CheckMyDesigner

Edward Rivera

Engineer · Rivera Consulting Group Inc · Menlo Park

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeStructural Engineer S-2835First issued Mar 21, 1986, expires Mar 31, 2028.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the BPELSG enforcement list on Nov 5, 2026.

Worked in San Francisco?
104 permits since 2004, 104 in the last 5 years. Latest filed Sep 25, 2026.
What kind of projects?
Commercial or tenant improvement 36 · Other 21 · Home remodel 19
How long do their permits take?
Commercial or tenant improvement: 1 month. City typical for the same review: within 1 month.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Permits
150 permits that name Edward Rivera, newest first, including 46 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Sep 25, 2026101 California St

24 & 25/fl: ti, non-structural partitions, ceilings, fixtures, finishes & associated mep.

Filed
Sep 22, 202630 Battery St

Addition of 4 new ev charging station on basement level. accesibility upgrades to (e) charging station on level 1 to provide a van accessible space.

Issued
Sep 2, 2026300 Clay St #0

Alteration to the existing mech. system serviing specific. basement zones and ground flr zones. reduce (e) constent air volume w/variable air volume sf-12 an economizer. provide (n) vav boxes for sf-12 zones and replace hot water coils as indicated in hvac schedules provide (n) return fan rfb to

Triage
Sep 2, 20261 Market St

1st fl - interior renovation and fitout of approx. 26,480sf commercial kitchen, bar, grab-and-go, and seating areas. mep and kitchen/food service drawings under separate permit. no change of use. structural drawings included.

Filed
Aug 26, 2026405 Howard St #0

Installation of steel posts on the roof of 405 howard st, the posts are part of a horizontal life line system. designed by others, to be used by maintenance personnel for fall protection. there is no public roof access.

Issued
Aug 25, 2026201 Mission St

Ref demo permit#: 202602055297. scope new concrete slb on grade, strucutural concrete, install pergola (separately) with footing. not include civil, mech, and electrical.

Issued
Aug 20, 20261 Front St

Repave (e) plaza @ market st entry w/stone. (n) planter & seating; repave 9e) entry @ front st w/stone; repave portion of sidewalk w/stone; (n) waterproofing extending into public right of way. (n) awning; (n) storefront doors & recessed entry; refurbish (e) stair door

Filed
Aug 4, 2026300 Mission St

6th fl - revision to 202512222450 installation of life safety seismic requirements for new (2) 1 person and (1) 2 person phone booths in an existing office total of 3 phone booths full restroom remodel included

Issued
Jul 24, 20261 Front St

Deferred submittal for mechanical, electrical, plumbing, food service. gr fl restaurant. ref 202605261845

Issued
Jul 15, 20261 Market St

1st fl: interior oly tenant improvement to construct new fitness center. mep deferred.

Filed
Jul 10, 20261 Market St

1st fl - interior ti of approx 10,500 sf of amenity space which includes a new event space

Filed
Jun 24, 2026150 California St

Replace 2 existing boilers with new condensing gas fire boilers located in the roof penthouse.

Issued
May 14, 2026300 Mission St

Ev charging stations w/structural support

Issued
May 11, 2026650 California St #0

12 flr: office t.i. including interior partitions, doors, finishes, ceiling, lights, millwork. seismic requirement for (9) new phone booths. mep deferred.

Issued
May 1, 20261 Market St

Ev charging station - basement level garage. restriping and add 4 ev charging stations. electrical and structural.

Filed
Apr 27, 2026101 02nd St

(ste# 350 / 3rd floor) revision to pa# 202603268312: work includes installation of 6 phone booths.

Issued
Apr 16, 20261 Market St

Floors: 31st to 43rd: installation of a 6 inch cold water riser between 31st-43rd story steel framed office tower

Filed
Apr 8, 2026300 Clay St #0

Installation of a mechanical service access platform and ladder in the street level fan room

Issued
Apr 8, 2026300 Clay St #0

26/f: replace the (e) general exhaust fan, ef-3, located on the 26th floor of one maritime plaza, with a 31,200 cfm variable - volume exhaust fan to increase tenant exhaust airflow capacity. the exhaust riser will be reused.

Complete
Apr 8, 20261 Market St

Exterior building maintanence unit replacement of existing. scope includes installation of anchor points on the roods of two office towers at spear and tower steuart.

Issued

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Edward Rivera? Request a correction.