Gary Stephenson Gee
Architect · Gary Gee Architects, Inc. · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-14060First issued Jun 2, 1983, expires Mar 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 189 permits since 2000, 189 in the last 5 years. Latest filed Oct 1, 2026.
- What kind of projects?
- Commercial or tenant improvement 73 · Other 40 · New building 29
- How long do their permits take?
- Commercial or tenant improvement: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 73 permits in San Francisco
Time to get a permit
Median from filing to permit, from 67 issued permits filed since 1966; 4 still in review. City is the San Francisco median for the same kind of review, from 18,907 permits.
Where
- Bayview Hunters Point19
- South of Market9
- Potrero Hill7
- Financial District/South Beach7
Most recent
- 2346 Lombard StGround floor: ti to existing space for studio retail.Jul 6, 2026Issued
- 1251 Connecticut StAdminstrative permit to change of use & occupancy group s-2 warehouse to group b. research and development with accessor office. no construction work.Apr 7, 2026Issued
- 1713 17th StNon-structural tenant improvement to existing office on existing mezzanine level.Dec 26, 2025Complete
- 1121 Howard StRemove entry door, side lights, and transom, fill entry side light and transom opening. install new entry door, remove plywood covering windows, remove non bearing patritions adjacent to 1st and 2nd fl windows, remove plywood covering windows on 1st fl.install security bars on entry windows.Dec 19, 2025Filed
- 1616 Pacific AvRemove existing restroom. install new accessible restroom with employee breakroom.Oct 28, 2025Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 15, 2026 | 1391 Vallejo St Revision to bpa: 202609117958 - addition of new condition space for 1391 and remodel (e) kitchen and stair. install new stair to roof deck for 1393 and remodel kitchen. Filed | Revision or supplement | Filed | — | |
| Oct 1, 2026 | 1125 A Revere Av Corrections for nov #: 202659151 - document field conditions and legalize 2nd floor. administrative change of use for first floor from u to f-1. Filed | Legalize or fix a violation | Filed | — | |
| Sep 28, 2026 | 2230 22nd Av Revision to work under construction permit #202609178306. remodel existing second floor of single family residence to add new bathroom and relocate stair to 1st floor. Issued | Revision or supplement | Issued | Within 1 month | |
| Sep 17, 2026 | 2230 22nd Av Remodel existing first floor of single family residence and convert 1st floor into habitable space. Issued | Home remodel | Issued | Within 1 month | |
| Sep 11, 2026 | 1391 Vallejo St Remodel units 1391/1393 addition f new bathroom. install new stair to basement connecting 1/f to unit 1931. amend 202608056148 remodel (e) kitchen/bath in both unit. Issued | Revision or supplement | Issued | Within 1 month | |
| Aug 27, 2026 | 2230 22nd Av Enclose existing lightwells on north and south property line walls Issued | OtherType unconfirmed | Issued | Within 1 month | |
| Jul 6, 2026 | 2346 Lombard St Ground floor: ti to existing space for studio retail. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Apr 7, 2026 | 1251 Connecticut St Adminstrative permit to change of use & occupancy group s-2 warehouse to group b. research and development with accessor office. no construction work. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Dec 26, 2025 | 1713 17th St Non-structural tenant improvement to existing office on existing mezzanine level. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Dec 24, 2025 | 38 Belcher St #1 Replace (e) fire escape in kind from roof to light courtyard Issued | Deck, stairs or patio cover | Issued | 4 months | |
| Dec 19, 2025 | 1121 Howard St Remove entry door, side lights, and transom, fill entry side light and transom opening. install new entry door, remove plywood covering windows, remove non bearing patritions adjacent to 1st and 2nd fl windows, remove plywood covering windows on 1st fl.install security bars on entry windows. Filed | Commercial or tenant improvement | Filed | — | |
| Oct 28, 2025 | 1616 Pacific Av Remove existing restroom. install new accessible restroom with employee breakroom. Issued | Commercial or tenant improvement | Issued | 3 months | |
| Oct 9, 2025 | 3231 16th St Document site conditions for approved site and addendum permit 2018-0807-6659 Complete | Revision or supplementType unconfirmed | Complete | Within 1 month | |
| Sep 30, 2025 | 1255 Connecticut St Ref 202412307485- ti for semi conductor business/office to inlcude (n) tables, equipment sesimic anchoring and locate gas lines on 1st floor. Issued | Commercial or tenant improvement | Issued | 1 month | |
| Sep 25, 2025 | 711 Scott St Window replacement: doors and windows on rear facade of building to be replaced in-kind Issued | Other | Issued | 2 months | |
| Sep 19, 2025 | 4411 Geary Bl T.i. ste# 100 & 200: change of use for ste# 100 only from massage to office. 1st/f: remodel e) bathroom into new accessible bathroom, install new non-bearing paritions & doors, relocate e) electric hot water heater. 2nd/f: install new non-bearing partitions & doors Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jul 22, 2025 | 1235 Connecticut St Change of use from s-2 warehouse to f-2 light manufacturing at first floor and b research and development at second floor. no construction. Complete | Commercial or tenant improvement | Complete | 2 months | |
| May 1, 2025 | 350 Frederick St Build one bedroom adu in the first floor storage area Issued | ADU | Issued | 6 months | |
| Apr 28, 2025 | 313 Ivy St Replace existing bar equipment with new like for like. replace bar counter. install new banquette. install power door operators. Issued | Commercial or tenant improvement | Issued | 2 months | |
| Mar 19, 2025 | 150 Eureka St Legalize 3 storage units into local adu's. no construction work. Complete | ADU | Complete | 3 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Gary Stephenson Gee? Request a correction.