Jaime Neilson
Engineer · Jaime Neilson, P.E., S.E · Fremont
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeStructural Engineer S-5125First issued Jan 25, 2008, expires Jun 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 35 permits since 2017, 35 in the last 5 years. Latest filed Jan 31, 2024.
- What kind of projects?
- Seismic retrofit or foundation 15 · Home remodel 8 · Legalize or fix a violation 5
- How long do their permits take?
- Seismic retrofit or foundation: 2 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Seismic retrofit or foundation: 15 permits in San Francisco
Time to get a permit
Median from filing to permit, from 15 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 10,218 permits.
Where
- Mission6
- Bernal Heights4
- Hayes Valley1
- Russian Hill1
Most recent
- 964 Oak StVoluntary seismic strengthening in garage story- new plywood shear wall.Oct 5, 2023Complete
- 1130 Filbert St #1Voluntary seismic stregnthening of ground floor shear walls/foundations, 2/f deck structure. work in common area & ground floor.Sep 16, 2022Complete
- 2676 Folsom StAt 2680-2682 folsom street, voluntary lateral force-resisting system alteration of cripple walls and attachments to foundations. at 2676-2678 folsom street, voluntary lateral strengthening of exterior stairs.Oct 23, 2020Complete
- 3225 24th StVoluntary seismic upgrade of the ground floor (garage level) of the building per the requirements of ab-094 in order to allow for two adus to be constructed on the ground floor level. adus construction has been submitted as permit application 202006158748.Aug 27, 2020Complete
- 3158 Mission St #0Voluntary seismic retrofit of first story and ada improvements n/a maherFeb 20, 2020Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Feb 17, 2026 | 2339 Jones St Revision to retaing wall along the side property line in the back yard. (pa #202312072076) 9 feet above grade max. Complete | Revision or supplement | Complete | Within 1 month | |
| Jan 31, 2024 | 1130 Filbert St #1 Legalize (e) trellis structure to comply with nov# 202312622. Filed | Legalize or fix a violation | Filed | — | |
| Jan 31, 2024 | 1138 Filbert St Legalize (e) trellis structure to comply with nov# 202312622 Withdrawn | Legalize or fix a violation | Withdrawn | — | |
| Dec 7, 2023 | 2339 Jones St To comply with notice of violation nov 202313934. remove and rebuild existing retaining wall along the side property line in the backyard. Complete | Legalize or fix a violation | Complete | 20 months | |
| Oct 5, 2023 | 964 Oak St Voluntary seismic strengthening in garage story- new plywood shear wall. Complete | Seismic retrofit or foundation | Complete | Within 1 month | |
| Aug 1, 2023 | 528 Natoma St All 4 units: demolition to studs. remodel remaining portion of interior not coverd under pa 202307061599. add tankless water heater. rebuild closets. replace front windows in kind with wood double hung with ogees. seismic strengthening per sfebc 503.11.1. Complete | Revision or supplement | Complete | 2 months | |
| Jun 1, 2023 | 1130 Filbert St #4 Replace in-kind existing roof top deck structure, existing deck under pa# 437142 & 8902558 Complete | Deck, stairs or patio coverType unconfirmed | Complete | Within 1 month | |
| May 18, 2023 | 3035 22nd Av Revision to bpa#202206166516, add new fixed skylight installed w/in (e) roof framing, new parapet adjcent to skylight. Complete | Revision or supplement | Complete | Within 1 month | |
| May 4, 2023 | 300 Ocean Av Revision to bpa#202301099856, replace wood framing @ facade & windows facing street Complete | Revision or supplement | Complete | 6 months | |
| Feb 17, 2023 | 528 Natoma St Voluntary seismic strengthening of ground flr- new shear walls and foundations, voluntary structural repairs to exterior rear decks and staircase, to comply w/nov# 201979391, remove roof covering at rear deak area.to comply w/nov# 201802811, provide heat. to comply w/nov# 201947472 provide hot water Complete | Legalize or fix a violation | Complete | 5 months | |
| Sep 16, 2022 | 1130 Filbert St #1 Voluntary seismic stregnthening of ground floor shear walls/foundations, 2/f deck structure. work in common area & ground floor. Complete | Seismic retrofit or foundation | Complete | 4 months | |
| Jul 8, 2022 | 3035 22nd Av Reconfigure int walls and 1 year yard facing ext wdw and 1 door opening.demo (e) stair serving door to rear yard that is being removed and install (n) 42in high guardrail w/ 1in rails that are no more than 4in apart at the ext side of (n) in-swing french doors that are being installed.1 solar tube Complete | OtherType unconfirmed | Complete | Within 1 month | |
| Mar 18, 2022 | 427 Edinburgh St Construct new deck at rear wall. convert (e) window to new door for access to new deck. replace 4 rear yard windows. replace rotted siding with new siding. Complete | Deck, stairs or patio cover | Complete | 4 months | |
| Nov 22, 2021 | 427 Edinburgh St Removal of interior load bearing wall between kitchen & dining room on 1st story. raise height of hallway opening into kitchen. remodel kitchen. Complete | Home remodel | Complete | Within 1 month | |
| Aug 11, 2021 | 2676 Folsom St Remove interior walls and reloc/replace with post and beams in units 2678b, 2678a, 2676b. Complete | Home remodel | Complete | Within 1 month | |
| Jun 2, 2021 | 566 Natoma St #0 Priority: renovate (e) 1st floor unit and convert portion of (e) laundry and storage space into (n) habitable space. Complete | Home remodel | Complete | 12 months | |
| Jun 2, 2021 | 566 Natoma St #0 Priority: mandatory soft story retrofit designed to requirements of 2019 california building code appendix a4. to comply with nov #201992704. Complete | Legalize or fix a violation | Complete | 4 months | |
| Mar 17, 2021 | 2272 17th Av Expand kitchen & breakfast room into (e) lightwell at 2nd fl & remodel. remodel half bath & full bath. replace windows in kind with double glazed custom wood windows or marvin clad exterior + wood interior windows. Complete | Home remodel | Complete | 2 months | |
| Oct 23, 2020 | 2676 Folsom St At 2680-2682 folsom street, voluntary lateral force-resisting system alteration of cripple walls and attachments to foundations. at 2676-2678 folsom street, voluntary lateral strengthening of exterior stairs. Complete | Seismic retrofit or foundation | Complete | 5 months | |
| Sep 12, 2020 | 3254 23rd St #0 1. remove and rebuild in kind exterior stair structure from the ground floor to second floor. 2. voluntary structural improvements to exterior stair framing. Complete | Deck, stairs or patio cover | Complete | 2 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Jaime Neilson? Request a correction.