CheckMyDesigner

David Michael Mcmillan

Engineer · Salas O'brien · San Francisco

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeStructural Engineer S-5988First issued Dec 18, 2013, expires Sep 30, 2028.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the BPELSG enforcement list on Nov 5, 2026.

Worked in San Francisco?
4 permits since 2024, 4 in the last 5 years. Latest filed May 19, 2026.
What kind of projects?
Other 3 · Commercial or tenant improvement 1
How long do their permits take?
Commercial or tenant improvement: 9 months. City typical for the same review: 6 months.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Permits
5 permits that name David Michael Mcmillan, newest first, including 1 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
May 19, 202630 Onondaga Av

Remove & install 4,000 gallon above ground storage tank. connect (e) underground double wall piping to new ast. upgrade tank monitoring panel.

Filed
Jan 23, 20263318 Steiner St

Revision tpo pa #202310047992. locally thicken existing grade beam on 2 different walls.

Issued
Jul 2, 2025450 Hayes St

Demo existing duplex sewage injector pumps and replace w/new. provide & install self contained duplex alternating ejector pumps in mechanical room. rotate & raise (e) sand interceptor & assoc piping to allow proper slope. provide & install (2) bath water valves.

Issued
Jul 11, 20244131 Geary Bl

Replace 2 existing washer, disinfector, upgrade di water system, 1 drying cabinet

Filed
Jun 18, 20243318 Steiner St

Cold shell building for future restaurant build-out: facade renovation including moment frame, new restroom, new roof and skylight, seismic upgrade, new floor slab, new electrical service, new plumbing service. deferred electrical & mep permits.

Issued

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you David Michael Mcmillan? Request a correction.