Daniel Perez
Architect · Studio Perez · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-28030First issued Jan 19, 2000, expires Sep 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 45 permits since 2007, 45 in the last 5 years. Latest filed Oct 22, 2026.
- What kind of projects?
- Commercial or tenant improvement 17 · Other 11 · Home remodel 8
- How long do their permits take?
- Commercial or tenant improvement: 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 17 permits in San Francisco
Time to get a permit
Median from filing to permit, from 13 issued permits filed since 1966; 3 still in review. City is the San Francisco median for the same kind of review, from 23,779 permits.
Where
- Castro/Upper Market3
- Financial District/South Beach3
- Mission3
- Nob Hill3
Most recent
- 401 Duboce AvVolunterily add automatic door opener and actuators to existing west door leaf of entrance doors to improve accessibilityMay 21, 2026Filed
- 388 Market StChange of use to include ti of suite 107 to include replacement of flooring, wall, and ceiling finishes and installation of (n) and (e) furnishing fixtures, and equipment. a non bearing wall and per will be removed. some non outlets and switches will be added and (n) sink well be connected to (e)Mar 30, 2026Issued
- 100 Church StSuite b at south corner - ref ti 201805249985- add automatic door operner and actuators to (e) entrance doors to improve accessibility.Dec 5, 2025Filed
- 100 Church StSuite a at north east corner - ref ti 201805249985- add automatic door operner and actuators to (e) entrance doors to improve accessibility.Dec 5, 2025Filed
- 2301 Mission StSte 301: tenant improvement of 2nd flr private offcies 212,213 and 214 for soundproofing improvements and accoustical improvements to the 2nd flr conference room 211.Apr 28, 2025Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 22, 2026 | 1928 Mcallister St Storefront n) tile base & clerestory window, wood rot repair & insulation. improve rain leader drain. new roof with ventilation @ attic, replace e) skylights, replace blown-in insulation w/ batt insulation. voluntary structural improvement in work studio, add sliding wall & storage alcove - two burn Issued | Other | Issued | Within 1 month | |
| Aug 28, 2026 | 2277 33rd Av Revision to pa #202606042578: demo lower roof & sheating +replaced w/sheathing, cover board+membrane roof. the roof deck will be rebuilt over sleepers parapet walls that act as guardrails on the north+south sides of the deck. metal guardrails added on east+west sides of deck. roof guards+ leaders Issued | Revision or supplement | Issued | Within 1 month | |
| Jun 4, 2026 | 2277 33rd Av Demolition and reconstruction of (e) roof deck. (e) metal guardrail to be refurbished and re-utilized. add gutter + rain leaders connected to sewer line. Issued | Deck, stairs or patio cover | Issued | Within 1 month | |
| May 21, 2026 | 401 Duboce Av Volunterily add automatic door opener and actuators to existing west door leaf of entrance doors to improve accessibility Filed | Commercial or tenant improvementType unconfirmed | Filed | — | |
| Mar 30, 2026 | 388 Market St Change of use to include ti of suite 107 to include replacement of flooring, wall, and ceiling finishes and installation of (n) and (e) furnishing fixtures, and equipment. a non bearing wall and per will be removed. some non outlets and switches will be added and (n) sink well be connected to (e) Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Dec 5, 2025 | 100 Church St Suite b at south corner - ref ti 201805249985- add automatic door operner and actuators to (e) entrance doors to improve accessibility. Filed | Commercial or tenant improvement | Filed | — | |
| Dec 5, 2025 | 100 Church St Suite a at north east corner - ref ti 201805249985- add automatic door operner and actuators to (e) entrance doors to improve accessibility. Filed | Commercial or tenant improvement | Filed | — | |
| Apr 28, 2025 | 2301 Mission St Ste 301: tenant improvement of 2nd flr private offcies 212,213 and 214 for soundproofing improvements and accoustical improvements to the 2nd flr conference room 211. Complete | Commercial or tenant improvement | Complete | 3 months | |
