 32nd Av

Remodel kitchen & bath

Complete
Sep 12, 202050 03rd St

Conversion of (e) 4th floor fitness center into 5 (n) hotel guestrooms. (n) mechanical, electrical, and plumbing work associated with project scope.

Complete
Mar 16, 202050 03rd St #0

Conversion of (e) 3rd floor administrative offices to (n) fitness center & single occupancy all gender restroom. (n) mechanical, electrical & plumbing work associated with project scope

Complete
Dec 27, 201950 03rd St

Conversion of e basement kitchen and liquor storage room to administrative offices. new exhaust fan on 4th fl roof with ass ductwork servinbv new offices. new lec and mech scope in e phone room. updates to main entry and accessible path to travel

Complete
Dec 24, 2019630 Geary St #0

Remodel of 54 units to include (n) ensuite bathrms, (n) finishes & n lighting, addition of 2 common kitchenettes & conversion of 2 sleep units to common dining space. remodel of (e) kitchenette, dining area, & laundry rm w/(n) finishes, appliances & lighting. removal & replacement of (e) elevator ca

Cancelled
Dec 11, 20191300 Columbus Av

Abe#202002071852, to comply w/s.f. accessible business entrance program ord 51-16. add new accessibility ramp to meet requirements abe ordinance 51-16

Issued
Jul 30, 20191231 Market St

Interior alteration of (e) hotel lobby, to include a lobby bar & grab and go

Complete
Jun 10, 20191300 Columbus Av #0

Interior renovation at (e) 1st flr restaurant determine occupant load

Issued
Oct 11, 20172180 Post St

G/f: (e) unisex bathroom to be remoded for ada barrier removal: new fixtures, finishes, replacing (e) one for one.

Cancelled
Sep 13, 20172038 Divisadero St #0

Add 3 units, 1 bath in each unit (3) on ground floor only per ordinance #162-16. no changes to 2nd,3rd and 4th fls. changes to egress on ground floor only. soft story retrofit under separate permit #201709137860

Withdrawn
Sep 13, 20172038 Divisadero St #0

Soft story retrofit of ground floor per sfbc chapter 34b engineering criteria fema p-807.

Complete
Jun 21, 20172300 Harrison St

Adding 2 walls between (e) offices and creating 2 new offices on the 1st floor. adding kitchenette area with new sitting area. new electrical and plumbing in new kitchenette. maher na

Complete
May 11, 2017835 Hyde St #0

Adding 3 new rooms by splitting 3 guest suites, 3 new bathrooms and remodel 3 existing bathrooms; adding door automatic opener; new reception desk (accessible)

Filed
Jan 25, 20174540 California St

Add unit per ordinance no. 162-16. adu at ground floor only. add 3 (n) units to (e) blgd per ordinance no. 162-16 unit #1 & #2 has 1 bedroom,1 bathroom, 1 kitchen. unit#3 2 bedroo,1 bath & 1 kitchen.

Cancelled
Jan 25, 20173715 California St

Adu at ground floor only. add 3 (n) units to (e) blgd per ordinance no. 162-16.each unit has 1 bedroom,1 bathroom, 1 kitchen. n/a for maher. add unit per ordinance no. 155-13.

Filed
Nov 2, 20165 Embarcadero Center

Bathroom shower conversion in 78 rooms, selective wall & floor relocation, selective electrical relocation, convert 1 balcony suite to accessible suite. n/a ordinance #155-13

Complete
Sep 16, 2016600 Oak St

Added dwelling units (adu) @ ground floor only. renovation to add 5 (n) units to (e) building. refer to application #2016-0909-7252 for soft story retrofit drawings by structural engineer. adu per ordinance 162-16. sprinkler/life safety/mep deferred.

Issued

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.