Devendra Singh Deshwal
Engineer · Unicorn Structures · San Jose
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeCivil Engineer C-89732First issued Dec 7, 2018, expires Mar 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 13 permits since 2021, 13 in the last 5 years. Latest filed Sep 11, 2026.
- What kind of projects?
- Home remodel 7 · Legalize or fix a violation 3 · ADU 2
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 7 permits in San Francisco
Time to get a permit
Median from filing to permit, from 7 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 9,196 permits.
Where
- West of Twin Peaks3
- Excelsior1
- Outer Mission1
- Marina1
Most recent
- 970 Naples St1)remodeling of upper floor. 2)relocation and remodeling of kitchen. 3)remodeling of bathroom. 4) replacement of windows of same size. 5) add a bedroom, a total of 3.Sep 11, 2026Issued
- 255 Capistrano AvConvert part of garage to create a media room, bathroom, and a closet; enlarge opening on exterior rear wall and add structural ply and holdownsJun 16, 2026Reinstated
- 2421 Greenwich StLower floor: contruction of (2) storage rooms with a half bathroom in the storage area on the rear side of garage (unconditioned). no changes at first & second floor.Nov 23, 2022Complete
- 10 Crown TrRemoval of arch between kitchen and family rm, remodel kitchen. remodel master bath and closet 2nd fl. conversion of closet into bdrm 2nd f. add window. modification of lower 3 steps at main fl. widen opening betwn family and hallway and living room and hallwayOct 31, 2022Complete
- 21 Santa Paula AvConversion of 1 bedroom into a bathroom & a walk-in closet. conversion of 1 bedroom into 2 bedrooms. windening of stairs from 2'7" to 3'0" wide. remodel kitchen including removal of a wall between kitchen & dining room. remodel bathrooms.Apr 19, 2022Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 11, 2026 | 970 Naples St 1)remodeling of upper floor. 2)relocation and remodeling of kitchen. 3)remodeling of bathroom. 4) replacement of windows of same size. 5) add a bedroom, a total of 3. Issued | Home remodel | Issued | Within 1 month | |
| Aug 6, 2026 | 3651 Ortega St Remove wall between enrty room & stair vestibule on 1st floor. convert rear garage into living area & convert this area along with adjacent bedroom & etc to adu under state adu program. remove wall between living room & kitchen / dining room. remodel kitchen on 2nd floor. restoration of balcony on Filed | ADU | Filed | — | |
| Jun 16, 2026 | 255 Capistrano Av Convert part of garage to create a media room, bathroom, and a closet; enlarge opening on exterior rear wall and add structural ply and holdowns Reinstated | Home remodelType unconfirmed | Reinstated | 1 month | |
| Mar 12, 2026 | 2462 17th Av Legalize (e)unit @ lower fl w/ lowering of floor, comply w/nov 202313090. update (e) kitchen & bath w/ ventilation.provide egress requirements.correct action for novs ref.pa# 202406053753.nov 202313092-remove metal gate in front of garage door.nov 202309577:repair/repaint wall by tub and repair fan. Issued | Legalize or fix a violation | Issued | 3 months | |
| Apr 23, 2025 | 2462 17th Av Legalization of (e) unit at lower fl with lowering of floor.update (e) kitchen & bath with ventilation.provide egress requirements.correct action for other notice front of violations (202406053753).nov 202313092-remove metal gate in garage door.nov 202309577:repair/repaint wall by tub and repair fan Cancelled | Legalize or fix a violation | Cancelled | — | |
| Oct 7, 2024 | 2462 17th Av Revision to pa # 2024-0605-3753 alter desing of half bath to a full bath. add a linen closet Issued | Revision or supplement | Issued | Within 1 month | |
| Jun 5, 2024 | 2462 17th Av To comply w/ nov# 202308577 and 202313092: interior remodel on main fl (2nd fl). add 1/2 bath & remove wall for open concept. Issued | Legalize or fix a violation | Issued | Within 1 month | |
| Dec 19, 2023 | 51 Dorado Tr Revision to pa 202311171013 (repair/restoration of kitchen). interior only. no exterior work. Complete | Revision or supplement | Complete | Within 1 month | |
| Sep 14, 2023 | 3335 Divisadero St Revision to bpa#2021-0622-2996. relocationo of hvac/furnace @ 1st, 2nd & 3rd flr, down sizing windows/removing windows on 1st, 2nd & 3rd flrs as shown on revised plans. Expired | Revision or supplement | Expired | Within 1 month | |
| Sep 1, 2023 | 646 10th Av Revision to pa# 202306291226, (646/648)install new post and beam on kitchen area, (648a)install new post and beam on garage area. Issued | Revision or supplement | Issued | 1 month | |
| Jan 27, 2023 | 10 Crown Tr Revison to pa # 202210315509, to reduce scope of work and clear up some of the beams not required per engineer. new structural plans. Complete | Revision or supplement | Complete | 1 month | |
| Nov 23, 2022 | 2421 Greenwich St Lower floor: contruction of (2) storage rooms with a half bathroom in the storage area on the rear side of garage (unconditioned). no changes at first & second floor. Complete | Home remodel | Complete | Within 1 month | |
| Oct 31, 2022 | 10 Crown Tr Removal of arch between kitchen and family rm, remodel kitchen. remodel master bath and closet 2nd fl. conversion of closet into bdrm 2nd f. add window. modification of lower 3 steps at main fl. widen opening betwn family and hallway and living room and hallway Complete | Home remodel | Complete | Within 1 month | |
| May 2, 2022 | 255 Capistrano Av New addition of bathroom, hallway, and bedroom at garage level. removal of rear patio roof. Cancelled | Addition | Cancelled | 31 months | |
| Apr 19, 2022 | 21 Santa Paula Av Conversion of 1 bedroom into a bathroom & a walk-in closet. conversion of 1 bedroom into 2 bedrooms. windening of stairs from 2'7" to 3'0" wide. remodel kitchen including removal of a wall between kitchen & dining room. remodel bathrooms. Complete | Home remodel | Complete | Within 1 month | |
| Feb 11, 2022 | 401 Vicente St 1)addition of bedroom at lower level by carving out space from the garage. 2)remodeling of lower level bathroom with increase in size. 3)relocation of furnace in garage. 4)relocation of washer/dryer in the garage. 5)modification of the rearside window at lower floor to meet ventilation requirement Complete | Home remodel | Complete | Within 1 month | |
| Dec 16, 2021 | 2671 15th Av G/f: relocate laundry area, add a family room (e) bedroom and bathroom. add 1 full bathroom. reconfigure (e) stair to the 2/f. 2/f: relocate (e) interior stairway to g/f, infill (e) lightwell. add 1 full bathroom, remodel (e) kitchen area and dining area. Complete | Home remodel | Complete | 1 month | |
| Mar 1, 2021 | 3615 Scott St #0 The project is for construction of an adu at the first floor of the existing 3 story building. presently, the first floor is being used for parking and storage. the building envelope remains the same. the mechanical appliances shall be relocated at nearby location. Withdrawn | ADU | Withdrawn | — |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Devendra Singh Deshwal? Request a correction.