CheckMyDesigner

Javed Jaffarali Tharani

Engineer · Nabi Construction · Alameda

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeCivil Engineer C-57676First issued Jul 18, 1997, expires Dec 31, 2027.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the BPELSG enforcement list on Nov 5, 2026.

Worked in San Francisco?
53 permits since 2004, 53 in the last 5 years. Latest filed Oct 6, 2026.
What kind of projects?
Seismic retrofit or foundation 32 · Home remodel 5 · Commercial or tenant improvement 4
How long do their permits take?
Seismic retrofit or foundation: 1 month. City typical for the same review: 5 months.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Permits
71 permits that name Javed Jaffarali Tharani, newest first, including 18 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Oct 6, 20262100 Pine St

Remove (e) wood bearing wall and provide (n) beam & (n) columns at grid lines 4 at 3rd fl. provide (n) wood shear wall panels @ grid line a,b & d at 1st fl. provide (n) wood beam for window opening at gridline 1 at 2nd & 3rd fl.

Issued
Sep 4, 2026250 El Camino Del Mar

Mod & replace ext finishes - replace windows and skylight. infill at 2 terraces on 3/f. n/s 2/f - infill patio under overhang. mod front bay. at roof terrace provide (n) w/p membrane, new ceramic paves on pedestals,(n) railings. add sauna & laundry. ab-112

Filed
Jul 8, 20262001 Fillmore St

@ e uft shaft @ ground fl: remove e lift. remove e wood post @ lift area. provide new steel columns, n steel columns, new beam at 2nd fl. new lift by others.

Issued
Feb 24, 20261729 Polk St #0

G/f: demo (e) portion of 1/f courtyard and replace with new floor. remove portion of (e) concrete topping and replace with new topping as shown on plan. deck is for residential use only.

Complete
May 21, 20251650 Jones St #0

Mandatory soft story retrofit in accordance with city ordinance 66-13, following 2022 cebc chapter 4d and appendix a-4.

Complete
Jul 26, 2024900 Pine St

Revision to pa # 202407106178: at gridline 2: remove (e) wood wall between 1/f & 2/f, provide new beam at 2/f w/ new post and footing.

Complete
Jul 11, 2024565 Chenery St

Legalize a 2-story, 246 sq. ft. +/-, rear yard-facing addition to a sfr that was built without a permit, perform sterngthening of existing vertical and lateral force resisting elements to be in compliance with current building code requirements.

Complete
Jun 24, 2024160 Noe St

Remodel kitchen and bath at unit 160. reconfigure closets and interior partitions, open wall between kitchen and living area. remodel kitchen and bath at unit 162. reconfigure closets and interior partitions, open wall between kitchen and living area

Complete
Apr 23, 20241350 Washington St

1) remove portion extg damaged retaining wall and replace with new pour in place concrete retaining wall at grid line a. 2) remove extg damaged footing and replace with new pour in place concrete footing at grid line b

Complete
Dec 11, 2023808 Cabrillo St

Structural stengthening of existing building (voluntary).

Complete
Dec 4, 20232660 Webster St

Remove (e) damaged 5 ft height retaining wall with new pour in place concrete retaining wall at grid line a.

Complete
Jul 7, 2023332 Presidio Av

Provide new concrete wall panel to strenghten existing damage retaining wall to comply with nov 202200131

Complete
Jun 29, 20233263 Mission St

To comply w/ nov #202304518 remove (e) illegal additon at back of building. inatall resilient channel 5/8 dej wall over e) plastered ceiling for sound @ 3265 mission. horizontal addition under pa2015-1118-3037 to be recognized by planning

Complete
Dec 12, 2019830 Hayes St

Revision to app#201907095444 for soft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4. revision at moment frames and relocate shearwall from line 1 to line 1.3

Complete
Dec 12, 2019801 Haight St

Soft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4.

Complete
May 20, 201943 Buena Vista Tr

Interior remodel and minor extg improvement incl. increase with of gargae, door, nw int. stair, replace extg windw, kitchen remodel, bathroom remodel, nw laundry room, addition at basement & 1st fl., demo of exterior & interior stair in non-shared lightwell (south side of bldg)

Complete
Sep 13, 2018695 33rd Av #0

Commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 201809130147

Complete
Jun 14, 2018160 10th St

1) revision to app#201803234524. 2)provide new gas meter room. 3)replace extg roll up door at south wall. 4)relocate accessible bathroom.

Complete
Nov 3, 20171250 Vallejo St #0

Revision to pa 2017-0621-0010 & 2017-1013-1222 - shift steel frame @ line 1; revise shear walls

Complete
Sep 22, 20171429 Valencia St

Rev to pa#201609289070: replace (e) front windows @ grid line (6). demo (e) wood siding, barn door & provide (n) store front @ g.l. (6) . reconfigure accessible restrooms. n/a maher

Complete

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Javed Jaffarali Tharani? Request a correction.