Edward Lee Hammack
Architect · Edw. Lee Hammack, Architect · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-13890First issued May 25, 1983, expires May 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 110 permits since 2003, 110 in the last 5 years. Latest filed Sep 23, 2026.
- What kind of projects?
- Home remodel 47 · Commercial or tenant improvement 20 · Deck, stairs or patio cover 14
- How long do their permits take?
- Home remodel: 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 47 permits in San Francisco
Time to get a permit
Median from filing to permit, from 43 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 10,640 permits.
Where
- Bernal Heights10
- West of Twin Peaks6
- Noe Valley5
- Outer Richmond4
Most recent
- 65 Aerial WyAlter site permit 202209082081-s: interior remodel at 1/f - remove service stair, remove garage post, install new beam. interior remodel at 2/f - remodel kitchen and 2 bathrooms, fill in service stair flr opening and service stair door opening. other - replace all windows in (e) rough openings.Oct 4, 2024Issued
- 1422 Cabrillo St #02/f: convert (e) laundry room to a bathroom; extend an (e) hall; move (e) bedroom doors. 1/f: move washer and dryer into garage.Jun 7, 2023Complete
- 666 37th AvConstruct a new bathroom in existing closet space including 11 sqft lightwell infill; remodel bathroom and add two skylight to each bathroom at 2nd floor.May 8, 2023Complete
- 1558 Clay StCreate new habitable spaces in the existing utility spaces at the g/f, including a kitchenette, a wine room, a gym, a media room and a bathroom. work to include new windows and doors in existing rough openings.Mar 21, 2023Complete
- 1448 Plymouth AvConst n) footings @ 1st/f build a habitable rm on the open area under the 2nd fl office, plus a bedroom, bathroom & a stair up to the 2nd fl; @ the 2nd fl demo hall closet & bathroom & build 2 new bathrooms & a closet & remodel the kitchen. replace all windows w/ identical windows & insulated glass.Dec 16, 2022Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 23, 2026 | 3795 Market St 265sqft 2nd flr bedroom addition above an existing street level garage at the front of home. horizontal addition. total aggregate flr area is less than 1000sqft. Filed | Addition | Filed | — | |
| Apr 23, 2026 | 1284 Mission St Door and window replacement Issued | Other | Issued | Within 1 month | |
| Apr 21, 2026 | 93 09th St New store front Issued | Other | Issued | Within 1 month | |
| Feb 23, 2026 | 1512 20th St Demo (e) backstair & deck at behest of insurance company to renew policy due to condition. no new replacement or reconstruction planned at this time. Complete | Deck, stairs or patio cover | Complete | Within 1 month | |
| Feb 10, 2026 | 2931 Fillmore St New 1-hour rated window in a side/property line wall. Issued | Other | Issued | Within 1 month | |
| Feb 9, 2026 | 20 Tingley St Construct a (n) 2nd floor bathroom, including the addtion of 10sf at the 2nd floor and replace (2) single glazed windows with 1 dual glazed windows. not visible from street Filed | AdditionType unconfirmed | Filed | — | |
| Jan 20, 2026 | 1284 Mission St Deferred mep for 202410072461, 202512. delete a toilet and exhaust fan approved for installation under 202505037798. ref drawings attached. Complete | Revision or supplement | Complete | Within 1 month | |
| Jan 17, 2026 | 572 San Jose Av Rear addition to an existing 2 story, 2 family dweling. interior renovations including new kitchen and bathrooms. Approved | Addition | Approved | — | |
| Jun 3, 2025 | 1284 Mission St Revision to 202410072461 and 202501299312 and compliance with unresolved violations on nov 2024-27441 comply with info sheet da-02. remove kitchen, covert laundry to 1/2 bath, remove full bath, modify partition layout. all other items resolved under prior permits. retail space only. Complete | Revision or supplement | Complete | Within 1 month | |
| Mar 20, 2025 | 680 08th St Rear ramp-volutary modify the (e) ramp at the rear parking lot to comply with current access standards, including (n) concrete extensions and topping (n) guardrail and wheel guide (n) battery powered actuated door closer and new signage Filed | Commercial or tenant improvementType unconfirmed | Filed | — | |
| Feb 28, 2025 | 145 Broadmoor Dr Revision to bpa 2025-0114-8242 remove additional walls, revise approved posts & beam; revise cabinets & counters; install new flue Complete | Revision or supplement | Complete | Within 1 month | |
| Jan 29, 2025 | 1284 Mission St Comply with abe program abe #201912039085 Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jan 21, 2025 | 1432 Valencia St Revision 202309196885- remodel storefront with new windows taken out of scope. original windoows remain. bench seating in west side of dining area removed. fixed booth seating in east side of dining area taken out of scope. original bench seating removed. seating areas to be furnished with tables Complete | Revision or supplementType unconfirmed | Complete | 1 month | |
| Oct 7, 2024 | 1284 Mission St Change of use from medical cannabis dispensary to retail general market. to comply with nov 202427441, 200225321 & 2024003678enf. comply with info sheet da-02 attached. remove awning; reverse security gate swing Complete | Legalize or fix a violationType unconfirmed | Complete | 4 months | |
| Oct 4, 2024 | 65 Aerial Wy Alter site permit 202209082081-s: interior remodel at 1/f - remove service stair, remove garage post, install new beam. interior remodel at 2/f - remodel kitchen and 2 bathrooms, fill in service stair flr opening and service stair door opening. other - replace all windows in (e) rough openings. Issued | Home remodelType unconfirmed | Issued | 4 months | |
| Jun 3, 2024 | 601 Vallejo St For compliance with abe program. abe 201901033808 1. replace thumb turn latch set with lever hardware. 2. adjust door closer to max. 8.5 pounds opening force or replace with new closer with max. 6 pounds opening force Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| May 30, 2024 | 366 Columbus Av For compliance with the abe program. abe #201901033810 replace door hardware with ada compliant hardware, techinical infeasibility for door bell, power door operator. Filed | Commercial or tenant improvement | Filed | — | |
| May 28, 2024 | 362 Columbus Av For compliance with the abe program #201901033814: 1)install new sign the entrance is infeasible for lift or landing. 2)install nw doorbell or itercom to alert personal of customer outside needing curbside assistance. 3)adjust closer to max. 8.5 pounds t open, or replace with a closer with Filed | Commercial or tenant improvement | Filed | — | |
| May 23, 2024 | 358 Columbus Av For compliance with the abe program - abe 201901033817. install (n) sign the entrance is infeasible for lift or landing. install (n) doorbell or intercom to alert personnel of custoemr outside needing curtside assistance. replace (e) door with (n) 36" wide in-swing door. remove doormat Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Apr 18, 2024 | 4036 18th St #0 Revision to pa# 2021-0830-7365 to show wetbar near the kitchen. note 36" electric furnace in living room. change glass guardrail to metal guardrail in living room Complete | Revision or supplement | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Edward Lee Hammack? Request a correction.