CheckMyDesigner

Ehsan Yazdan Panah

Engineer · Aexsf Llc · San Francisco

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeStructural Engineer S-7067First issued Jun 17, 2022, expires Sep 30, 2028.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the BPELSG enforcement list on Nov 5, 2026.

Worked in San Francisco?
6 permits since 2023, 6 in the last 5 years. Latest filed Oct 2, 2026.
What kind of projects?
Home remodel 1 · Addition 1 · ADU 1
How long do their permits take?
Home remodel: within 1 month. City typical for the same review: within 1 month.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Home remodel: 1 permit in San Francisco

In 2023, latest filed May 4, 2023.

Time to get a permit

Theirs
Within 1 month
City
Within 1 month

Median from filing to permit, from 1 issued permit filed since 1966. City is the San Francisco median for the same kind of review, from 4,704 permits.

Where

  • Castro/Upper Market1
Permits
8 permits that name Ehsan Yazdan Panah, newest first, including 2 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Oct 2, 202649 Conrad St

New third floor with front and rear deck; renovation of existing second floor and extended deck; renovation of existing bonus room; and fully seismic retrofit.

Filed
Mar 24, 202611 Clarendon Av

(e) roof terrace renovation to include new door to terrace, railing, pavers and hot tub.

Issued
Dec 18, 202532 Cross St

Replace (e) window with (n) egress door, remove (e) unused water fountain in rear yard. remove existing shed in the rear yard.

Complete
Dec 1, 2025163 Moffitt St

Legalize 1st fl office to be converted to master bed. install new master closet & master bath at 1st fl. remove (e) wall between kitchen & living room. rehabilitate existing kitchen.

Complete
Jun 27, 2025192 Lisbon St

Convert ground floor storage into adu per state program. install new kitchen, new bath, new washer / dryer & 2 new bedrooms. (e) garage to remain. install new planter @ adu entry per adu requirement.

Approved
Sep 8, 2023253 States St

Revision to pa# 202305047077. relocate kitchen. remove (e) water heater & install (n) tankless water heater. install (n) bath at ground level. 25 c/y excavation. lower slab 2". new foundation.

Issued
Jun 27, 20231769 Fulton St

Revision to pa 2022-0804-9913 demo shed in backyard, replace with trash enclosure; plan/layout modifications. replace lighting. add moment frame accommodate facade changes

Complete
May 4, 2023253 States St

Relocate (e) kitchen to (e) dining room. non structural demo

Issued

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Ehsan Yazdan Panah? Request a correction.