Edward Rivera
Engineer · Rivera Consulting Group Inc · Menlo Park
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeStructural Engineer S-2835First issued Mar 21, 1986, expires Mar 31, 2028.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 104 permits since 2004, 104 in the last 5 years. Latest filed Sep 25, 2026.
- What kind of projects?
- Commercial or tenant improvement 36 · Other 21 · Home remodel 19
- How long do their permits take?
- Commercial or tenant improvement: 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 36 permits in San Francisco
Time to get a permit
Median from filing to permit, from 32 issued permits filed since 1966; 4 still in review. City is the San Francisco median for the same kind of review, from 24,201 permits.
Where
- Financial District/South Beach30
- Chinatown3
- Twin Peaks1
- South of Market1
Most recent
- 101 California St24 & 25/fl: ti, non-structural partitions, ceilings, fixtures, finishes & associated mep.Sep 25, 2026Filed
- 1 Market St1st fl - interior renovation and fitout of approx. 26,480sf commercial kitchen, bar, grab-and-go, and seating areas. mep and kitchen/food service drawings under separate permit. no change of use. structural drawings included.Sep 2, 2026Filed
- 1 Market St1st fl: interior oly tenant improvement to construct new fitness center. mep deferred.Jul 15, 2026Filed
- 1 Market St1st fl - interior ti of approx 10,500 sf of amenity space which includes a new event spaceJul 10, 2026Filed
- 650 California St #012 flr: office t.i. including interior partitions, doors, finishes, ceiling, lights, millwork. seismic requirement for (9) new phone booths. mep deferred.May 11, 2026Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 25, 2026 | 101 California St 24 & 25/fl: ti, non-structural partitions, ceilings, fixtures, finishes & associated mep. Filed | Commercial or tenant improvement | Filed | — | |
| Sep 22, 2026 | 30 Battery St Addition of 4 new ev charging station on basement level. accesibility upgrades to (e) charging station on level 1 to provide a van accessible space. Issued | Other | Issued | 1 month | |
| Sep 2, 2026 | 300 Clay St #0 Alteration to the existing mech. system serviing specific. basement zones and ground flr zones. reduce (e) constent air volume w/variable air volume sf-12 an economizer. provide (n) vav boxes for sf-12 zones and replace hot water coils as indicated in hvac schedules provide (n) return fan rfb to Triage | Other | Triage | — | |
| Sep 2, 2026 | 1 Market St 1st fl - interior renovation and fitout of approx. 26,480sf commercial kitchen, bar, grab-and-go, and seating areas. mep and kitchen/food service drawings under separate permit. no change of use. structural drawings included. Filed | Commercial or tenant improvement | Filed | — | |
| Aug 26, 2026 | 405 Howard St #0 Installation of steel posts on the roof of 405 howard st, the posts are part of a horizontal life line system. designed by others, to be used by maintenance personnel for fall protection. there is no public roof access. Issued | Deck, stairs or patio coverType unconfirmed | Issued | 1 month | |
| Aug 25, 2026 | 201 Mission St Ref demo permit#: 202602055297. scope new concrete slb on grade, strucutural concrete, install pergola (separately) with footing. not include civil, mech, and electrical. Issued | Revision or supplementType unconfirmed | Issued | Within 1 month | |
| Aug 20, 2026 | 1 Front St Repave (e) plaza @ market st entry w/stone. (n) planter & seating; repave 9e) entry @ front st w/stone; repave portion of sidewalk w/stone; (n) waterproofing extending into public right of way. (n) awning; (n) storefront doors & recessed entry; refurbish (e) stair door Filed | Other | Filed | — | |
| Aug 4, 2026 | 300 Mission St 6th fl - revision to 202512222450 installation of life safety seismic requirements for new (2) 1 person and (1) 2 person phone booths in an existing office total of 3 phone booths full restroom remodel included Issued | Revision or supplement | Issued | Within 1 month | |
| Jul 24, 2026 | 1 Front St Deferred submittal for mechanical, electrical, plumbing, food service. gr fl restaurant. ref 202605261845 Issued | Revision or supplement | Issued | 3 months | |
| Jul 15, 2026 | 1 Market St 1st fl: interior oly tenant improvement to construct new fitness center. mep deferred. Filed | Commercial or tenant improvement | Filed | — | |
| Jul 10, 2026 | 1 Market St 1st fl - interior ti of approx 10,500 sf of amenity space which includes a new event space Filed | Commercial or tenant improvement | Filed | — | |
| Jun 24, 2026 | 150 California St Replace 2 existing boilers with new condensing gas fire boilers located in the roof penthouse. Issued | Other | Issued | Within 1 month | |
| May 14, 2026 | 300 Mission St Ev charging stations w/structural support Issued | Home remodelType unconfirmed | Issued | 6 months | |
| May 11, 2026 | 650 California St #0 12 flr: office t.i. including interior partitions, doors, finishes, ceiling, lights, millwork. seismic requirement for (9) new phone booths. mep deferred. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| May 1, 2026 | 1 Market St Ev charging station - basement level garage. restriping and add 4 ev charging stations. electrical and structural. Filed | OtherType unconfirmed | Filed | — | |
| Apr 27, 2026 | 101 02nd St (ste# 350 / 3rd floor) revision to pa# 202603268312: work includes installation of 6 phone booths. Issued | Revision or supplement | Issued | Within 1 month | |
| Apr 16, 2026 | 1 Market St Floors: 31st to 43rd: installation of a 6 inch cold water riser between 31st-43rd story steel framed office tower Filed | Other | Filed | — | |
| Apr 8, 2026 | 300 Clay St #0 Installation of a mechanical service access platform and ladder in the street level fan room Issued | OtherType unconfirmed | Issued | Within 1 month | |
| Apr 8, 2026 | 300 Clay St #0 26/f: replace the (e) general exhaust fan, ef-3, located on the 26th floor of one maritime plaza, with a 31,200 cfm variable - volume exhaust fan to increase tenant exhaust airflow capacity. the exhaust riser will be reused. Complete | Other | Complete | Within 1 month | |
| Apr 8, 2026 | 1 Market St Exterior building maintanence unit replacement of existing. scope includes installation of anchor points on the roods of two office towers at spear and tower steuart. Issued | OtherType unconfirmed | Issued | 2 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Edward Rivera? Request a correction.