Jeffrey B E Logan
Architect · Lapnog Architecture · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-22634First issued Sep 10, 1991, expires Jan 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 24 permits since 2015, 24 in the last 5 years. Latest filed Dec 11, 2025.
- What kind of projects?
- Home remodel 11 · Other 4 · Legalize or fix a violation 3
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 11 permits in San Francisco
Time to get a permit
Median from filing to permit, from 11 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 14,919 permits.
Where
- Mission4
- Inner Sunset2
- Sunset/Parkside1
- Castro/Upper Market1
Most recent
- 1455 Eucalyptus Dr(n) deck from kitchen to rear yard. interior remodel: remodel (e) ktchen & bathroom w/ new fixtures & finishes. replace (e) windows, none face street. new bathroom & replace internal stair. convert space behind garageOct 3, 2024Complete
- 617 Castro St #0Interior remodel. e kitchen , new appliances, fixtures, finishes.e 1/2 bath converted into new laundry, e office converted int new bath. replace 2 e windows in light courtsJun 26, 2024Complete
- 753 Vermont St1/f: ugrade electrical in living room & bedroom 3, remove fireplace, patch floor/walls in-kind; 2/f: add new bathroom, remodel (e) bathroom; garage: install new car chargerMay 26, 2023Complete
- 997 Dolores St #0Kitchen remodel- remove partition, new cabinets, flooring. replace 4 windows in-kind not visible from street. relocate elec subpanel. add new hvac, condensor on roof, 3 mini split in bedrooms.Jun 10, 2022Complete
- 104 Robinhood DrRemodel s.f.d.: replace extg kitchen and bathroom finishes/fixtures on main level. replace extg bathroom fixtures on lower level 1. replace all remaining extg alum windows, not visible from street. convert unwarranted bathroom & family room on lower level 2. repair extg deck on main leve in kind.Dec 16, 2019Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Jun 5, 2026 | 2578 Great Hy Revision to permit#202611240327, revise upper sloped roof framing from post & beam to 2x10 joists w/ gwb ceiling & 3rd spayed insulation, revise 3rd floor framing to increase size of floor opening for the stair. no change to height or area of building, no change to front & rear elevations. Issued | Revision or supplement | Issued | Within 1 month | |
| Dec 11, 2025 | 2578 Great Hy Remodel of (e) 3 story single family residence. horizontal addition on 3 levels in rear. add one bedroom local program adu on 1st floor. vertical extension with new siding & windows throughout. Issued | ADU | Issued | 2 months | |
| Oct 15, 2024 | 4248 25th St Replace existing exterior egress stair and landings, in-kind Withdrawn | Deck, stairs or patio cover | Withdrawn | — | |
| Oct 3, 2024 | 1455 Eucalyptus Dr (n) deck from kitchen to rear yard. interior remodel: remodel (e) ktchen & bathroom w/ new fixtures & finishes. replace (e) windows, none face street. new bathroom & replace internal stair. convert space behind garage Complete | Home remodel | Complete | Within 1 month | |
| Jun 26, 2024 | 617 Castro St #0 Interior remodel. e kitchen , new appliances, fixtures, finishes.e 1/2 bath converted into new laundry, e office converted int new bath. replace 2 e windows in light courts Complete | Home remodel | Complete | 3 months | |
| Jun 22, 2023 | 851 Wisconsin St Horizontal addition on 2 levels in rear, new deck in rear, interior remodel, add 2 bedrooms and media room, and relocate bath on 1fl. relocate interior stairs 2f. remodel and relocate bath rm. new exterior windows and entrance at grade Complete | Addition | Complete | Within 1 month | |
| May 26, 2023 | 753 Vermont St 1/f: ugrade electrical in living room & bedroom 3, remove fireplace, patch floor/walls in-kind; 2/f: add new bathroom, remodel (e) bathroom; garage: install new car charger Complete | Home remodel | Complete | 1 month | |
| Feb 9, 2023 | 851 Wisconsin St Demo of (e) shed in rear yard in respond to complaint nov 202029551. Complete | Legalize or fix a violation | Complete | Within 1 month | |
| Jan 10, 2023 | 851 Wisconsin St Comply w/ complaint #201653633, #202296035: demo of existing deck. Complete | Legalize or fix a violation | Complete | Within 1 month | |
| Dec 21, 2022 | 5 Starview Wy Remove existing metal cladding, repair existing plaster, replace w/ synthetic wood cladding & plaster, replace existing vinyl & aluminum windows in e opening front visible, street windows remain. new deck at 2/f in rear yard. Complete | Other | Complete | 6 months | |
| Jun 10, 2022 | 997 Dolores St #0 Kitchen remodel- remove partition, new cabinets, flooring. replace 4 windows in-kind not visible from street. relocate elec subpanel. add new hvac, condensor on roof, 3 mini split in bedrooms. Complete | Home remodel | Complete | Within 1 month | |
| Dec 28, 2021 | 283 29th Av Remodel: repair and replace wood siding on west and south elevations. replace door and windows on west and south elevations in kind. replace existing deck in rear yard in kind. new partial concrete retaining wall. Complete | Other | Complete | 2 months | |
| Jan 29, 2021 | 51 Van Buren St Replace (e) two-tier deck, stair, and foundation with new deck, stair, and concrete piers. replace (e) siding, patio doors and windows on rear elevation with (mimimum .40 u-factor) new siding, waterproofing, patio doors, and windows. replace (e) rear fence with new rear fence Complete | Deck, stairs or patio cover | Complete | 6 months | |
| Jun 9, 2020 | 851 Wisconsin St To comply with nov 202029551: demo rear single wood (type v) shed. Withdrawn | Other | Withdrawn | — | |
| Dec 16, 2019 | 104 Robinhood Dr Remodel s.f.d.: replace extg kitchen and bathroom finishes/fixtures on main level. replace extg bathroom fixtures on lower level 1. replace all remaining extg alum windows, not visible from street. convert unwarranted bathroom & family room on lower level 2. repair extg deck on main leve in kind. Complete | Home remodel | Complete | Within 1 month | |
| Nov 20, 2019 | 88 Chilton Av Remodel (e) kitchen on 2nd fl. replace (3) exterior windows in-kind, kitchen, dining & stair. window replacement "in like-kind", same size & location. also, existing rated/non-rated windows may be replaced with same. Complete | Home remodel | Complete | Within 1 month | |
| Apr 5, 2019 | 1248 Treat Av Revision to 201810092535 replace front entry stair in-kind Issued | Revision or supplement | Issued | Within 1 month | |
| Oct 9, 2018 | 1248 Treat Av New half bath on 1st fl. facade restoration remove e alum siding and restor or replace orig wood siding. remove e alum windows and replace with custom wood dbl hung in kind Complete | Other | Complete | Within 1 month | |
| Nov 9, 2017 | 2032 14th Av Remodel (e) garage: addition of new office in existing envelope. relocate furnace & laundry. Complete | Home remodel | Complete | 4 months | |
| Jul 6, 2017 | 248 San Carlos St Demo (e) fireplace, re-arrange interior partitions for (n) master bedroom closet, add light to (n) closet. Complete | Home remodel | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Jeffrey B E Logan? Request a correction.