Firas A Jandali
Engineer · Jedco Consulting Engineer · El Cerrito
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeStructural Engineer S-3031First issued Feb 26, 1988, expires Mar 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- 1 public board actionMar 4, 2011Final decision
Final Decision in Case No. 909-A Effective March 4, 2011
Source: BPELSG decision PDF, retrieved Nov 5, 2026
- Worked in San Francisco?
- 11 permits since 2005, 11 in the last 5 years. Latest filed Oct 26, 2022.
- What kind of projects?
- Deck, stairs or patio cover 4 · Home remodel 3 · Seismic retrofit or foundation 2
- How long do their permits take?
- Deck, stairs or patio cover: 2 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Deck, stairs or patio cover: 4 permits in San Francisco
Time to get a permit
Median from filing to permit, from 4 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 5,514 permits.
Where
- Pacific Heights1
- Noe Valley1
- Bernal Heights1
- Outer Richmond1
Most recent
- 1901 Franklin StRebuilding porch floor. porch is inclused removing the non-bearing wall to original. install guardrail. removing and installing 2 patio doors.Jun 8, 2022Reinstated
- 740 Grand View Av #0Guardrail replaceMar 22, 2022Complete
- 59 Mirabel AvIn-kind replacement of (e) damanged wood stairs and decks due to dry-rot.Nov 24, 2021Complete
- 3749 Clement StRear deck repair. replace wood railing and decking with (n) due to dryrot (less than 50%). front deck repair: replace (e) wood railing with (n). all new railing will be wood and glass; replace eero ladderFeb 26, 2021Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 26, 2022 | 226 Monterey Bl Voluntary foundation strengthening to perimeter footing at rear portion of structure. underpining approx 18 foot of footing (not on property line) Complete | Seismic retrofit or foundation | Complete | Within 1 month | |
| Aug 11, 2022 | 2409 29th Av Revision to pa# 202202188348. new second floor 6' opening. add drawing and calculation as per inspector request. Complete | Revision or supplement | Complete | Within 1 month | |
| Jun 8, 2022 | 1901 Franklin St Rebuilding porch floor. porch is inclused removing the non-bearing wall to original. install guardrail. removing and installing 2 patio doors. Reinstated | Deck, stairs or patio coverType unconfirmed | Reinstated | Within 1 month | |
| Mar 29, 2022 | 2119 29th Av 1- remodeling the existing dwelling and addition of 428 sq ft floor area as a new m. bedroom & m. bathroom at the garage level. 2- adding new junior adu (493 sq ft) to basement level (1 bedroom, 1 bathroom, living area, laundry and kitchen. Issued | ADU | Issued | 31 months | |
| Mar 22, 2022 | 740 Grand View Av #0 Guardrail replace Complete | Deck, stairs or patio cover | Complete | 7 months | |
| Nov 24, 2021 | 59 Mirabel Av In-kind replacement of (e) damanged wood stairs and decks due to dry-rot. Complete | Deck, stairs or patio cover | Complete | 3 months | |
| Aug 24, 2021 | 617 Minna St #0 Remodel (e) kitchens and bathrooms in all units. remove non load bearing walls. Complete | Home remodel | Complete | 2 months | |
| Jul 19, 2021 | 26 Del Monte St Remove all fire smoke damaged gyp bd, fixtures, framing, elec. replace all wiring, fixtures, gyp bd. resheath roof. new roofing material per plan new finishes at interior. Complete | Home remodelType unconfirmed | Complete | Within 1 month | |
| Feb 26, 2021 | 3749 Clement St Rear deck repair. replace wood railing and decking with (n) due to dryrot (less than 50%). front deck repair: replace (e) wood railing with (n). all new railing will be wood and glass; replace eero ladder Complete | Deck, stairs or patio cover | Complete | 2 months | |
| Sep 15, 2020 | 18 Shotwell St Addition of new moment steel frame & 2 shearwalls to suppport the approved passage way and voluntary lateral force-resisting system alterations. this is to support the path way that has been approved on site plan and on arch'l detail 2016-0624-0826 r1/r3 no other changes are being made. Complete | Home remodel | Complete | 8 months | |
| Mar 19, 2018 | 2598 43rd Av Soft story moment frame per sfebc chapter 4d, 2016 cebc appx a4 change out exterior stairs Complete | Seismic retrofit or foundation | Complete | Within 1 month | |
| Jun 21, 2005 | 1303 Polk St Building working and a storage area.serving counter,building a hood system. Expired | Commercial or tenant improvement | Expired | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Firas A Jandali? Request a correction.