Jahandar Yadegar
Engineer · John Yadegar Structural Eng. · Oakland
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeStructural Engineer S-2871First issued Mar 21, 1986, expires Dec 31, 2026.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 176 permits since 2001, 176 in the last 5 years. Latest filed Jul 15, 2025.
- What kind of projects?
- Seismic retrofit or foundation 75 · Home remodel 46 · Addition 16
- How long do their permits take?
- Seismic retrofit or foundation: 3 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Seismic retrofit or foundation: 75 permits in San Francisco
Time to get a permit
Median from filing to permit, from 71 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 5,514 permits.
Where
- Glen Park8
- Marina6
- Outer Richmond6
- Russian Hill5
Most recent
- 1145 Green St #1Voluntary seismic strengthing.Jan 18, 2022Complete
- 168 Palm AvSeismic strengthening to comply with sf soft story ordinance design per iebc appendix a-4.May 20, 2021Complete
- 567 Sanchez StThe project involves a small length of foundation to be underpinned as part of foundation work and neighboring property, 561 sanchez st. ref bpa#202012140963Feb 25, 2021Cancelled
- 1018 Valencia St1018 valencia - voluntary upgrades to vacant ground fl commercial tenant space including demolition of non-conforming mezzanine; upgrade of restroom & entry for ada-compliance; repair & replacemtn of windows, door, & interior stairs. 1018-1020 valencia - voluntary soft story upgrade.Dec 26, 2019Complete
- 307 03rd AvSeismic strengthening measures to comply with sf soft story ordinance. design per iebc app a4 (residential)Nov 29, 2018Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 5, 2025 | 1133 Fell St Revision to pa #202507150822 addiitonal and remove and replace the dryrotted beam with the same and modify foundation to accept the column's base plate in the garage. Complete | Revision or supplement | Complete | Within 1 month | |
| Jul 15, 2025 | 1133 Fell St Replacement of 4 damaged wood posts with steel at rear of building in common area at rear of garage Complete | Home remodel | Complete | Within 1 month | |
| Jun 24, 2022 | 1145 Green St #1 Revision to 202201186135. new grade beam detail, new footing detail, no change in scope. Complete | Revision or supplement | Complete | Within 1 month | |
| Feb 23, 2022 | 561 Sanchez St New gate at front entry. Complete | Deck, stairs or patio coverType unconfirmed | Complete | 3 months | |
| Jan 20, 2022 | 1490 Willard St Revision to pa 2021-1209-4035 & 2021-0309-6206 include replacement of deck @ 2nd fl & updating the steel strong wall toward strong wall @ 2nd fl along grid line h & g Issued | Revision or supplement | Issued | Within 1 month | |
| Jan 18, 2022 | 1145 Green St #1 Voluntary seismic strengthing. Complete | Seismic retrofit or foundation | Complete | Within 1 month | |
| Dec 15, 2021 | 1056 Sanchez St Revision to pa #201901291543 to remove walls between kitchen and the additions and adding a powder room and a laundry room. Complete | Revision or supplement | Complete | Within 1 month | |
| Jul 2, 2021 | 1490 Willard St Revision to app#202012020076. add plywood to cripple wall and replace hand dug with drilled piers. Issued | Revision or supplement | Issued | Within 1 month | |
| May 20, 2021 | 168 Palm Av Seismic strengthening to comply with sf soft story ordinance design per iebc appendix a-4. Complete | Seismic retrofit or foundation | Complete | Within 1 month | |
| Apr 26, 2021 | 468 Jersey St New internal stair from 2nd to 1st fl. remodel existing powder room, relocate laundry & sink. Issued | Home remodel | Issued | Within 1 month | |
| Apr 14, 2021 | 23 Baker St Revision to pa# 201905029521. foundation design change. Complete | Revision or supplement | Complete | 4 months | |
| Mar 9, 2021 | 1490 Willard St Interior remodel all floors including adding (1) bedroom. lowering rear half of 1st floor. wood floor assembly & removing stair @ rear yard. Issued | Addition | Issued | 7 months | |
| Feb 25, 2021 | 567 Sanchez St The project involves a small length of foundation to be underpinned as part of foundation work and neighboring property, 561 sanchez st. ref bpa#202012140963 Cancelled | Seismic retrofit or foundation | Cancelled | Within 1 month | |
| Feb 18, 2021 | 549 Jersey St Renovation of existing 200 sqft shed in rear yard. permitted and constructed in 1942. remove existing full bath & provide new half bath & wet bar to confirm to zoning administrator bulletin #1. all work at main dwelling under pa# 201812188681. Complete | Home remodelType unconfirmed | Complete | 3 months | |
| Jan 22, 2021 | 530 Lake St #0 Reinforcement of bay windows Complete | Home remodel | Complete | 1 month | |
| Jan 6, 2021 | 36 Parnassus Av Construction of (n) staircase to connect rooms down at 1st fl to 2nd fl through interior of unit. Issued | Home remodelType unconfirmed | Issued | Within 1 month | |
| Dec 23, 2020 | 1871 43rd Av Convert part of garage into conditioned space - add bedroom, bathroom, family room. remove 1 stair. remodel 2nd flr bathroom- replace fixtures and finishes. restore front yard landscaping and permeable surface Complete | Home remodelType unconfirmed | Complete | 2 months | |
| Dec 14, 2020 | 561 Sanchez St G/f: lower (e) slab to 8ft, add conditioned space within building footprint (master bdrm,bath,closet); relocate stairs. upper floor:relocate (e) bathroom, add powder room, new kitchen finishes. Complete | Home remodelType unconfirmed | Complete | 3 months | |
| Aug 15, 2020 | 1522 Howard St Application for adu in existing ground floor space. new work to include new kitchen, remodel of existing bathroom, and new doors and window out to rear yard. mep, and any required title 24 calcs, permitted separately. per ord 162-16. Complete | ADU | Complete | 14 months | |
| May 13, 2020 | 2541 Washington St #0 1st flr - repairs due to flood damage. remodel kitchen and bathroom. Complete | Home remodel | Complete | 5 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Jahandar Yadegar? Request a correction.