Heather Rae Hart
Architect · Samaha & Hart Architecture · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-31257First issued Aug 22, 2007, expires Oct 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 13 permits since 2007, 13 in the last 5 years. Latest filed Aug 6, 2026.
- What kind of projects?
- Home remodel 7 · Addition 4 · Commercial or tenant improvement 1
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 7 permits in San Francisco
Time to get a permit
Median from filing to permit, from 7 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 8,860 permits.
Where
- West of Twin Peaks2
- Twin Peaks2
- Pacific Heights1
- Sunset/Parkside1
Most recent
- 1716 BroadwayBuilding exterior: replace some (e) windows, re roof and paint, add new guardrails. level 1: expand existing habitable space, remodel an existing bathroom and add a kitchenette (2-burner), laundry closet and deck. level 2/3: remodel existing kitchens and bathrooms, add laundry closetAug 6, 2026Issued
- 171 Westmoorland DrKitchen remodel down to the studs to include new plumbing, electrical and finishesJul 3, 2025Complete
- 340 Urbano DrAddition of insulation and gypsum wallboard to ceiling of (e) garage. replace (e) 2 furnaces. remodel (e) kitchen and (e) bathroom. relocate (e) bathroom. replace (e) aluminum windows at living room and kitchen with wood windows.Mar 3, 2021Complete
- 183 Saint Germain AvInterior remodel of existing single family residence: remodeling existing kitchen, powder room & bar. remodeling (e) master bath, addition of 2 skylights.Jul 1, 2015Issued
- 254 Dellbrook AvInt remodel of (e) sfd-adding a new bathroom at ground level & upgrading 9e) laundry room. work on upper level include reconfiguring closets & remodeling (e) bathroom to create a master suiteJul 23, 2013Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Aug 6, 2026 | 1716 Broadway Building exterior: replace some (e) windows, re roof and paint, add new guardrails. level 1: expand existing habitable space, remodel an existing bathroom and add a kitchenette (2-burner), laundry closet and deck. level 2/3: remodel existing kitchens and bathrooms, add laundry closet Issued | Home remodelType unconfirmed | Issued | 1 month | |
| Jul 3, 2025 | 171 Westmoorland Dr Kitchen remodel down to the studs to include new plumbing, electrical and finishes Complete | Home remodel | Complete | 2 months | |
| Mar 31, 2025 | 137 Beulah St G/f:new bedrm,family rm,bath,laundry and closet.new foundation & slab.2/f:remodel/reconfig (e) kitchen, bath,media rm,dining rm, and new stairs.replace (e) deck & stairs at rear.3/f: remodel (e) bath and reconfig closets in bedrm.front:replace (e)wood sashes to match (e). Triage | Addition | Triage | — | |
| Feb 7, 2025 | 1650 Great Hy Rear bldg-revision to pa# 202102023860: heat pump removed & replaced w/ radiant floor heating system. Complete | Revision or supplement | Complete | Within 1 month | |
| Mar 3, 2021 | 340 Urbano Dr Addition of insulation and gypsum wallboard to ceiling of (e) garage. replace (e) 2 furnaces. remodel (e) kitchen and (e) bathroom. relocate (e) bathroom. replace (e) aluminum windows at living room and kitchen with wood windows. Complete | Home remodel | Complete | 3 months | |
| Nov 6, 2017 | 646 03rd Av Horizontal addition @ rear yard of 1-fam dwelling. addition includes excavation at lvl 1 to create a family rm, new bath, laundry & rear yard patio. a new interior stair connects 1st & 2nd lvls. lvl 2 includes a remodeled kitchen & powder rm, new deck & interior stairs to rear yard. lvl 3 includes a Complete | Addition | Complete | 13 months | |
| Jul 6, 2016 | 707 03rd Av Horizontal addition at the rear yard of a 1 fam dwg. additional sq footage added at level one, 2 & 3 new fam rm & bath at level 1. new exterior stair from level 2 to back yard. new master suite level 3, relocate (e) powder room at level 2 Complete | Addition | Complete | 8 months | |
| Nov 4, 2015 | 790 Funston Av Removing & replacing exterior stairs at rear yard, new fences at rear & side years. remodel (e) powder room & (e) bathroom, replace 2 windows Complete | Deck, stairs or patio coverType unconfirmed | Complete | 8 months | |
| Jul 1, 2015 | 183 Saint Germain Av Interior remodel of existing single family residence: remodeling existing kitchen, powder room & bar. remodeling (e) master bath, addition of 2 skylights. Issued | Home remodel | Issued | Within 1 month | |
| Jul 23, 2013 | 254 Dellbrook Av Int remodel of (e) sfd-adding a new bathroom at ground level & upgrading 9e) laundry room. work on upper level include reconfiguring closets & remodeling (e) bathroom to create a master suite Complete | Home remodel | Complete | Within 1 month | |
| Jul 2, 2013 | 235 Valdez Av Interior remodel of (e) single family residence: remodel to (e) kitchen & structural foundation upgrade to one (e) post in basement. remove 1 (e) window, not visible from street; install beam & posts at kitchen bearing wall removal & continue posts to new footings. Complete | Home remodel | Complete | Within 1 month | |
| Jun 18, 2013 | 1306 04th Av #0 Interior remodel of extg kitchen adding washer and dryer to extg storage room. Complete | Home remodel | Complete | Within 1 month | |
| Apr 30, 2012 | 360 09th Av Remodel e 650 sf storage room located in basement, below preschool, new storage room includes 5 closets, new countertops, new cabinets with a sink, installation of washer/dryer, elec wall heaters, new lighting, finish floor Issued | Commercial or tenant improvement | Issued | 3 months | |
| May 15, 2007 | 3767 23rd St Remodel & addition to an existing home, horizontal addition at rear which includes a deck, remodel interior includes relocate kitchen & 2 baths, g/f remodeling includes a new family room, bath, wetbar & bedroom. Expired | Addition | Expired | 7 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Heather Rae Hart? Request a correction.