| Apr 21, 2025 | 400 China Basin St #306 Unit #306: replace (e) bath tub with a shower base, modify shower plumbing fixtures for improved accessibility, patch, repair, and add tile as required to match (e), add shower seat. Issued | Home remodel | Issued | 10 months | |
| Apr 17, 2025 | 400 China Basin St Udummy Filed | Other | Filed | — | |
| Apr 18, 2024 | 2301 Mission St Tenant improvement 2nd and 3rd fl break rooms. includes new flooring finishes, new base cabinet island at 3fd fl brk rm. elec work will consist of adding outlets /switches, relocate elec panel. add alternatte work to add small office at 3rd fl. Complete | Commercial or tenant improvement | Complete | 2 months | |
| Jun 29, 2023 | 1001 Powell St Owner improvement of 1001 powell includes replacing e restroom with accessible single occupancy restroom,replacement of wall and floor finishes,replacement e light fixtures,power at laundromat,mech rm, storage. accessible entrance provided under 202202228422 Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jun 29, 2023 | 1005 Powell St Add a residential laundry room, adjacent to lounge, for sro tenants of the building on the upper floors of the 5-story building. lounge was permitted under pa# 202204142240. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Mar 10, 2023 | 937 Clay St #0 Rev to pa# 202109309577, 1 of the bedrooms in unit 250 @ ground lvl converted to trash room. the bedroom unit will become a 1 bedrm unit.property manager office will be relocated from the 2nd flr to the former study of unit 250 and a single occup restrm will be added. ramp will be modified @ 250 Complete | Revision or supplement | Complete | Within 1 month | |
| Feb 9, 2023 | 1003 Powell St T.i., replace (e) restroom w/accessible single occ restroom, replace wall/floor finishes, (e) light fixtures, power, reinstall tenant plumb fixtures & washing machine. abe under bpa#202204142240 Complete | Revision or supplement | Complete | Within 1 month | |
| Dec 21, 2022 | 937 Clay St #0 Scope of work include conversion of sro unit 223, 323, and 425 to community kitchen for tenant use. planned improvements incldue using salavaged sst sinks from existing kitchens, adding a sst counter top with two electric cook tops and range hoods. mep scope include providing plumbing and exhaust, Complete | Commercial or tenant improvementType unconfirmed | Complete | Within 1 month | |
| Apr 14, 2022 | 1005 Powell St To comply with nov#201803424.replace entries.former residential lobby will become sro manager office.reconfigure entry.warp sidewalk to provide landing.add ramp in the office for accessibility.modify(e)storage areas to a trash room, lounge & restroom.mep improvements.infill vault&cover at sidewalk Complete | Legalize or fix a violation | Complete | 6 months | |
| Feb 25, 2022 | 1001 Powell St R/r finishes,fixtures,equipment and mep upgrades at units of the 4 sro levels of 1005 powell. door openings at the unit entires are widened to 36in.(e) wdws at fire escapes are replaced with doors.wdws replace with alum-clad wdw at powell and clay st elevations. and vinyl windows Complete | OtherType unconfirmed | Complete | 2 months | |
| Feb 22, 2022 | 1005 Powell St Structural work mandatory soft story retrofit using cebc appendix ch a4 and associated accessibility alterations. accessibility improvments include replacement of entry door and side lite at e laundromat. automatic door operators added to the laundromat entrace and at the existing salon door entranc Complete | Seismic retrofit or foundation | Complete | 2 months | |
| Dec 29, 2021 | 1005 Powell St Common space improvements include replacement or repair of finishes, fixtures, equipment and mep upgrades at community kitchens, bathrooms and corridors of the 4 sro residential levels of 1005 powell. 1 of the bathrooms will be made semi-accessible at each level. doors at the bathrooms and ktchens Complete | Home remodel | Complete | 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Daniel Perez? Request a correction.