CheckMyDesigner

Geoffrey Daniel Bomba

Engineer · Oakland

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeStructural Engineer S-5455First issued Jan 14, 2010, expires Sep 30, 2027.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the BPELSG enforcement list on Nov 5, 2026.

Worked in San Francisco?
5 permits since 2020, 5 in the last 5 years. Latest filed Jun 17, 2025.
What kind of projects?
Commercial or tenant improvement 3 · Other 2
How long do their permits take?
Commercial or tenant improvement: within 1 month. City typical for the same review: within 1 month.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Permits
5 permits that name Geoffrey Daniel Bomba, newest first. Select a permit to see the full record.
FiledProjectOpen
Jun 17, 2025151 03rd St

Install structural strongbank support and ceiling monorailtrack in level 7 temp. exhibit gallery to support movable exhibit wall panels; const. & installation of movable wall panels; const. of temporary wall panels. scope only applies to layout on a2.2. additional changes require separate permit(s).

Complete
Oct 3, 20231800 Owens St

New condenser water unit & new vfd's on sector 1 roof with associated structural support. chilled water piping from new condenser unit will run in an existing shaft down to level 1. no architectural work proposed. all work is mep w/ structural.

Filed
Aug 18, 20231800 Owens St

Mechanical & electrical work only to convert sector 1 & 3 service elevator to transport hazardous materials.

Complete
Jan 12, 2021828 Brannan St

Interior walls and floor slab. new two story ground up base. building including exterior facade, elevator, stairs, and restrooms. renovation to (e) 2 story & mezzanine. rmove an interior mezzanine horizontally & vertically expand the 2nd floor & undertake interior & exterior

Complete
Jan 24, 2020200 Larkin St

Construction of a temporary art installation w/in an (e) gallery space. work include temporary partitions, floor & ceiling finishes and modifications to (e) air conditioning and lighting systems

Complete

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.