Jace Garth Levinson
Architect · Jace Architecture · Oakland
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-23075First issued Feb 27, 1992, expires Nov 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 56 permits since 2000, 56 in the last 5 years. Latest filed Dec 18, 2024.
- What kind of projects?
- Home remodel 17 · Commercial or tenant improvement 10 · Addition 9
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 17 permits in San Francisco
Time to get a permit
Median from filing to permit, from 17 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 4,704 permits.
Where
- Noe Valley4
- Western Addition2
- West of Twin Peaks2
- Nob Hill2
Most recent
- 587 47th AvRemodel kitcen and bath @ upper leve w/ new finishes & fixtures. new door & window replacement @ indoor lightwell (not visible from st). new window sash replacement @ front (existing window frame & trim not change)Feb 7, 2023Complete
- 1042 Sanchez St #0Remodel kitchen, add new property line window.Nov 9, 2016Complete
- 2740 Union StRemdoel existing room at basement to create 2 new bedrooms, and 1 ful bath. project includes all new finihses, new windows and doors, new slabDec 16, 2013Complete
- 734 San Jose AvInterior remodel to existing 2/f, new kitchen and bathrooms, new roof framing and reinforcement.Aug 20, 2013Complete
- 1 Daniel Burnham Ct #1602Interior remodel of ste 1602, with finishes and fixtures project includes a new kitchen, new bathroom, and new lighting througout. walls to be removed at kitchen are non load bearing.Jan 24, 2013Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Dec 18, 2024 | 4131 Balboa St Remove (e) rear deck and stair and build (n) deck at both 4131 and 4133 balboa st Complete | Deck, stairs or patio cover | Complete | Within 1 month | |
| Sep 20, 2024 | 4133 Balboa St Demolish existing storage room at rear yard grade level. storage space is accessed from rear yard only and is not part of either dwelling unit. building shall revert to origianal configuration. Complete | Other | Complete | Within 1 month | |
| Aug 21, 2024 | 1139 Bay St Replace (12) alum windows at front facade at second and third floors with new wood insert windows. no change to openings or exterior trim. at 1141 bay st (top floor) remodel kitchen, remodel 1/2 bath. Complete | Other | Complete | Within 1 month | |
| Apr 11, 2024 | 3515 Fillmore St Revision to 202209093733: change to ground fl plan to included new half bath w/ sink & toilet in common area garage. unit a & b layout change Issued | Revision or supplement | Issued | 1 month | |
| Nov 8, 2023 | 4131 Balboa St Legalize(e)rear yard storage room @ grade,situated one level below main entry on balboa st.the space has access from the rear yard only and is not part of any dwellin unit.space is 124 square feet with an average head height of 7"4". Filed | Legalize or fix a violation | Filed | — | |
| Feb 7, 2023 | 587 47th Av Remodel kitcen and bath @ upper leve w/ new finishes & fixtures. new door & window replacement @ indoor lightwell (not visible from st). new window sash replacement @ front (existing window frame & trim not change) Complete | Home remodel | Complete | Within 1 month | |
| Dec 20, 2021 | 127 08th Av Remodel front and rear facades with new windows, doors, siding and trim. demolish existing rear breakfast room and full bath at 2nd fl, and constuct new breakfast room, full bath, exterior deck and stairs to grade. project also includes interior remodel of kitchen. Complete | AdditionType unconfirmed | Complete | 12 months | |
| Feb 12, 2021 | 264 28th St Revision to pa #201904097477 - 5 new windows at rear of house along the side, not visible from street. new hot water radiant heating in floor for new addition, rather than using (e) forced air furnace. remove a closet and enlarging a bathroom. new guardrail for roof deck, not visible Complete | Revision or supplement | Complete | 6 months | |
| Sep 9, 2020 | 3515 Fillmore St Remodel ground fl at rear of garage to create two new adu's per ordiance 162-6 add access hallway from main entry & (n) posts/bm at garage parking areas. unit a is 495 sf. unit b is 700 sf. unit a is formed from the existing space at the lower level of current unit #107.**maher n/a** Issued | ADU | Issued | 38 months | |
| Apr 9, 2019 | 264 28th St Addition of a new stairhall on 23st side of the building to access new habitable space @ the ground floor consisting of family room, family room alcove & full bathroom. new roof deck on top family room. Complete | Addition | Complete | 6 months | |
| Aug 31, 2017 | 325 Mississippi St Demolish (e) rear exterior stair and replace in kind. Complete | Deck, stairs or patio cover | Complete | Within 1 month | |
| Apr 26, 2017 | 14 White St Remodel (e) 1st & 2nd flr. add (n) 3rd story. home shall be (2) bedrooms, 2.5 baths, living, dining, kitchen & (2) car tandem garage. Complete | Addition | Complete | 22 months | |
| Jan 17, 2017 | 1209 Shrader St New exterior deck @ rear of property approx 4'6" above grade, and new single french door to replace existing window. Issued | Deck, stairs or patio cover | Issued | 7 months | |
| Nov 9, 2016 | 1042 Sanchez St #0 Remodel kitchen, add new property line window. Complete | Home remodel | Complete | Within 1 month | |
| Aug 4, 2016 | 1631 Chestnut St Remodel (e) rear portion of ground floor to create new one bedroom one bath dwelling unit. ref pa (soft story) 201508033119 Complete | ADU | Complete | 15 months | |
| May 4, 2016 | 25 Alvarado St Construct new deck @second floor dwelling unit. see variance case 2014.1591v. comply w/n.o.v. 201558351 Complete | Legalize or fix a violation | Complete | 4 months | |
| May 4, 2016 | 23 Alvarado St Legalize (e) unpermitted dwg unit @rear of property. add striping to driveway, provide 1 hr fire prot. @front building along exit pathway. comply with conditions of approval on variance case 2014.1591v & conditional use 20141591cv Withdrawn | Legalize or fix a violation | Withdrawn | — | |
| Jan 13, 2016 | 402 Jackson St The project involves converting an extg office on the 2nd floor to a kitchenette with new sink, dw, & ref. at 3rd floor an extg kitchenette will be remodeled and enlarged with the addition of an adjacent closet. n/a for maher. Complete | Commercial or tenant improvement | Complete | 1 month | |
| Dec 21, 2015 | 3989 24th St Commercial tenant improvement gr fl to create fitness studio. includes new unisex restroom. includes removal of post and new structural beam. new hvac unit Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Dec 17, 2014 | 190 Emmet Ct Front building: to comply with physical report #cc-7698, remove of decks and unpermitted unit in attic. legalize (2) skylights, add new attic access hatch. Complete | Legalize or fix a violation | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Jace Garth Levinson? Request a correction.