Javed Jaffarali Tharani
Engineer · Nabi Construction · Alameda
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeCivil Engineer C-57676First issued Jul 18, 1997, expires Dec 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 53 permits since 2004, 53 in the last 5 years. Latest filed Oct 6, 2026.
- What kind of projects?
- Seismic retrofit or foundation 32 · Home remodel 5 · Commercial or tenant improvement 4
- How long do their permits take?
- Seismic retrofit or foundation: 1 month. City typical for the same review: 5 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Seismic retrofit or foundation: 32 permits in San Francisco
Time to get a permit
Median from filing to permit, from 32 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 642 permits.
Where
- Russian Hill6
- Nob Hill5
- Mission5
- Outer Richmond3
Most recent
- 1650 Jones St #0Mandatory soft story retrofit in accordance with city ordinance 66-13, following 2022 cebc chapter 4d and appendix a-4.May 21, 2025Complete
- 801 Haight StSoft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4.Dec 12, 2019Complete
- 695 33rd Av #0Commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 201809130147Sep 13, 2018Complete
- 901 Greenwich StSoft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4Aug 30, 2017Complete
- 1175 Chestnut StSeismic upgrade for soft story as per sfebc, chapter 4d, 2016 cebc appendix a4Jul 12, 2017Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 6, 2026 | 2100 Pine St Remove (e) wood bearing wall and provide (n) beam & (n) columns at grid lines 4 at 3rd fl. provide (n) wood shear wall panels @ grid line a,b & d at 1st fl. provide (n) wood beam for window opening at gridline 1 at 2nd & 3rd fl. Issued | Home remodel | Issued | Within 1 month | |
| Sep 4, 2026 | 250 El Camino Del Mar Mod & replace ext finishes - replace windows and skylight. infill at 2 terraces on 3/f. n/s 2/f - infill patio under overhang. mod front bay. at roof terrace provide (n) w/p membrane, new ceramic paves on pedestals,(n) railings. add sauna & laundry. ab-112 Filed | OtherType unconfirmed | Filed | — | |
| Jul 8, 2026 | 2001 Fillmore St @ e uft shaft @ ground fl: remove e lift. remove e wood post @ lift area. provide new steel columns, n steel columns, new beam at 2nd fl. new lift by others. Issued | Home remodel | Issued | 1 month | |
| Feb 24, 2026 | 1729 Polk St #0 G/f: demo (e) portion of 1/f courtyard and replace with new floor. remove portion of (e) concrete topping and replace with new topping as shown on plan. deck is for residential use only. Complete | Commercial or tenant improvementType unconfirmed | Complete | Within 1 month | |
| May 21, 2025 | 1650 Jones St #0 Mandatory soft story retrofit in accordance with city ordinance 66-13, following 2022 cebc chapter 4d and appendix a-4. Complete | Seismic retrofit or foundation | Complete | 4 months | |
| Jul 26, 2024 | 900 Pine St Revision to pa # 202407106178: at gridline 2: remove (e) wood wall between 1/f & 2/f, provide new beam at 2/f w/ new post and footing. Complete | Revision or supplement | Complete | Within 1 month | |
| Jul 11, 2024 | 565 Chenery St Legalize a 2-story, 246 sq. ft. +/-, rear yard-facing addition to a sfr that was built without a permit, perform sterngthening of existing vertical and lateral force resisting elements to be in compliance with current building code requirements. Complete | Legalize or fix a violation | Complete | 1 month | |
| Jun 24, 2024 | 160 Noe St Remodel kitchen and bath at unit 160. reconfigure closets and interior partitions, open wall between kitchen and living area. remodel kitchen and bath at unit 162. reconfigure closets and interior partitions, open wall between kitchen and living area Complete | Home remodel | Complete | Within 1 month | |
| Apr 23, 2024 | 1350 Washington St 1) remove portion extg damaged retaining wall and replace with new pour in place concrete retaining wall at grid line a. 2) remove extg damaged footing and replace with new pour in place concrete footing at grid line b Complete | Retaining wall or site work | Complete | Within 1 month | |
| Dec 11, 2023 | 808 Cabrillo St Structural stengthening of existing building (voluntary). Complete | Home remodel | Complete | Within 1 month | |
| Dec 4, 2023 | 2660 Webster St Remove (e) damaged 5 ft height retaining wall with new pour in place concrete retaining wall at grid line a. Complete | Retaining wall or site work | Complete | Within 1 month | |
| Jul 7, 2023 | 332 Presidio Av Provide new concrete wall panel to strenghten existing damage retaining wall to comply with nov 202200131 Complete | Legalize or fix a violation | Complete | Within 1 month | |
| Jun 29, 2023 | 3263 Mission St To comply w/ nov #202304518 remove (e) illegal additon at back of building. inatall resilient channel 5/8 dej wall over e) plastered ceiling for sound @ 3265 mission. horizontal addition under pa2015-1118-3037 to be recognized by planning Complete | Legalize or fix a violation | Complete | 11 months | |
| Dec 12, 2019 | 830 Hayes St Revision to app#201907095444 for soft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4. revision at moment frames and relocate shearwall from line 1 to line 1.3 Complete | Revision or supplement | Complete | Within 1 month | |
| Dec 12, 2019 | 801 Haight St Soft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4. Complete | Seismic retrofit or foundation | Complete | Within 1 month | |
| May 20, 2019 | 43 Buena Vista Tr Interior remodel and minor extg improvement incl. increase with of gargae, door, nw int. stair, replace extg windw, kitchen remodel, bathroom remodel, nw laundry room, addition at basement & 1st fl., demo of exterior & interior stair in non-shared lightwell (south side of bldg) Complete | AdditionType unconfirmed | Complete | 2 months | |
| Sep 13, 2018 | 695 33rd Av #0 Commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 201809130147 Complete | Seismic retrofit or foundation | Complete | 34 months | |
| Jun 14, 2018 | 160 10th St 1) revision to app#201803234524. 2)provide new gas meter room. 3)replace extg roll up door at south wall. 4)relocate accessible bathroom. Complete | Revision or supplement | Complete | Within 1 month | |
| Nov 3, 2017 | 1250 Vallejo St #0 Revision to pa 2017-0621-0010 & 2017-1013-1222 - shift steel frame @ line 1; revise shear walls Complete | Revision or supplement | Complete | Within 1 month | |
| Sep 22, 2017 | 1429 Valencia St Rev to pa#201609289070: replace (e) front windows @ grid line (6). demo (e) wood siding, barn door & provide (n) store front @ g.l. (6) . reconfigure accessible restrooms. n/a maher Complete | Revision or supplement | Complete | 2 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Javed Jaffarali Tharani? Request a correction.