Geoffrey Buenavista Lim
Architect · Innovation & Design In Arch · Orange
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-33396First issued Dec 21, 2011, expires Oct 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 14 permits since 2014, 14 in the last 5 years. Latest filed Jun 27, 2024.
- What kind of projects?
- Commercial or tenant improvement 12 · Home remodel 2
- How long do their permits take?
- Commercial or tenant improvement: 2 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 12 permits in San Francisco
Time to get a permit
Median from filing to permit, from 11 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 10,215 permits.
Where
- Financial District/South Beach8
- Hayes Valley1
- Pacific Heights1
- Inner Sunset1
Most recent
- 201 03rd StProp h: new remodel of (e) restaruant on the ground fl. demo of walls, doors, ceilings,interior/exterior.finishes,fixtures,casework,storfronts,(e)signage,mep systems,(n)interior front of fixures,bar,storefront,bar/grill equipment & exterior finishes.Jun 27, 2024Issued
- 1 Market StInterior ti of existing restaurant. no exterior work proposed. modify existing interio bar area, equpment and furniture. new low height partitions, new plumbing and electrical connections at the new bar area, and associated ada path of travel improvements as required.Jan 29, 2024Filed
- 1 Market StG/f: interior t.i. for new restaurant and (e) shell building. new fixtures, finishes, new (non-structural) partitions, (e) restrooom fixtures to remain, new finishes only. (e) kitchen will be modified inclkuding electrical/plumbing elements based on the updated kitchen design. new lighting, hvac.Jan 13, 2022Complete
- 88 Sutter StTenant improvement: a 650 sf addition to an (e) tenant space on the ground levelat 88 sutter street. work includes light gauge framing, new interior hvac ductwork and exhaust systems, interior electrical systems, interior finishes and interior furnishings. interior work only.Jan 12, 2021Issued
- 580 Hayes St#2- interior t.i. to consist of a new business space with supporting kitchen, public area & restroom. kitchen to include walk-in cooler with new mechanical, electrical & plumbing. public area to consist of millwork, furniture & hvac. new restroom supporting plumbing. modify (e) exterior awning.Dec 7, 2016Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Jun 27, 2024 | 201 03rd St Prop h: new remodel of (e) restaruant on the ground fl. demo of walls, doors, ceilings,interior/exterior.finishes,fixtures,casework,storfronts,(e)signage,mep systems,(n)interior front of fixures,bar,storefront,bar/grill equipment & exterior finishes. Issued | Commercial or tenant improvement | Issued | 15 months | |
| Jan 29, 2024 | 1 Market St Interior ti of existing restaurant. no exterior work proposed. modify existing interio bar area, equpment and furniture. new low height partitions, new plumbing and electrical connections at the new bar area, and associated ada path of travel improvements as required. Filed | Commercial or tenant improvement | Filed | — | |
| Dec 22, 2022 | 1 Market St Modify exterior patio. no change in interior occuant load. new furntiure/umbrellas for the (e) patio area and new folding doors between the patio and dining area. the new total occupant load is shown in egress plan. ref approved t.i. under 202201135898. Issued | Revision or supplement | Issued | 3 months | |
| Jan 13, 2022 | 1 Market St G/f: interior t.i. for new restaurant and (e) shell building. new fixtures, finishes, new (non-structural) partitions, (e) restrooom fixtures to remain, new finishes only. (e) kitchen will be modified inclkuding electrical/plumbing elements based on the updated kitchen design. new lighting, hvac. Complete | Commercial or tenant improvement | Complete | 4 months | |
| Dec 8, 2021 | 88 Sutter St 1/f: revision to pa# 2021-0112-2520. interior work only. changes to floor plan layouts,mechanical, plumbing & electrical work, fixtures. removal of demo scope within the (e) space. Complete | Revision or supplement | Complete | Within 1 month | |
| Jan 12, 2021 | 88 Sutter St Tenant improvement: a 650 sf addition to an (e) tenant space on the ground levelat 88 sutter street. work includes light gauge framing, new interior hvac ductwork and exhaust systems, interior electrical systems, interior finishes and interior furnishings. interior work only. Issued | Commercial or tenant improvement | Issued | 8 months | |
| Feb 7, 2017 | 90 New Montgomery St Revised t-24. revised add door hardware, panic bar and door closer. revision to pa# 201701278112. n/a maher ord. 155-13 Issued | Revision or supplement | Issued | Within 1 month | |
| Jan 27, 2017 | 90 New Montgomery St Revision to pa 2016-1116-2828 - remove restroom wall, updated equipment specs, added light fixtures, material specification updated, revised rcp, re-sized water heater Complete | Revision or supplement | Complete | Within 1 month | |
| Dec 7, 2016 | 580 Hayes St #2- interior t.i. to consist of a new business space with supporting kitchen, public area & restroom. kitchen to include walk-in cooler with new mechanical, electrical & plumbing. public area to consist of millwork, furniture & hvac. new restroom supporting plumbing. modify (e) exterior awning. Complete | Commercial or tenant improvementType unconfirmed | Complete | 2 months | |
| Nov 23, 2016 | 220 Montgomery St Revision to 201609288956: layout changes, maher na Issued | Revision or supplement | Issued | 1 month | |
| Nov 16, 2016 | 90 New Montgomery St Revision to 201608154959, interior t.i. of (e) coffee shop; new ceilings and change to back of house layout Issued | Revision or supplement | Issued | 1 month | |
| Nov 10, 2016 | 2201 Fillmore St T. i. an ice cream shop from former evolution fresh (limited restaurant), no added square footage, no change of use, no change in occupancy type. add kitchen, new electrical plumbing work, new awning. Complete | Commercial or tenant improvement | Complete | 2 months | |
| Nov 8, 2016 | 1266 09th Av Interior renovation t.i. for cafe. new partitions, ceilings, lighting, kitchen equip & food service line, finishes. reuse (e) mechanical system. (non structural) fire supression, fire alarm & signage under separate permits. Complete | Commercial or tenant improvement | Complete | 2 months | |
| Oct 14, 2016 | 16 West Portal Av Minor interior revisions to approved permit #201606099531. revisions to food service line and related electrical/lighting. no change to accessible features. Complete | Revision or supplement | Complete | Within 1 month | |
| Sep 28, 2016 | 220 Montgomery St Suite #144/148- revision to existing pa#201607182584, interior changes from existing permit: architecture, mechanical, plumbing, electrical changes. n/a #155-13 Issued | Revision or supplement | Issued | 3 months | |
| Sep 1, 2016 | 300 Main St (n) grocery store 9,433 sq ft on street level retail & service Complete | Commercial or tenant improvement | Complete | 6 months | |
| Jul 22, 2016 | 580 Mcallister St #0 Interior remodel apt 410: non structural alteration, relocate kitchen, remodel (e) bathroom, provide one new bedroom; (2) new bedrooms. Complete | Home remodel | Complete | Within 1 month | |
| Jun 8, 2016 | 16 West Portal Av Non structural interior demolition of fixtures, finishes, light fixtures, kitchen equipment. accessibility features will be provided in subsequent building permit per sfbc ab-017. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Mar 2, 2016 | 1 California St Add & relocate fire sprinklers per ti (8 add) (5 relocate) ground floor. ref 2015-1103-1533. maher na Complete | Revision or supplement | Complete | Within 1 month | |
| Jan 7, 2016 | 781 Mission St Interior demo only. bldg permit under seperate permit being reviewed. Complete | Commercial or tenant improvement | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Geoffrey Buenavista Lim? Request a correction.