CheckMyDesigner

Donna Kim Cook

Architect · Brereton

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeArchitect C-34846First issued Nov 25, 2014, expires May 31, 2027.

Source: DCA License Search, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the California Architects Board enforcement list on Nov 5, 2026.

Worked in San Francisco?
33 permits since 2016, 33 in the last 5 years. Latest filed Jun 12, 2024.
What kind of projects?
Commercial or tenant improvement 32 · Other 1
How long do their permits take?
Commercial or tenant improvement: 1 month. City typical for the same review: within 1 month.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Permits
56 permits that name Donna Kim Cook, newest first, including 23 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Jun 12, 2024188 The Embarcadero

1st floor: revision to pa#202212198621 to include modification to dry food storage, furniture storage and storage closet. construction of non-load bearing partitions, new glazing and door frame, new ceiling and light fixtures. modified reception desk, modifiication in basement.

Complete
Jun 12, 2024188 The Embarcadero

6th fl - modification of existing tenant space to include new finishes, light fixtures, new convenience power receptacles, water lines and power

Complete
Jan 17, 2024350 Bush St

9/f: selective demo of interior partitions, glazing, millwork and lighting. construction of non-load bearing partitions, new ceiling and light fixtures, new office doors, frames and finishes.

Complete
Jan 11, 2024188 The Embarcadero

Revision to pa#202207279366, 202310239228, 202312122338 for the 5th floor. demolition of phone rooms 518,519, and 520 converting to a hallway at stair #2. relocating 2 phone rooms.

Complete
Dec 14, 2023188 The Embarcadero

2nd fl - revision to pa 202207279364 & 202310199071 to remove white boards demo door e228 and portion of wall at idf/riser. mesc changes on construction plan reflected ceiling, power & signal & finishes plans

Complete
Dec 14, 2023188 The Embarcadero

3/f: revision to pa# 202212198622, to construct a hallway at stair #2 and the addition of a coffee and bevi machine and fridge with millwork modifications.

Complete
Dec 11, 2023888 Brannan St

3/f: selective demolition and construction of non-load bearing partitions, modifications to existing ceiling and tile. mep deferred.

Issued
Oct 23, 2023188 The Embarcadero

5/f: revision to bpa#202207279366, remove gender neutral restroom, removal of banquettes in hall 505, relocation of mk522 & revise layout in lounch 524.

Complete
Oct 19, 2023188 The Embarcadero

2/f: revision to bpa#202207279364, modification to non-load bearing partitions @ (e)tenant suite entrances/exits to for single tenant, reduce scope of work throughout

Complete
Sep 27, 2023651 Brannan St

4th fl - construction of a non-load bearing partition with new door and frame. demolition of decorative light fixtures, new paint and base and new wall

Complete
Sep 7, 20233838 California St

Replacement of existing rooftop generator on the existing equipment concrete pad. not visible from the street.

Filed
Jun 9, 20232300 Harrison St

3/f: mods of (e) t.i. to include selectrive partial demolition on non-load bearing partitions and addition of new glazing and framings, new door, frames and finishes.

Complete
Feb 10, 2023651 Brannan St

3/fl: revision is to update the pa# 202209273188, to show reduced scope of work, existing spaces that are no longer to be demo'd are to remain.

Cancelled
Jan 27, 2023300 Clay St #0

16th fl revision to 201912230299. update occupancy load calculation for hall 1611 to show proposed lounge furniture

Issued
Jan 27, 2023188 The Embarcadero

For dph review only as it was missed under issued permit# 2022-0719-8766(t.i. for floor 8)

Complete
Dec 19, 2022188 The Embarcadero

1st/flr & basement: ti modification to create an enclosed 1st flr elevator lobby. construction of non-load bearing partition, n doors, glazing, door frame, ceilings, light fixtures, reception desk, power & data receptacles. bsmt lvl only involves mod to e elevators lobby door. mep & life safety def

Complete
Dec 19, 2022188 The Embarcadero

This project includes modifications on (e) mens & womens base bldg restrooms for fl 4 & 6, to remove accessibility barriers & update partitions, accessories & finishes as needed. scope incl replacement of toilet partitions & (n) or relocated plumbing fixtures + accessories. mep deferred submittal.

Withdrawn
Jul 27, 2022188 The Embarcadero

Ti on floor 2: new non load bearing partition doors, frames, ceilings, light fistures, power/data receptacles, millwork, finishes

Complete
Jul 19, 2022188 The Embarcadero

8/fl: ti including the construction of non load bearing partitionsnew office doors and door frames. new ceiling and light fixtures new power and data receptacles, new millwork finishes. ref pa 201603242951

Complete
Jul 6, 2022188 The Embarcadero

7th fl: modification of (e) ti including the construction of non-load bearing partitions, new office doors & frames, new ceilings, and light fixtures, new power & data receptacles, new millwork & finishes.

Complete

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Donna Kim Cook? Request a correction.